← Back
Walk-up cooperative
107 WEST 106 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055965
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R8AZoning
9,155 sfGross Floor Area
16Units
Rent Stabilized10 Open Violations ▸
Walk-up cooperative · Owner of record: 107 WEST 106TH STREET APT CORP · 2,523 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 54p · 1 filing · 4 docs
Floor 44p · 1 filing · 4 docs
Floor 36p · 1 filing · 7 docs
Floor 2
Floor 1
Cellar11p · 1 filing · 20 docs
Sub-Basement5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YASH B CONSTRUCTION403/21/2026
107 W 106 APT303/21/2026
107 WEST 106TH STREET APT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE CONSULTING ENGINEERS401/13/2025
LAB ARCHITECTURE, PLLC205/11/2023
S & S ARCHITECTURAL DESIGN,LLC109/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TAG TEAM GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IVENKO INCGeneral Contractor903/21/2026
PREMIER FLOW PLBG AND HTGPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
APPO ELECTRICAL CONTRS INElectrical103/22/2026
ALTAIR PLUMBING AND HEATPlumbing107/08/2026
TORRES IVANElectrical103/21/2026
HENRY KHODOSHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519401/13/2025
LAB ARCHITECTURE, PLLC3653205/11/2023
Building Lifecycle
All (60)Filed (7)Permit Issued (6)Signed Off (4)Violation (21)Inspection (3)Special Inspection (19)
04/06/2026
Violation issued (HPD, open)
B
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
B
03/01/2026
Violation issued (HPD, open)
C
03/01/2026
Violation issued (HPD, open)
A
03/01/2026
Violation issued (HPD, open)
B
03/01/2026
Violation issued (HPD, open)
B
03/01/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, closed)
A
01/21/2025
Signed off — Alteration
Structural work for connecting new steel columns, beams with existing framing members at basement ceiling.
M01128014-I1
01/21/2025
Signed off — Alteration
Structural work for connecting new steel columns, beams with existing framing members at basement ceiling.
M01128014-S1
01/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/14/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/14/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/14/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
01/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/14/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/13/2025
Filed — Alteration
Structural work for connecting new steel columns, beams with existing framing members at basement ceiling.
M01128014-P2
01/13/2025
Filed — Alteration
Structural work for connecting new steel columns, beams with existing framing members at basement ceiling.
M01128014-P1
01/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/10/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/10/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/10/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/10/2025
Special inspection requirement — Final
NAVEEN KUMAR
12/16/2024
Permit issued — Structural
M01128014-S1-ST
12/16/2024
Permit issued — Foundation
M01128014-I1-FO
11/22/2024
Violation issued (HPD, closed)
I
11/18/2024
Filed — Alteration
Structural work for connecting new steel columns, beams with existing framing members at basement ceiling.
M01128014-I1
11/18/2024
Filed — Alteration
Structural work for connecting new steel columns, beams with existing framing members at basement ceiling.
M01128014-S1
02/22/2024
Signed off — Alteration
Plumbing work associated with renovation of Apt 2AB on the 3rd floor. No change in Use, Bulk, Egress, or Occupancy
M00521765-I1
02/22/2024
Signed off — Alteration
Plumbing work associated with renovation of Apt 2AB on the 3rd floor. No change in Use, Bulk, Egress, or Occupancy
M00521765-S1
11/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2023
Permit issued — Plumbing
M00521765-S1-PL
05/23/2023
Permit issued — General Construction
M00521765-I1-GC
05/11/2023
Filed — Alteration
Plumbing work associated with renovation of Apt 2AB on the 3rd floor. No change in Use, Bulk, Egress, or Occupancy
M00521765-S1
05/09/2023
Filed — Alteration
Plumbing work associated with renovation of Apt 2AB on the 3rd floor. No change in Use, Bulk, Egress, or Occupancy
M00521765-I1
05/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leslie Barnett
12/12/2019
Permit issued — Plumbing
M00227346-I1-PL
11/20/2019
Permit issued — Plumbing
M00227346-I1-PL
11/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2019
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK AS PER PLANS. FILED TO ADDRESS VIOLATION 39008354R
M00227346-I1
08/23/2019
Violation issued (ECB, closed)
Construction
08/23/2019
Violation issued (ECB, closed)
Construction
08/23/2019
Violation issued (ECB, closed)
Construction
08/23/2019
Violation issued (ECB, closed)
Construction
10/02/2015
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
07/24/1999
Violation issued (HPD, open)
C
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offIVENKO INC12/16/2024
DOB NOWFoundationSigned-offIVENKO INC12/16/2024
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT05/30/2023
DOB NOWGeneral ConstructionSigned-offIVENKO INC05/23/2023
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP12/12/2019
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP11/20/2019
BISOTISSUEDMANHATTAN RENOVATIONS INC.10/07/2019
BISPLISSUEDNM MECHANICAL CORP12/18/2018
BISEQISSUEDYASH & B CONSTRUCTION COR08/10/2016
BISOTISSUEDYASH & B CONSTRUCTION COR08/04/2016
BISBLISSUEDNEW YORK HEATING CORP04/07/2008
BISPLISSUEDNEW YORK HEATING CORP04/07/2008
BISPLISSUEDC &Z MECHANICAL P & H INC11/17/1994
BISBLISSUEDC/Z MECHANICAL PLUMBING HEATING11/17/1994
5 projects · most recent 05/31/2023
General Wiring Lighting
FiledStatusContractorScope
05/31/2023CompleteFALCO ELEC'L SERVICES INCGeneral Wiring
04/16/2023Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
07/18/2021Permit IssuedAPPO ELECTRICAL CONTRS INGeneral Wiring
10/19/2020CompleteJOSEPH WEINSTEIN ELECTRIC—
09/25/2019CompleteAPPO ELECTRICAL CONTRS INLighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/14/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/14/2025Structural Steel - DetailsYounes Abouyaalaspecial
01/14/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/14/2025FinalNAVEEN KUMARprogress
01/14/2025Footing and FoundationYounes Abouyaalaprogress
01/14/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/14/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/14/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/14/2025FinalNAVEEN KUMARprogress
01/10/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/10/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/10/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/10/2025FinalNAVEEN KUMARprogress
01/10/2025Footing and FoundationYounes Abouyaalaprogress
01/10/2025Tenant Protection Plan Compliance—special
01/10/2025Structural Steel - DetailsYounes Abouyaalaspecial
01/10/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/10/2025FinalNAVEEN KUMARprogress
05/09/2023Fire-Resistant Penetrations and JointsLeslie Barnettspecial
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/31/2026M00521765-S1Request digital key ↗
08/31/2026M00521765-I1Request digital key ↗
08/25/2026M01128014-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00227346-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
10/08/2019123818002Open ↗
12/19/2018123418701Open ↗
12/04/2018123418701Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
11/19/2019123818002Open ↗
09/10/2019123818002Open ↗
11/16/2018123418701Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026M00521765-S1Open ↗
08/31/2026M00521765-I1Open ↗
08/25/2026M01128014-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/26/2026M00521765-S1Open ↗
08/28/2026M01128014-P2Open ↗
08/28/2026M01128014-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M01128014-P2Open ↗
08/28/2026M01128014-P1Open ↗
08/28/2026M01128014-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/10/2019123818002Open ↗
01/02/2019123418701Open ↗
11/16/2018123418701Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/09/2016140533322Open ↗
07/26/2016140526768Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/09/2016140533322Open ↗
07/26/2016140526768Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/09/2016140533322Open ↗
07/26/2016140526768Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/28/2008110120636Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/28/2008110120636Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/08/2008110120636Open ↗
03/28/2008110120636Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/04/2018123418701Open ↗
▸BISSCHEDULE B - PLUMBING1
03/28/2008110120636Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
12/17/2008110120636Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
09/10/2019123818002Open ↗
11/16/2018123418701Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00227346-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026M00521765-S1Open ↗
08/31/2026M00521765-I1Open ↗
08/25/2026M01128014-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/10/2019123818002Open ↗
11/16/2018123418701Open ↗
07/26/2016140526768Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/28/2008110120636Open ↗
03/28/2008110120636Open ↗
03/28/2008110120636Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/10/2019123818002Open ↗
01/02/2019123418701Open ↗
11/16/2018123418701Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/26/2016140526768Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/02/2019123418701Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/19/2023123818002Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/09/2016140533322Open ↗
07/26/2016140526768Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
03/28/2008110120636Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/19/2023123818002Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/02/2019123418701Open ↗
12/01/2016140533322Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/10/2019123818002Open ↗
▸BISFINAL1
05/19/2023123818002Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/18/2008110120636Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
09/10/2019123818002Open ↗
01/02/2019123418701Open ↗
11/16/2018123418701Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/19/2023123818002Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
12/04/2018123418701Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
11/19/2019123818002Open ↗
01/02/2019123418701Open ↗
12/19/2018123418701Open ↗
▸BISEFILING COVER SHEET2
09/10/2019123818002Open ↗
11/16/2018123418701Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/09/2016140533322Open ↗
07/26/2016140526768Open ↗