One story retail building
107 MOORE STREET
BROOKLYN · BIN 3071461
💬 Discuss this project
1978Year Built
1Stories
K1Building Class
R6Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: MOORE & MOORE LLC · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction30p · 3 filings · 20 docs
Bulkhead2p · 2 filings · 4 docs
PenthouseUnder Construction30p · 1 filing · 20 docs
Floor 4Under Construction30p · 4 filings · 20 docs
Floor 3Under Construction31p · 4 filings · 20 docs
Floor 2Under Construction29p · 4 filings · 20 docs
Floor 1Under Construction31p · 4 filings · 20 docs
CellarUnder Construction26p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS604/09/2026
ADOR BUILDERS503/22/2026
BUILDERS LLC ADOR103/22/2026
MOORE & MOORE LLC403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT703/11/2026
VASILIOS ARTEMIOU PE412/09/2025
KMA DESIGNS LLC107/23/2025
STEEL CORE ENGINEERING PLLC405/12/2025
RIKE TECH ASSOCIATES LLC302/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUNARD RAMAH303/21/2026
EXPRESS FILING INC2203/21/2026
PINE RE CONSULTING403/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor1907/08/2026
NESS MECHANICAL P & H INCPlumbing407/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor404/09/2026
ABRAHAM GELBElectrical203/21/2026
BROOKLYN POWER ELECTRIC C 005559General Contractor203/22/2026
FRIED ELECTRIC CO.Electrical103/22/2026
QUALITY PIPING, INCFire Protection107/08/2026
B CONTRACTORS GROUP LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161303/11/2026
MOHAMMAD AHEAD - PROFESSI9286107/23/2025
REGIONAL TESTING CORP.394112/31/2024
Building Lifecycle
All (180)Filed (19)Permit Issued (20)Signed Off (8)Violation (28)Inspection (11)Objection (64)Special Inspection (30)
04/08/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
04/08/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
04/03/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/13/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/13/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/13/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/13/2026
Special inspection requirement — Metering
FAHAD FATEH
03/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/13/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
03/13/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/13/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/13/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/13/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/13/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/13/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-P7
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/11/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/11/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/11/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
03/11/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/11/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/11/2026
Special inspection requirement — Metering
FAHAD FATEH
03/11/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/11/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/11/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/27/2026
Objection resolved — Addressed
01/22/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S4
01/22/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S2
01/20/2026
Objection raised — Admin
01/15/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-P6
01/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S3
01/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S5
01/12/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S7
01/05/2026
Permit issued — Structural
B01035995-S5-ST
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/22/2025
Permit issued — General Construction
B01035995-I1-GC
12/19/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S6
12/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/09/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-P5
12/08/2025
Permit issued — Mechanical Systems
B01035995-S2-MS
12/08/2025
Permit issued — General Construction
B01035995-I1-GC
12/04/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-S1
12/02/2025
Permit issued — Earth Work
B01035995-S6-EA
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.
B01258745-I1
10/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01035995-I1
B01035995-P4
09/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/02/2025
Permit issued — Supported Scaffold
B01258745-I1-SF
09/02/2025
Permit issued — Supported Scaffold
B01258745-I1-SH
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offADOR BUILDERS LLC01/05/2026
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC12/22/2025
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC12/08/2025
DOB NOWEarth WorkSigned-offADOR BUILDERS LLC12/02/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS09/02/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS09/02/2025
DOB NOWStructuralSigned-offADOR BUILDERS LLC08/01/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC07/31/2025
DOB NOWFoundationSigned-offADOR BUILDERS LLC06/12/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC05/20/2025
DOB NOWSprinklersSigned-offQUALITY PIPING, INC05/16/2025
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC05/12/2025
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC05/12/2025
DOB NOWFoundationSigned-offADOR BUILDERS LLC02/11/2025
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC01/22/2025
DOB NOWStructuralSigned-offADOR BUILDERS LLC01/15/2025
DOB NOWMechanical SystemsSigned-offB CONTRACTORS GROUP LLC01/14/2025
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC01/03/2025
BISBLISSUEDM & M PIPING AND HEATING02/01/2016
BISPLISSUEDM & M PIPING AND HEATING01/21/2016
BISEQISSUEDNOVA PLUMBING & HTG INC01/30/2003
BISOTISSUEDNOVA PLUMBING & HTG INC01/30/2003
BISPLISSUEDAVON PLBG & HTG INC01/30/2003
1 project · most recent 03/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026Signed-offADOR BUILDERS LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,000 BTU · Condensing Unit ×6
2MXM18AVJU9 18,500 BTU · Condensing Unit ×1
RXF18AXVJU 21,600 BTU · Condensing Unit ×1
1 project · most recent 03/11/2026
Sprinkler System
FiledStatusContractorScope
03/11/2026Signed-offQUALITY PIPING, INCSprinkler System
1 project · most recent 03/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/11/2026Signed-offQUALITY PIPING, INCGas, Storm, Water/Sanitary
3 projects · most recent 01/21/2026
General Wiring
FiledStatusContractorScope
01/21/2026CompleteBROOKLYN POWER ELECTRIC CGeneral Wiring
07/21/2025CompleteRICHARD NEU—
02/11/2025CompleteFRIED ELECTRIC CO.—
1 project · most recent 03/11/2026
Steel Wood
FiledStatusContractorScope
03/11/2026Signed-offADOR BUILDERS LLCSteel, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/08/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/08/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/03/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/18/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/17/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
03/13/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/13/2026Interior lighting powerFAHAD FATEHenergy_progress
03/13/2026Maintenance informationFAHAD FATEHenergy_progress
03/13/2026Lighting controlsFAHAD FATEHenergy_progress
03/13/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/13/2026MeteringFAHAD FATEHenergy_progress
03/13/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/13/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/13/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/13/2026Exterior lighting powerFAHAD FATEHenergy_progress
03/13/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/13/2026Fenestration areasFAHAD FATEHenergy_progress
03/13/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/13/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/13/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/11/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/11/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/11/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/11/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/11/2026Lighting controlsFAHAD FATEHenergy_progress
03/11/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/11/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/11/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/11/2026Maintenance informationFAHAD FATEHenergy_progress
03/11/2026Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 77.
▾Documents — 157 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch16
08/23/2026B01035995-P2Request digital key ↗
08/23/2026B01035995-P1Request digital key ↗
08/23/2026B01035995-S6Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00320159-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00320083-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00320110-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00320110-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION11
01/29/2026340921426Open ↗
01/27/2026322039398Open ↗
11/29/2021322039398Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION2
02/02/2016301495996Open ↗
01/28/2016301495996Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/17/2025340921426Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B01035995-P6Open ↗
08/13/2026B01035995-P7Open ↗
08/13/2026B01035995-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01035995-P7Open ↗
08/13/2026B01035995-I1Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/22/2021322039398Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/22/2021322039398Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/25/2021322039398Open ↗
▸BISZONING DIAGRAM1
11/22/2021322039398Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/23/2026B01035995-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/23/2026B01035995-P2Open ↗
08/23/2026B01035995-P1Open ↗
08/23/2026B01035995-S6Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026B01035995-P3Open ↗
09/02/2026B01035995-S2Open ↗
09/02/2026B01035995-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026B01035995-P3Open ↗
09/02/2026B01035995-P3Open ↗
09/02/2026B01035995-S2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/06/2020322039398Open ↗
10/02/2015301495996Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/17/2025340921426Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
09/30/2021322039398Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/17/2016301495996Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
12/17/2025340921426Open ↗
02/06/2020322039398Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/17/2025340921426Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01035995-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/23/2026B01035995-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01035995-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/23/2026B01035995-P1Open ↗
08/23/2026B01035995-S6Open ↗
08/23/2026B01035995-S5Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/06/2020322039398Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026B01035995-P3Open ↗
08/13/2026B01035995-S6Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/25/2021322039398Open ↗
▸BISSOIL REPORT1
08/25/2021322039398Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01035995-S6Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
08/20/2021322039398Open ↗
06/16/2021322039398Open ↗
02/06/2020322039398Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/28/2016301495996Open ↗
▸BISSUPERSEDING LETTER1
01/28/2016301495996Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
02/22/2020322039398Open ↗
02/22/2020322039398Open ↗
02/06/2020322039398Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/17/2025340921426Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/17/2025340921426Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial6
08/13/2026B01035995-P2Open ↗
08/13/2026B01035995-P4Open ↗
08/13/2026B01035995-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B01035995-P4Open ↗
08/13/2026B01035995-P1Open ↗
08/13/2026B01035995-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/23/2026B01035995-P2Open ↗
08/23/2026B01035995-P1Open ↗
08/23/2026B01035995-P4Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/17/2025340921426Open ↗
12/17/2025340921426Open ↗
▸BISPLOT DIAGRAM2
08/25/2021322039398Open ↗
02/06/2020322039398Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/25/2021322039398Open ↗
▸DOB NOWFinal Survey1
08/23/2026B01035995-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01035995-S6Open ↗