Full service hotel
Refinery Hotel New York
107 RIVINGTON STREET · BIN 1075676
💬 Discuss this project
2003Year Built
20Stories
H2Building Class
C4-4AZoning
59,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized7 Open Violations 1 unresolved · 6 paperwork only ▸FISP: SWARMP
Full service hotel · Owner of record: THE DOWNTOWN LLC · 5,084 sf lot · 11.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 20Under Construction10p · 1 filing · 12 docs
Floor 19Under Construction5p · 1 filing · 12 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Under Construction43p · 2 filings · 20 docs
Floor 1Under Construction42p · 3 filings · 20 docs
CellarUnder Construction48p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1204 BROADWAY DE5007/08/2026
PLATINUM SERVICES NY1607/08/2026
REFINERY HOTEL604/09/2026
DOWNTOWN11103/22/2026
THE DOWNTOWN LLC HOTEL ON1103/22/2026
THE DOWNSTOWN LLC103/22/2026
RENAM DEVELOPMENT1503/22/2026
RENAM DEV LLC203/22/2026
RNAM DEVELOPMENT LLC103/22/2026
THE DOWNTOEN LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1603/21/2026
T C DESIGN203/21/2026
GREEN STUDIO203/21/2026
PLATINUM SERVICES NY603/21/2026
DRAFT MASTER ENGINEERING PC603/21/2026
AE DESIGN SOLUTION203/21/2026
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOJI DEVELOP NY INCGeneral Contractor1507/08/2026
TOJI CONSTRUCTION LLCGeneral Contractor1407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor707/08/2026
I DO PLUMBING & HTG INCPlumbing607/08/2026
PROJECT NOOM INCGeneral Contractor207/08/2026
AVON PLBG & HTG INCFire Protection207/08/2026
MEGA MECHANICAL INCGeneral Contractor203/21/2026
PRO STAR PLBG,HTG&MECH INPlumbing107/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
HINKE, WILLIAMElectrical103/21/2026
JACKUS, STEVEElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
ANTHONY LUCIANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758204/29/2026
SONI ENGINEERING CONSULTI9819111/24/2025
ACE STRUCTURAL ENGINEERIN496710/03/2023
SRA INSPECTIONS3461410/03/2023
DRAFT MASTER ENGINEERING701411/05/2019
Building Lifecycle
All (210)Filed (24)Permit Issued (27)Signed Off (1)Facade (FISP) (12)Violation (60)Inspection (2)Objection (54)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
05/07/2026
Violation issued (ECB, closed)
Unknown
04/29/2026
Filed — Alteration CO
CONVERT EXISTING HOTEL ROOM INTO HOTEL LOUNGE ON 19TH AND 2OTH FLOOR AS PER PLAN. OBTAIN NEW C OF O TO ADDRESS VIOLATIONS.
M01209146-P1
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
04/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
03/20/2026
Permit issued — Plumbing
M01209146-S2-PL
02/12/2026
Cycle 9 facade report signed — SWARMP
02/04/2026
Filed — Alteration CO
CONVERT EXISTING HOTEL ROOM INTO HOTEL LOUNGE ON 19TH AND 2OTH FLOOR AS PER PLAN. OBTAIN NEW C OF O TO ADDRESS VIOLATIONS.
M01209146-S2
02/03/2026
Cycle 9 facade inspection completed
01/21/2026
Permit issued — Sidewalk Shed
M00827670-I1-SH
01/21/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Admin
01/14/2026
Filed — Alteration
facade inspection
M01345932-I1
12/15/2025
Objection resolved — Resolved
12/15/2025
Objection resolved — Resolved
12/15/2025
Objection resolved — Resolved
12/15/2025
Objection resolved — Resolved
12/15/2025
Objection resolved — Resolved
12/15/2025
Objection resolved — Resolved
12/15/2025
Objection resolved — Resolved
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Cost
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Energy
12/11/2025
Objection raised — Plumbing
12/11/2025
Objection raised — Plumbing
12/11/2025
Objection raised — Plumbing
12/03/2025
Filed — Alteration CO
CONVERT EXISTING HOTEL ROOM INTO HOTEL LOUNGE ON 19TH AND 2OTH FLOOR AS PER PLAN. OBTAIN NEW C OF O TO ADDRESS VIOLATIONS.
M01209146-S1
11/28/2025
Objection raised — Other
11/24/2025
Filed — Alteration
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE AND LOCAL LAW INSPECTION
M01322360-I1
11/12/2025
Permit issued — Mechanical Systems
M00883470-S1-MS
11/12/2025
Permit issued — General Construction
M08004615-I1-GC
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/09/2025
Objection raised — Scope
06/13/2025
Violation issued (HPD, closed)
A
06/03/2025
Special inspection requirement — Maintenance information
05/22/2025
Objection raised — Energy
05/22/2025
Objection raised — Fire_Protection
05/22/2025
Objection raised — Fire_Protection
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Fire_Protection
05/22/2025
Objection raised — Fire_Protection
05/22/2025
Objection raised — Accessibility
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Structural
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Structural
05/22/2025
Objection raised — Structural
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Accessibility
05/22/2025
Objection raised — Fire_Protection
05/22/2025
Objection raised — Zoning
05/22/2025
Objection raised — Zoning
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPRO STAR PLBG,HTG&MECH IN03/20/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/21/2026
DOB NOWMechanical SystemsPermit IssuedTOJI CONSTRUCTION LLC11/12/2025
DOB NOWGeneral ConstructionPermit IssuedTOJI CONSTRUCTION LLC11/12/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/23/2025
DOB NOWPlumbingPermit IssuedI DO PLUMBING & HTG INC09/10/2024
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC09/10/2024
DOB NOWConstruction FencePermit IssuedTOJI CONSTRUCTION LLC09/05/2024
DOB NOWStructuralSigned-offTOJI CONSTRUCTION LLC09/05/2024
DOB NOWMechanical SystemsPermit IssuedTOJI CONSTRUCTION LLC09/05/2024
DOB NOWGeneral ConstructionPermit IssuedTOJI CONSTRUCTION LLC08/28/2024
DOB NOWGeneral ConstructionPermit IssuedTOJI DEVELOP NY INC06/06/2024
DOB NOWStructuralSigned-offTOJI DEVELOP NY INC06/06/2024
DOB NOWConstruction FencePermit IssuedTOJI DEVELOP NY INC05/20/2024
DOB NOWMechanical SystemsPermit IssuedTOJI DEVELOP NY INC05/20/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/18/2024
DOB NOWGeneral ConstructionPermit IssuedTOJI DEVELOP NY INC10/30/2023
DOB NOWMechanical SystemsPermit IssuedTOJI DEVELOP NY INC09/05/2023
DOB NOWPlumbingPermit IssuedI DO PLUMBING & HTG INC08/30/2023
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC08/30/2023
DOB NOWGeneral ConstructionPermit IssuedPROJECT NOOM INC07/25/2023
DOB NOWConstruction FencePermit IssuedTOJI DEVELOP NY INC07/13/2023
DOB NOWGeneral ConstructionPermit IssuedPROJECT NOOM INC07/07/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATINUM SERVICES NY LLC06/21/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/16/2023
DOB NOWMechanical SystemsPermit IssuedMEGA MECHANICAL INC09/26/2019
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP08/02/2019
BISMHISSUEDCURAM CONTRACTING, LLC09/18/2019
BISMHISSUEDPEROTTO CONSULTING&MGT IN02/28/2019
BISEQISSUEDPHOENIX SUTTON STR INC02/25/2016
BISEQISSUEDPHOENIX SUTTON STR INC02/25/2016
BISOTISSUEDPM RESTORATIONS INC01/21/2016
BISOTISSUEDPM RESTORATIONS INC01/21/2016
BISPLISSUEDSKINNER PLUMBING & HEATING03/15/2013
BISOTISSUEDHIGH POWER CONSTRUCTION C02/27/2013
BISOTISSUEDMULBERRY GROUP CONSTR LLC08/09/2010
BISEQISSUEDTHE DOWNTOWN LLC08/15/2007
BISOTISSUEDTHE DOWNTOWN LLC08/15/2007
BISPLISSUEDDANICA PLUMB HEAT LLC07/26/2005
BISPLISSUEDDANICA PLUMB HEAT LLC07/26/2005
+ 37 more permits on file
1 project · most recent 10/03/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2023Permit IssuedTOJI CONSTRUCTION LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Climatemaster TE-V-038 41,200 BTU · Wshp ×2
TE-V-064 67,500 BTU · Wshp ×2
TE-H-072 73,800 BTU · Wshp ×1
TE-V-072 73,800 BTU · Wshp ×1
TR-V-018 14,300 BTU · Wshp ×1
Ventilation
1 project · most recent 10/03/2023
FiledStatusContractorScope
10/03/2023Permit IssuedAVON PLBG & HTG INC62 heads
3 projects · most recent 04/29/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/29/2026Permit IssuedPRO STAR PLBG,HTG&MECH INWater/Sanitary
10/03/2023Permit IssuedI DO PLUMBING & HTG INCWater/Sanitary
11/05/2019Permit IssuedDPH PLUMBING & HTG CORPGas
4 projects · most recent 07/02/2025
General Wiring Lighting
FiledStatusContractorScope
07/02/2025Permit IssuedJAM ELECTRICAL CORP—
02/26/2025CompleteAMKO ELEC CONST & MAINT IGeneral Wiring
08/28/2023Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
02/16/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 10/03/2023
Steel
FiledStatusContractorScope
10/03/2023Permit IssuedTOJI CONSTRUCTION LLCSteel
1 project · most recent 09/21/2023
Fence
FiledStatusContractorScope
09/21/2023Permit IssuedTOJI CONSTRUCTION LLCFence
2 projects · most recent 01/14/2026
FiledStatusContractorScope
01/14/2026———
11/24/2025———
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/28/2026Energy Code Compliance InspectionsEric Sunprogress
04/28/2026Fire-Resistant Penetrations and JointsEric Sunspecial
04/28/2026HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/12/2025Fire-Resistant Penetrations and Joints—special
11/12/2025Energy Code Compliance Inspections—progress
11/12/2025HVAC-R and service water piping design and insulation—energy_progress
06/03/2025Maintenance information—energy_progress
05/06/2025Lighting controls—energy_progress
05/06/2025Interior lighting power—energy_progress
05/06/2025Fire-Resistant Penetrations and Joints—special
05/06/2025Energy Code Compliance Inspections—progress
05/06/2025Fire-Resistance Rated Construction—progress
03/22/2024Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
03/22/2024Fire-Resistance Rated ConstructionANTHONY UGBEBORprogress
03/22/2024Lighting controlsANTHONY UGBEBORenergy_progress
03/22/2024Fenestration air leakageANTHONY UGBEBORenergy_progress
03/22/2024Interior lighting powerANTHONY UGBEBORenergy_progress
03/22/2024Fenestration and door U-factor and product ratingsANTHONY UGBEBORenergy_progress
03/22/2024Fenestration areasANTHONY UGBEBORenergy_progress
03/22/2024FinalANTHONY UGBEBORprogress
10/03/2023Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
10/03/2023Tenant Protection Plan ComplianceAdrian Figueroaspecial
09/21/2023Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
09/21/2023Tenant Protection Plan ComplianceAdrian Figueroaspecial
07/19/2023Post-installed AnchorsANTHONY UGBEBORspecial
Latest 25 of 43.
▾Documents — 230 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch19
08/30/2026M00833625-I1Request digital key ↗
08/29/2026M00883470-S1Request digital key ↗
08/29/2026M00883470-S2Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00191890-I1Request digital key ↗
08/15/2026M00191890-P2Request digital key ↗
08/15/2026M00191890-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00191890-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M00993017-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION13
12/26/2025141029027Open ↗
04/23/2025141026798Open ↗
06/12/2019104175955Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
09/18/2019123760180Open ↗
03/01/2019123851956Open ↗
02/24/2016140455530Open ↗
Showing 3 of 9 on file for this type
▸BISPLACE OF ASSEMBLY4
06/17/2019104175955Open ↗
12/06/2017104175955Open ↗
12/06/2017104175955Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWState DEC Permit3
09/05/2026M00191890-I1Open ↗
08/13/2026M00191890-P2Open ↗
08/13/2026M00191890-P1Open ↗
▸Seals & Professional Certifications86
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/05/2026M00191890-I1Open ↗
08/29/2026M00900095-I1Open ↗
08/27/2026M00827670-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/04/2026M00883470-I1Open ↗
09/04/2026M00883470-I1Open ↗
09/02/2026M00883470-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
10/10/2019123760180Open ↗
08/02/2019123760180Open ↗
05/06/2019123760180Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M00191890-P1Open ↗
09/01/2026M00191890-S1Open ↗
09/01/2026M00191890-S1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/01/2019123851956Open ↗
02/24/2016140455530Open ↗
02/24/2016140455530Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/26/2025141029027Open ↗
04/23/2025141026798Open ↗
02/24/2016140455530Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/26/2025141029027Open ↗
04/23/2025141026798Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/24/2016140455530Open ↗
02/24/2016140455488Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/01/2019123851956Open ↗
07/27/2010120421409Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/27/2010120421409Open ↗
▸Trade Schedules & Equipment10
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/16/2019123760180Open ↗
03/13/2019123851956Open ↗
03/13/2019123851956Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
05/06/2013120421409Open ↗
04/11/2013120421409Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
01/22/2018123257260Open ↗
01/22/2018123257260Open ↗
▸BISSCHEDULE B - PLUMBING1
07/27/2010120421409Open ↗
▸BISEQUIPMENT USE PERMITS1
10/16/2019123760180Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES4
02/24/2016140455530Open ↗
02/24/2016140455488Open ↗
08/02/2019123760180Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00191890-I1Open ↗
08/13/2026M00191890-P2Open ↗
08/13/2026M00191890-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026M00883470-S1Open ↗
08/13/2026M00883470-S2Open ↗
08/13/2026M00883470-S3Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/27/2010120421409Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
10/10/2019123760180Open ↗
08/02/2019123760180Open ↗
03/01/2019123851956Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/10/2019123760180Open ↗
03/13/2019123851956Open ↗
12/19/2017122570100Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/26/2025141029027Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/26/2025141029027Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/24/2016140455488Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/26/2025141029027Open ↗
04/23/2025141026798Open ↗
02/24/2016140455530Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/10/2019123760180Open ↗
03/13/2019123851956Open ↗
12/19/2017122570100Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/12/2019104175955Open ↗
03/13/2019123851956Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
06/12/2019104175955Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/27/2010120421409Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
12/26/2025141029027Open ↗
04/23/2025141026798Open ↗
10/10/2019123760180Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION9
08/02/2019123760180Open ↗
12/06/2017104175955Open ↗
02/27/2017122570100Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
05/06/2019123760180Open ↗
03/01/2019123851956Open ↗
12/06/2017123266688Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM6
10/10/2019123760180Open ↗
06/17/2019104175955Open ↗
06/12/2019104175955Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/26/2025141029027Open ↗
04/23/2025141026798Open ↗
02/24/2016140455530Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸DOB NOWIRA Certification2
08/13/2026M01345932-I1Open ↗
08/13/2026M01322360-I1Open ↗
▸BISSupporting Document: Fee Exempt1
01/22/2016122570100Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026M01209146-I1Open ↗