← Back
Elevator apt, luxury type
107 UNIVERSITY PLACE
MANHATTAN · BIN 1009196
💬 Discuss this project
1940Year Built
6Stories
D8Building Class
C1-7Zoning
43,395 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Elevator apt, luxury type · Owner of record: 107 UNIVERSITY ASSOCIATES · 7,200 sf lot · 6.03 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 61p · 1 filing · 7 docs
Floor 51p · 1 filing · 7 docs
Floor 43p · 2 filings · 14 docs
Floor 31p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 17p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WYDOWN MANAGEMENT2007/08/2026
CEPRINE CONSTRUCTION507/08/2026
107 UNIVERSITY ASSOC.203/22/2026
PIECE MANAGEMENT103/22/2026
107 UNIVERSITY PLACE1203/21/2026
107 UNIVERSITY PLACE PARTNERSHIP203/21/2026
107 UNIVERSITY PL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M JUST ARCHITECTURE PC305/20/2025
NEW YORK DESIGN ARCHITECTS, LLP404/04/2024
KZ ENGINEERING, P.C108/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS203/21/2026
NEW YORK DESIGN ARCHITECTS803/21/2026
JUST ARCHITECTURE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIECE MANAGEMENT INCGeneral Contractor607/08/2026
CASELLA CONSTRUCTION CORP.General Contractor203/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor207/08/2026
MARCIAL, MARIOElectrical103/21/2026
MODERN VOLTAGE NYC INCElectrical103/22/2026
SHORR, GLENNElectrical103/21/2026
WRUBEL, CHAIMElectrical103/21/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
BISHUNDAT, CHRISTOPHERElectrical103/21/2026
HYDRO MECHANICAL INCPlumbing107/08/2026
CHAIM MILCHMANElectrical103/21/2026
INGLESE, PASQUALEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665109/23/2024
AA BUILDING & INSPECTION1519208/09/2024
AKS ARCHITECTURAL & ENGIN1957204/04/2024
Building Lifecycle
All (128)Filed (9)Permit Issued (10)Signed Off (6)Facade (FISP) (12)Violation (58)Inspection (3)Special Inspection (30)
09/11/2025
Violation issued (HPD, closed)
B
09/11/2025
Violation issued (HPD, closed)
B
09/11/2025
Violation issued (HPD, open)
B
06/16/2025
Signed off — Alteration
M01089912-I1
06/16/2025
Signed off — Alteration
Plumbing work at 4th floor apt. #4D due to fire damage indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
M01089943-I1
06/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
05/20/2025
Filed — Alteration
Plumbing work at 4th floor apt. #4D due to fire damage indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
M01089943-P2
05/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2025
Violation issued (HPD, closed)
C
04/18/2025
Violation issued (HPD, closed)
B
04/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2025
Violation issued (HPD, closed)
C
11/12/2024
Permit issued — Plumbing
M01089943-I1-PL
09/27/2024
Permit issued — Suspended Scaffold
M01114902-I1-SC
09/23/2024
Filed — Alteration
M01114902-I1
09/12/2024
Permit issued — General Construction
M01089912-I1-GC
08/09/2024
Filed — Alteration
M01089912-I1
08/09/2024
Filed — Alteration
Plumbing work at 4th floor apt. #4D due to fire damage indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
M01089943-I1
08/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
08/01/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
08/01/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
08/01/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/01/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/01/2024
Special inspection requirement — Metering
Younes Abouyaala
08/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/01/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
08/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/01/2024
Special inspection requirement — Final
NAVEEN KUMAR
07/01/2024
Violation issued (HPD, closed)
I
07/01/2024
Violation issued (HPD, closed)
I
07/01/2024
Violation issued (HPD, closed)
I
07/01/2024
Violation issued (HPD, closed)
I
07/01/2024
Violation issued (HPD, closed)
I
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
B
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
B
06/11/2024
Violation issued (HPD, closed)
B
06/11/2024
Violation issued (HPD, closed)
B
06/11/2024
Violation issued (HPD, closed)
B
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
C
06/11/2024
Violation issued (HPD, closed)
B
04/08/2024
Signed off — Alteration
Remove/install non-load bearing partitions, ceiling, flooring and finishes. Associated mechanical work. No change to use, egress, or occupancy.
M00476279-I1
04/04/2024
Filed — Alteration
Remove/install non-load bearing partitions, ceiling, flooring and finishes. Associated mechanical work. No change to use, egress, or occupancy.
M00476279-P1
03/21/2022
Signed off — Alteration
Temporary construction fence
M00475637-I1
03/04/2022
Signed off — Alteration
FILING FOR PLUMBING WORK ASSOCIATED WITH THE BUILD OUT OF THE COMMERCIAL TENANT SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00476263-I1
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP11/12/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLIMIT CONTRACTING LLC09/27/2024
DOB NOWGeneral ConstructionSigned-offCASELLA CONSTRUCTION CORP.09/12/2024
DOB NOWConstruction FenceSigned-offPIECE MANAGEMENT INC06/24/2021
DOB NOWGeneral ConstructionSigned-offPIECE MANAGEMENT INC06/24/2021
DOB NOWMechanical SystemsSigned-offPIECE MANAGEMENT INC05/10/2021
DOB NOWPlumbingSigned-offHYDRO MECHANICAL INC05/10/2021
DOB NOWConstruction FenceSigned-offPIECE MANAGEMENT INC05/05/2021
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/28/2020
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC08/04/2020
BISOTISSUEDPOFI CONSTRUCTION CORP10/14/2020
BISOTISSUEDPOFI CONSTRUCTION CORP08/14/2020
BISPLISSUEDFRED SMITH P&H CO INC10/11/2013
BISPLISSUEDFRED SMITH P&H CO INC09/05/2012
BISMHISSUEDSAMUEL BEST CONSTR INC01/19/2011
BISFSISSUEDACE ATLAS CORP09/29/2010
BISPLISSUEDPETER PLUMBING ASSOC. INC.05/25/2010
BISOTISSUEDSAMUEL BEST CONSTR INC02/24/2010
BISEQISSUEDSAMUEL BEST CONSTR INC02/24/2010
BISEQISSUEDSTEEL SCAFFOLDING07/19/2002
BISOTISSUEDQUALITY BUILDING CONTRACTOR INC07/17/2002
BISOTISSUEDBERGER SIGN FABRICATION INC01/19/2001
BISPLISSUEDHENRY MYERS PLMB. & HTG.03/28/1995
BISMHISSUEDWALLS TREAT CONST.02/03/1995
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.03/10/1994
5 projects · most recent 12/12/2024
General Wiring
FiledStatusContractorScope
12/12/2024CompleteQUEENSBORO ELEC'L CONTR'GGeneral Wiring
10/07/2024CompleteQUEENSBORO ELEC'L CONTR'G—
03/20/2024CompleteJANON ELECTRIC CORPGeneral Wiring
05/12/2021CompleteMODERN VOLTAGE NYC INCGeneral Wiring
07/29/2020CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/20/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/09/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
05/19/2025Tenant Protection Plan Compliance—special
08/07/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
08/01/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/01/2024Fenestration air leakageYounes Abouyaalaenergy_progress
08/01/2024Fenestration areasYounes Abouyaalaenergy_progress
08/01/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
08/01/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/01/2024MeteringYounes Abouyaalaenergy_progress
08/01/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
08/01/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/01/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
08/01/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
08/01/2024FinalNAVEEN KUMARprogress
03/04/2022Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
03/04/2022HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
03/04/2022Fenestration air leakageGiuseppe Anzaloneenergy_progress
03/04/2022Interior lighting powerGiuseppe Anzaloneenergy_progress
03/04/2022Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
03/04/2022Mechanical SystemsGiuseppe Anzalonespecial
03/04/2022Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
03/04/2022FinalGiuseppe Anzaloneprogress
03/04/2022HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
03/04/2022Maintenance informationGiuseppe Anzaloneenergy_progress
03/04/2022Fenestration and door U-factor and product ratingsGiuseppe Anzaloneenergy_progress
Latest 25 of 32.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch4
08/26/2026M01089912-I1Request digital key ↗
08/26/2026M01089943-P2Request digital key ↗
08/26/2026M01089943-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00476279-P1Request digital key ↗
09/04/2026M00476279-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00476279-P1Request digital key ↗
09/04/2026M00476279-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00475637-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00380159-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00476263-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION19
07/21/2020140927102Open ↗
05/04/2020100770961Open ↗
05/04/2020103207557Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION9
08/14/2020140927102Open ↗
08/13/2020140927102Open ↗
11/02/2013121164060Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/13/2020140927102Open ↗
08/10/2020140927102Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/10/2020140927102Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
12/03/2013121164060Open ↗
07/30/2012121164060Open ↗
01/28/2011120520267Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00380159-I1Open ↗
09/04/2026M00476279-I1Open ↗
09/04/2026M00476279-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026M01089912-I1Open ↗
08/27/2026M01089912-I1Open ↗
08/27/2026M01089912-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
07/30/2012121164060Open ↗
11/26/2010120531745Open ↗
10/07/2010120486599Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/30/2012121164060Open ↗
11/22/2010120531745Open ↗
10/14/2010120486599Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026M01089912-I1Open ↗
08/25/2026M00476279-P1Open ↗
08/24/2026M01089943-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/21/2020140927102Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING6
07/30/2012121164060Open ↗
08/11/2010120271516Open ↗
08/05/2010120271516Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
11/10/2010120520267Open ↗
11/10/2010120520267Open ↗
01/05/2011120520267Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
10/25/2013121164060Open ↗
08/24/2010120271516Open ↗
07/30/2010120271516Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/22/2010120531745Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES1
07/21/2020140927102Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/13/2020140927102Open ↗
▸BISSTREET TREE CHECKLIST1
11/10/2010120520267Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00380159-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00476279-I1Open ↗
09/04/2026M00476279-P1Open ↗
08/26/2026M01089943-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)5
07/30/2012121164060Open ↗
10/07/2010120486599Open ↗
10/07/2010120486599Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/22/2010120531745Open ↗
02/22/2010120271516Open ↗
11/10/2010120520267Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/03/2013121164060Open ↗
07/30/2012121164060Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/03/2013121164060Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/10/2021140927102Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/21/2020140927102Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00476279-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/10/2021140927102Open ↗
02/10/2021140927102Open ↗
07/21/2020140927102Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/10/2021140927102Open ↗
12/03/2013121164060Open ↗
02/22/2013120531745Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/30/2012121164060Open ↗
11/22/2010120531745Open ↗
11/10/2010120520267Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/22/2013120531745Open ↗
02/09/2011120520267Open ↗
09/29/2010120271516Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
07/21/2020140927102Open ↗
12/03/2013121164060Open ↗
07/30/2012121164060Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/10/2021140927102Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION8
01/15/2013121164060Open ↗
01/10/2013121164060Open ↗
10/16/2012121164060Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
05/04/2020100770961Open ↗
05/04/2020103207557Open ↗
04/27/2020103202428Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
07/30/2012121164060Open ↗
11/22/2010120531745Open ↗
11/10/2010120520267Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/21/2020140927102Open ↗
10/07/2010120486599Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/04/2020103207557Open ↗
01/10/2011120486599Open ↗
▸DOB NOWCalculations1
08/13/2026M01114902-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01114902-I1Open ↗