← Back
Four families
107 WEST 117 STREET
MANHATTAN · Harlem (South) · BIN 1057459
💬 Discuss this project
1920Year Built
4Stories
C3Building Class
R7-2Zoning
6,156 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸
Four families · Owner of record: 107 W 117 ST NY LLC · 2,018 sf lot · 3.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 1 filing · 20 docs
Floor 4Under Construction41p · 2 filings · 20 docs
Floor 3Under Construction33p · 2 filings · 20 docs
Floor 2Under Construction34p · 2 filings · 20 docs
Floor 1Under Construction34p · 2 filings · 20 docs
CellarUnder Construction34p · 2 filings · 20 docs
Sub-CellarUnder Construction43p · 2 filings · 20 docs
Site & exterior5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SURFACE DEVELOPMENT2007/08/2026
HPD203/21/2026
107 W 117 ST NY LLC103/22/2026
107 W 117TH LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2021$3.2M—— → —$520/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC305/25/2023
ANDREW FREDMAN ARCHITECT LLC405/17/2023
STRATFORD ENGINEERING109/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICON BUILD LLCGeneral Contractor1607/08/2026
KAPLOWITZ BARRYElectrical203/21/2026
BARRY KAPLOWITZElectrical203/21/2026
GODFREY'S REFRIGERATIONGeneral Contractor207/08/2026
ALMA PLBG SPRINKLER INCPlumbing207/08/2026
WILFRED JEFFREYElectrical103/21/2026
ADVANCED PLBG, MECH & SPRFire Protection107/08/2026
PEREIRA, EURIPEDESElectrical103/21/2026
THORNE, LAWRENCEElectrical103/21/2026
T.M.T ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267305/25/2023
INTEGRITY CONSULTING SERV666205/17/2023
STRATFORD ENGINEERING997109/29/2021
Building Lifecycle
All (86)Filed (8)Permit Issued (11)Signed Off (3)Violation (15)Inspection (7)Objection (15)Special Inspection (27)
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
08/07/2023
Objection resolved — Resolved
07/31/2023
Signed off — Alteration
PLUMBING AND SPRINKLER WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00579050-I1
07/06/2023
Signed off — Alteration
MECHANICAL WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00526051-S3
06/28/2023
Permit issued — General Construction
M00526051-S3-GC-CX
06/12/2023
Objection raised — Admin
06/12/2023
Objection raised — Other
06/02/2023
Permit issued — General Construction
M00526051-I1-GC
05/25/2023
Filed — Alteration
PLUMBING AND SPRINKLER WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00579050-P1
05/17/2023
Signed off — Alteration
M00525241-I1
05/17/2023
Filed — Alteration
MECHANICAL WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00526051-P1
05/10/2023
Permit issued — Plumbing
M00579050-I1-PL
04/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/16/2023
Violation issued (HPD, closed)
A
01/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/20/2023
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
01/06/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/02/2022
Violation issued (HPD, closed)
I
08/04/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/08/2022
Permit issued — General Construction
M00526051-I1-GC
06/08/2022
Permit issued — Construction Fence
M00525241-I1-FN
05/18/2022
Permit issued — Mechanical Systems
M00526051-S1-MS
03/18/2022
Permit issued — Mechanical Systems
M00526051-S1-MS
03/01/2022
Permit issued — Plumbing
M00579050-I1-PL
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
02/03/2022
Permit issued — Plumbing
M00579050-I1-EW-SP
09/29/2021
Filed — Alteration
MECHANICAL WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00526051-S3
09/28/2021
Special inspection requirement — Masonry
Xianzhang Chen
09/28/2021
Special inspection requirement — Structural Cold-Formed Steel
Xianzhang Chen
09/28/2021
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
09/28/2021
Special inspection requirement — Concrete - Cast-In-Place
Xianzhang Chen
09/28/2021
Special inspection requirement — Post-installed Anchors
Xianzhang Chen
09/28/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
09/28/2021
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
09/28/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
09/28/2021
Special inspection requirement — Final
Xianzhang Chen
09/28/2021
Special inspection requirement — Footing and Foundation
Xianzhang Chen
08/31/2021
Filed — Alteration
PLUMBING AND SPRINKLER WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00579050-I1
08/23/2021
Filed — Alteration
MECHANICAL WORK FOR RENOVATIONS OF EXISTING 4 DWELLING PREMISES AS PER PLANS FILED HEREWITH.
M00526051-S1
08/18/2021
Special inspection requirement — Shutoff dampers
ALEKSANDR LEVIN
08/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
08/18/2021
Special inspection requirement — Duct leakage testing, insulation and design
ALEKSANDR LEVIN
08/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
ALEKSANDR LEVIN
08/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
08/18/2021
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
07/22/2021
Permit issued — General Construction
M00526051-I1-GC
07/07/2021
Permit issued — Construction Fence
M00525241-I1-FN
06/21/2021
Objection raised — Other
06/21/2021
Objection resolved — Addressed
06/21/2021
Objection raised — Other
06/21/2021
Objection resolved — Addressed
06/21/2021
Objection raised — Other
06/21/2021
Objection resolved — Addressed
06/10/2021
Objection raised — Other
06/10/2021
Objection resolved — Addressed
06/10/2021
Objection raised — Other
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNICON BUILD LLC06/28/2023
DOB NOWGeneral ConstructionPermit IssuedNICON BUILD LLC06/02/2023
DOB NOWPlumbingSigned-offSMART PLUMBING & HTG CORP05/10/2023
DOB NOWGeneral ConstructionPermit IssuedNICON BUILD LLC06/08/2022
DOB NOWConstruction FenceSigned-offNICON BUILD LLC06/08/2022
DOB NOWMechanical SystemsPermit IssuedGODFREYS REFRIGERATION05/18/2022
DOB NOWMechanical SystemsPermit IssuedGODFREYS REFRIGERATION03/18/2022
DOB NOWPlumbingSigned-offSMART PLUMBING & HTG CORP03/01/2022
DOB NOWPlumbingSigned-offADVANCED PLBG, MECH & SPR02/03/2022
DOB NOWGeneral ConstructionPermit IssuedNICON BUILD LLC07/22/2021
DOB NOWConstruction FenceSigned-offNICON BUILD LLC07/07/2021
BISPLISSUEDEMPIRE USED BOILER SUPPLY CO.,05/02/2002
BISBLISSUEDEMPIRE USED BOILER SUPPLY CO.,05/02/2002
3 projects · most recent 06/06/2023
General Wiring
FiledStatusContractorScope
06/06/2023CompleteT.M.T ELECTRIC INCGeneral Wiring
06/06/2023CompleteT.M.T ELECTRIC INC5 meters, 5 new_meters
10/28/2021Permit IssuedT.M.T ELECTRIC INC—
1 project · most recent 05/17/2023
Steel Concrete Masonry Wood
FiledStatusContractorScope
05/17/2023Signed-offNICON BUILD LLCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/20/2023Pass-Final SP - More than 10 Requested FloorsPassView ↗
01/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
09/28/2021MasonryXianzhang Chenspecial
09/28/2021Structural Cold-Formed SteelXianzhang Chenspecial
09/28/2021Structural Steel - DetailsXianzhang Chenspecial
09/28/2021Concrete - Cast-In-PlaceXianzhang Chenspecial
09/28/2021Post-installed AnchorsXianzhang Chenspecial
09/28/2021Structural Steel - High Strength BoltingXianzhang Chenspecial
09/28/2021Structural Steel - WeldingXianzhang Chenspecial
09/28/2021Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
09/28/2021FinalXianzhang Chenprogress
09/28/2021Footing and FoundationXianzhang Chenprogress
08/18/2021Shutoff dampersALEKSANDR LEVINenergy_progress
08/18/2021HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
08/18/2021Duct leakage testing, insulation and designALEKSANDR LEVINenergy_progress
08/18/2021HVAC-R and service water heating equipmentALEKSANDR LEVINenergy_progress
08/18/2021HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
08/18/2021Maintenance informationALEKSANDR LEVINenergy_progress
05/28/2021Insulation placement and R valuesALEKSANDR LEVINenergy_progress
05/28/2021Lighting in dwelling unitsALEKSANDR LEVINenergy_progress
05/28/2021Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
05/28/2021Mechanical SystemsDmitry Levinspecial
05/28/2021FinalDmitry Levinprogress
05/26/2021Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
05/26/2021Sprayed fire-resistant materialsALEKSANDR LEVINspecial
05/20/2021FinalALEKSANDR LEVINprogress
05/20/2021Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
Latest 25 of 27.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00525241-I1Request digital key ↗
09/03/2026M00525241-P1Request digital key ↗
09/03/2026M00526051-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00525241-I1Open ↗
08/31/2026M00579050-I1Open ↗
08/31/2026M00579050-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026M00526051-S1Open ↗
08/29/2026M00526051-I1Open ↗
08/29/2026M00526051-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026M00526051-S1Open ↗
08/31/2026M00526051-S1Open ↗
08/29/2026M00526051-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026M00579050-I1Open ↗
08/13/2026M00526051-S3Open ↗
08/13/2026M00526051-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00526051-S3Open ↗