← Back
BuildNYC
Predominantly retail with other uses
107 SOUTH STREET
MANHATTAN · BIN 1001330
💬 Discuss this project
1819Year Built
4.5Stories
K4Building Class
C6-2AZoning
8,283 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: South Street 107 · 2,011 sf lot · 4.12 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof5 filings
Floor 64 filings
Floor 55 filings
Floor 45 filings
Floor 35 filings
Floor 25 filings
Floor 17 filings
Mezzanine4 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
107 South Street203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services303/11/2025
Concord Associates609/11/2024
Leonid Krupnik, P.E405/25/2023
Opera Studio Architecture108/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR Expediting Design603/21/2026
Opera Studio Architecture403/21/2026
BMG Group USA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
David Constructing NYGeneral Contractor607/08/2026
Steel ConstructionScaffold404/09/2026
DI MartiniGeneral Contractor403/21/2026
Ariana ContractingPlumbing307/08/2026
Ariana ContractingFire Protection307/08/2026
John Evan ContractingGeneral Contractor204/09/2026
Mercury Building AssociatesGeneral Contractor107/15/2026
Moken Home ImprovementGeneral Contractor107/09/2026
RPJ ElectricElectrical103/21/2026
C & A Elect'l ContractingElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129209/11/2024
HRF Services5616105/25/2023
Leonid Krupnik, PE6710105/25/2023
Opera Studio Architecture5970205/16/2023
WGC Solutions4673109/08/2022
Building Lifecycle
All (113)Filed (14)Permit Issued (9)Signed Off (3)Violation (20)Inspection (5)Objection (18)Special Inspection (30)
09/17/2026
Signed off — Alteration
M01143166-I1
09/17/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01143171-I1
08/11/2026
Signed off — Alteration
Structural Application filed for Structural framing for floors throughout, filed in conjunction with DOB BIS Alt I Appl # 121207452. No change to egress, occupancy or use.
M00854325-I1
08/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/14/2026
Permit issued — Mechanical Systems
M00834382-I1-MS
07/07/2026
Permit renewed — General Construction
Renewed with changes
M00854325-I1-GC-CX
06/02/2026
Permit renewed — Sprinklers
Renewed without changes
M00834374-I1-EW-SP
05/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/29/2026
Closed: Building has been observed having special inspector nanik massand removed from application M00854325-I1 due to surrendering of filing privileges.…
DOB violation · closed on the city's record
04/22/2026
Permit renewed — Plumbing
Renewed without changes
M00834355-I1-PL
03/27/2026
Permit renewed — Structural
Renewed without changes
M00854325-I1-GC-CX
02/19/2026
Closed: Building has been observed having special inspector nanik massand removed from application M00834374-I1 due to surrendering of filing privileges.…
DOB violation · closed on the city's record
12/02/2025
Building has been observed having special inspector nanik massand removed from application M00854325-I1 due to surrendering of filing privileges.…
DOB violation · closed
12/02/2025
Building has been observed having special inspector nanik massand removed from application M00834374-I1 due to surrendering of filing privileges.…
DOB violation · closed
11/07/2025
Permit renewed — Sidewalk Shed
Renewed without changes
M01143166-I1-SH
11/06/2025
Permit renewed — Supported Scaffold
Renewed without changes
M01143171-I1-SF
05/28/2025
Permit renewed — Sprinklers
Renewed without changes
M00834374-I1-EW-SP
04/08/2025
Permit renewed — Plumbing
Renewed without changes
M00834355-I1-PL
03/11/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01143171-P1
02/11/2025
Observed supported scaffold at exp. 1 & 3 in unsafe condition with more than 1 fully planked working deck contrary to DOB approved supported…
ECB violation · open
02/05/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
M00777235-I1-GC
02/05/2025
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
M00777235-S1-GC-CX
12/12/2024
Permit issued — Foundation
M00854325-I1-GC-CX
12/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/18/2024
Permit issued — Supported Scaffold
M01143171-I1-SF
11/18/2024
Permit issued — Sidewalk Shed
M01143166-I1-SH
11/15/2024
Filed — Alteration
M01143166-I1
11/15/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01143171-I1
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
09/24/2024
Special inspection requirement — Maintenance information
Thomas Barry
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
09/20/2024
Objection resolved — Addressed
09/18/2024
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
09/17/2024
Objection raised — Other
09/11/2024
Filed — Alteration
Install Complete wet pipe sprinkler system throughout. No Change to egress, occupancy or use.
M00834374-P1
09/11/2024
Filed — Alteration
Application filed for Plumbing fixture modification and installation throughout building in conjunction with Application # M00777235. No change to egress, occupancy or use.
M00834355-P1
09/11/2024
Filed — Alteration
Install AC units on Roof and Mechanical and Exhaust system & Components throughout. No change to egress, occupancy or use.
M00834382-P1
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
08/29/2024
Special inspection requirement — Final
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
08/29/2024
Special inspection requirement — Mechanical Systems
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
08/29/2024
Special inspection requirement — Maintenance information
Thomas Barry
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
08/29/2024
Special inspection requirement — Maintenance information
08/29/2024
Special inspection requirement — Shutoff dampers
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
08/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
05/23/2024
Permit issued — Sprinklers
M00834374-I1-EW-SP
03/27/2024
Permit issued — Plumbing
M00834355-I1-PL
02/05/2024
Permit renewed — General Construction
Renewed without changes
M00777235-I1-GC
02/05/2024
Permit renewed — Structural
Renewed without changes
M00777235-S1-GC-CX
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Mercury Building Associates—
DOB NOW—Moken Home Improvement—
DOB NOW—Ariana Contracting—
DOB NOW—Ariana Contracting—
DOB NOW—John Evan Contracting—
DOB NOW—Steel Construction—
DOB NOW—Steel Construction—
DOB NOW—Ariana Contracting—
DOB NOW—Ariana Contracting—
DOB NOW—John Evan Contracting—
DOB NOW—Steel Construction—
DOB NOW—Steel Construction—
DOB NOW—Ariana Contracting—
DOB NOW—Ariana Contracting—
DOB NOW—David Constructing NY—
DOB NOW—David Constructing NY—
DOB NOW—David Constructing NY—
DOB NOW—David Constructing NY—
DOB NOW—DI Martini—
DOB NOW—DI Martini—
BIS—John Evan Contracting—
BIS—John Evan Contracting—
BIS—G.N. Construction—
BIS—G.N. Construction—
BIS—Dean Builders Group—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00614006-P1Request the plans ↗
09/02/2026M00777235-I1Request the plans ↗
09/02/2026M00777235-S1Request the plans ↗
Showing 3 of 14 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION12
05/16/2024121207452Open ↗
05/14/2024121207452Open ↗
06/15/2023121207452Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLPC Approval/Permit9
08/26/2026M00834355-I1Open ↗
08/15/2026M00614006-I1Open ↗
08/13/2026M00854325-I1Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
01/06/2025121207452Open ↗
01/25/2013121455727Open ↗
12/11/2012121455727Open ↗
Showing 3 of 4 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/27/2024121207452Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/11/2020121207452Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/25/2024121207452Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/13/2023121207452Open ↗
▸BISFLOOD ZONE COMPLIANCE1
03/24/2025121207452Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/13/2023121207452Open ↗
▸BISZONING DIAGRAM1
06/13/2023121207452Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/13/2023121207452Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026M00614006-I1Open ↗
09/02/2026M00777235-I1Open ↗
09/02/2026M00777235-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/26/2026M00777235-S1Open ↗
08/26/2026M00777235-S1Open ↗
08/26/2026M00777235-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
10/01/2026M00834355-I1Open ↗
10/01/2026M00834355-I1Open ↗
09/14/2026M00834355-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/11/2012121455727Open ↗
09/11/2008110337047Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/11/2012121455727Open ↗
09/11/2008110337047Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/11/2012121455727Open ↗
▸Trade Schedules & Equipment1
▸BISSPRINKLER SYSTEMS1
03/24/2025121207452Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/25/2024121207452Open ↗
▸BISSTREET TREE CHECKLIST1
04/20/2020121207452Open ↗
▸BISTenant Protection Plan and Notes1
04/20/2020121207452Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00777235-I1Open ↗
09/02/2026M00777235-S1Open ↗
08/26/2026M00834355-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026M00854325-I1Open ↗
08/26/2026M00834382-I1Open ↗
08/13/2026M00834374-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/15/2008110337047Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/25/2024121207452Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/20/2020121207452Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/25/2024121207452Open ↗
▸Inspections & Test Reports9
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/25/2024121207452Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/25/2024121207452Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/25/2024121207452Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/25/2024121207452Open ↗
▸BISMASONRY1
09/25/2024121207452Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/20/2020121207452Open ↗
▸BISMECHANICAL SYSTEMS1
09/25/2024121207452Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00777235-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M00777235-S1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
05/16/2024121207452Open ↗
05/14/2024121207452Open ↗
06/15/2023121207452Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/11/2012121455727Open ↗
09/11/2008110337047Open ↗
▸BISLANDMARKS APPROVAL1
10/05/2021121207452Open ↗
▸BISSHED LETTER1
01/25/2013121455727Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/06/2025121207452Open ↗
12/27/2024121207452Open ↗
▸BISCOST AFFIDAVIT1
06/13/2023121207452Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
12/27/2024121207452Open ↗
▸BISINSURANCE: DISABILITY1
12/27/2024121207452Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION7
06/17/2024121207452Open ↗
06/07/2024121207452Open ↗
06/13/2023121207452Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
05/28/2020121207452Open ↗
12/11/2012121455727Open ↗
09/11/2008110337047Open ↗
▸Other Documents9
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
05/28/2020121207452Open ↗
05/28/2020121207452Open ↗
▸BISLOWEST FLOOR ELEVATION1
09/25/2024121207452Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
09/25/2024121207452Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
09/25/2024121207452Open ↗
▸BISPLOT DIAGRAM1
04/20/2020121207452Open ↗
▸BISECCCNYS ANALYSIS1
05/11/2020121207452Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/26/2023121207452Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026M00854325-I1Open ↗