← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
West 82nd Condominium
107 WEST 82 STREET · BIN 1081465
💬 Discuss this project
1894Year Built
5Stories
RMBuilding Class
R8BZoning
55,037 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized19 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 12,771 sf lot · 4.31 FAR built · Flood zone X
Locations of Work
Structural
Floor 11p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARIN MANAGEMENT703/22/2026
MARIN MANAGEMENT CORP OWN203/22/2026
OWNER OF 107 WEST 82 STRE203/22/2026
MARIN MAN CORP203/21/2026
WEST 82ND OWNERS603/21/2026
WEST 82ND ST OWNERS2003/21/2026
107-111 WEST 82ND ASSOCIATES303/21/2026
WEST 82ND CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARINASASSUARCHITECTS206/10/2026
A&B WORLD CONSULTING107/16/2021
GILSANZ MURRAY STEFICEK LLP1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
YBL NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVELLINO, LOUISElectrical403/21/2026
DICKSON, CHARDElectrical403/21/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
JOHNSON WARRENElectrical103/21/2026
PHILIP ZUARDIElectrical103/21/2026
TREVOR DUNWELLElectrical103/21/2026
Building Lifecycle
All (71)Filed (3)Permit Issued (1)Signed Off (1)Violation (52)Inspection (1)Objection (4)Special Inspection (9)
06/10/2026
Filed — Alteration
M01119330-I1
04/29/2026
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/30/2024
Special inspection requirement — Final
Marina Sassu
09/22/2024
Violation issued (HPD, open)
B
06/03/2024
Violation issued (HPD, open)
B
05/27/2024
Violation issued (HPD, closed)
C
05/02/2024
Filed — Alteration
Herewith filing application as per plans submitted. No change in use, egress or occupancy.
M00977235-I1
05/01/2024
Special inspection requirement — Structural Steel - Welding
05/01/2024
Special inspection requirement — Structural Steel - High Strength Bolting
02/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/21/2024
Special inspection requirement — Final
02/21/2024
Special inspection requirement — Structural Steel - Details
12/14/2023
Special inspection requirement — Final
Marina Sassu
09/17/2021
Signed off — Alteration
JOB FILED EXIST. DOC OFFICE PLUMBING WORK, INCLUDE LEGALIZED PLUMBING FIXTURES AS PER PLAN TO RESOLVE ECB VIOLATION #35510864P. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00550047-I1
09/13/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/07/2021
Permit issued — Plumbing
M00550047-I1-PL
07/29/2021
Objection raised — Structural
07/29/2021
Objection resolved — Addressed
07/29/2021
Objection raised — Accessibility
07/29/2021
Objection resolved — Addressed
07/16/2021
Filed — Alteration
JOB FILED EXIST. DOC OFFICE PLUMBING WORK, INCLUDE LEGALIZED PLUMBING FIXTURES AS PER PLAN TO RESOLVE ECB VIOLATION #35510864P. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00550047-I1
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2021
Violation issued (ECB, closed)
Zoning
06/15/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Violation issued (ECB, closed)
Construction
11/18/2020
Violation issued (ECB, closed)
Zoning
11/18/2020
Violation issued (ECB, closed)
Construction
08/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/29/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/16/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/31/2015
Violation issued (HPD, closed)
A
08/31/2015
Violation issued (HPD, open)
B
08/31/2015
Violation issued (HPD, open)
C
08/31/2015
Violation issued (HPD, open)
B
08/31/2015
Violation issued (HPD, open)
B
08/31/2015
Violation issued (HPD, open)
C
08/31/2015
Violation issued (HPD, open)
B
06/16/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/01/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/27/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/26/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/23/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2008
Violation issued (HPD, closed)
B
03/21/2008
Violation issued (HPD, closed)
B
03/21/2008
Violation issued (HPD, closed)
B
12/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/12/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/07/2021
BISPLISSUEDAUTHENTIC PLBG CORP03/22/2022
BISPLISSUEDL&J PLG & HTG CO OF NY IN11/23/2018
BISPLISSUEDBRANCH PLUMBING LLC09/04/2018
BISPLISSUEDTHE PLBG & HTG SPECIALIST05/24/2018
BISOTISSUEDGNS HOME IMPROVMENT LLC05/17/2018
BISPLISSUEDBEST PLUMBING & HVAC INC02/11/2015
BISPLISSUEDALLEGIANCE PLBG & HTG COR05/23/2012
BISOTISSUEDKITCHENS ETC INC05/22/2012
BISOTISSUEDSIENA CONSTRUCTION LTD02/18/2010
BISPLISSUEDBEST PLUMBING & HVAC INC09/17/2009
BISOTISSUEDSIENA CONSTRUCTION LTD04/16/2009
BISPLISSUEDCITY GAS HTG SVC CO INC05/07/2008
BISOTISSUEDJORDAN DRY WALL INC04/25/2008
BISOTISSUEDSIENA CONSTRUCTION LTD02/06/2008
BISPLISSUEDFIVE STAR P AND H CO, INC11/27/2006
BISPLISSUEDSANITARY PLUMBING & HEATING10/04/2006
BISOTISSUEDARCHETYPAL IMAGINARY REMODELING09/29/2006
BISOTISSUEDDUTCHMAN CONTRACTING INC09/25/2006
BISOTISSUEDDUTCHMAN CONTRACTING INC09/25/2006
BISPLISSUEDMETROPOLITAN HEAT & POWER CO08/04/2006
BISOTISSUEDMETROPOLITAN HEAT & POWER CO08/04/2006
BISOTISSUEDVINCENT D CALENDA12/29/2005
BISPLISSUEDALL DAY PLUMBING & HEATING06/19/2003
BISOTISSUEDMARBAY CONSTR. CORP.08/23/2001
BIS—ISSUEDMARBAY CONSTRUCTION CORP05/04/2001
BISPLISSUEDSANITARY PLBG & HTG CORP01/25/2001
BISOTISSUEDMARBAY CONSTR CORP12/06/2000
BISPLISSUEDSANITARY PLUMBING & HEATING CORP02/02/2000
BISOTISSUEDMARBAY CONST. CORP12/29/1999
BISOTISSUEDMARBAY CONST CORP12/28/1999
BISPLISSUEDSANITARY PLUMBING & HEATING CORP10/06/1998
BISOTISSUEDMARBAY CONST CORP09/18/1998
BISOTISSUEDMGA REALTY DEVELOMENT CORP.01/11/1991
4 projects · most recent 07/19/2024
General Wiring
FiledStatusContractorScope
07/19/2024CompleteAPPROVED ELECTRIC CORP.General Wiring
04/14/2021Permit IssuedR.C.M. ELECTRIC CORP.—
08/01/2019Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
07/19/2018CompleteUS1 ELECTRIC CORPGeneral Wiring
1 project
Steel Wood
FiledStatusContractorScope
———Steel, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/13/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/11/2025Fire-Resistant Penetrations and Joints—special
09/11/2025Structural Stability – Alterations of existing buildings—special
09/30/2024FinalMarina Sassuprogress
05/01/2024Structural Steel - Welding—special
05/01/2024Structural Steel - High Strength Bolting—special
02/21/2024Structural Stability – Alterations of existing buildings—special
02/21/2024Final—progress
02/21/2024Structural Steel - Details—special
12/14/2023FinalMarina Sassuprogress
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/06/2026M01008704-I1Request digital key ↗
08/27/2026M00977235-I1Request digital key ↗
08/15/2026M00550047-I1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION24
04/21/2022110406427Open ↗
04/20/2022110406427Open ↗
03/03/2022102980669Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION16
03/22/2022110406427Open ↗
07/15/2019123690032Open ↗
11/29/2018140755920Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00550047-I1Open ↗
08/13/2026M01008704-I1Open ↗
08/13/2026M00977235-I1Open ↗
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/04/2019123690032Open ↗
07/05/2019123690032Open ↗
12/10/2018140755920Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/15/2019123690032Open ↗
03/08/2010110406427Open ↗
12/09/2008110406427Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026M00977235-I1Open ↗
08/13/2026M01008704-I1Open ↗
08/13/2026M00550047-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/05/2019123690032Open ↗
04/15/2018140755920Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026M01119330-I1Open ↗
08/25/2026M00977235-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/15/2018140755920Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/09/2008110406427Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING9
04/21/2022110406427Open ↗
04/20/2022110406427Open ↗
02/23/2022110406427Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
10/02/2015110406427Open ↗
07/02/2012121042255Open ↗
10/15/2009110406427Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/18/2018140755920Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
08/06/2012120994816Open ↗
06/05/2012120994816Open ↗
▸BISTenant Protection Plan and Notes2
07/05/2019123690032Open ↗
04/15/2018140755920Open ↗
▸Environmental & Asbestos11
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
11/30/2009110406427Open ↗
09/30/2009120158925Open ↗
12/09/2008110406427Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/05/2019123690032Open ↗
04/15/2018140755920Open ↗
05/19/2012121042255Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M00977235-I1Open ↗
08/13/2026M01008704-I1Open ↗
08/13/2026M00550047-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/04/2019123690032Open ↗
07/05/2019123690032Open ↗
06/05/2012120994816Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/01/2021123690032Open ↗
12/10/2018140755920Open ↗
▸BISNYCECC ANALYSIS1
04/15/2018140755920Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/15/2018140755920Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/01/2021123690032Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/19/2022102980669Open ↗
03/02/2022102336189Open ↗
02/18/2022110406427Open ↗
Showing 3 of 7 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
04/19/2022102980669Open ↗
03/02/2022102336189Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
03/02/2022102336189Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/01/2022110406427Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
07/20/2022110406427Open ↗
04/20/2022102980669Open ↗
03/02/2022102336189Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS APPROVAL5
07/15/2019123690032Open ↗
12/10/2018140755920Open ↗
04/28/2016110406427Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/19/2012121042255Open ↗
09/30/2009120158925Open ↗
12/09/2008110406427Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
04/26/2022110406427Open ↗
04/20/2022102980669Open ↗
04/01/2021123690032Open ↗
▸BISSUPERSEDING LETTER3
03/22/2022110406427Open ↗
11/29/2018140755920Open ↗
10/25/2018140755920Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE2
04/06/2012120994816Open ↗
04/06/2012120994816Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
03/06/2013120994816Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT15
07/20/2022110406427Open ↗
04/01/2021123690032Open ↗
11/16/2020102069084Open ↗
Showing 3 of 15 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
04/19/2022110406427Open ↗
05/23/2012121042255Open ↗
04/09/2010110406427Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/20/2022110406427Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
08/06/2012120994816Open ↗
▸Filing & Intake Forms18
▸BISBOROUGH INTAKE FORM7
03/22/2022110406427Open ↗
12/11/2020121326225Open ↗
12/03/2020121326225Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
04/21/2022110406427Open ↗
03/01/2022110406427Open ↗
09/05/2019123690032Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
07/05/2019123690032Open ↗
05/19/2012121042255Open ↗
04/06/2012120994816Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/15/2018140755920Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
04/06/2012120994816Open ↗
04/10/2012120994816Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00977235-I1Open ↗