Office with commercial, 1-6 stories
1070 2 AVENUE
MANHATTAN · BIN 1039993
💬 Discuss this project
1910Year Built
4Stories
O5Building Class
C1-9Zoning
4,581 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: 1070 SECOND AVENUE . · 1,458 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 4Under Construction45p · 2 filings · 20 docs
Floor 3Under Construction38p · 2 filings · 20 docs
Floor 2Under Construction36p · 2 filings · 20 docs
Floor 1Under Construction32p · 1 filing · 20 docs
CellarUnder Construction34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUDIN2107/08/2026
PLATINUM SERVICES NY904/09/2026
RUDIN ESTATES303/22/2026
RUDIN MANAGEMENT CO IN103/22/2026
RUNDIN MANAGEMENT703/21/2026
RUDIN MANAGEMENT AS AGENT FOR103/21/2026
1070 SECOND AVENUE BAGELCORP103/21/2026
RUDIN MNGT CO AGT RUDINESTCO403/21/2026
2ND AVENUE KITCHEN203/21/2026
RUBIN MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WSP405/13/2025
ANTONIO LEO ARCHITECT603/18/2025
ASHRAF CORP210/30/2024
THORNTON TOMASETTI210/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors1203/21/2026
KD DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KELRON CONTRACTING INCGeneral Contractor804/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor404/09/2026
HT PLUMBING & HEATING CORPlumbing207/08/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
ROYAL CONCRETE AND MASON*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441105/13/2025
Building Lifecycle
All (100)Filed (14)Permit Issued (12)Signed Off (6)Violation (30)Inspection (13)Objection (2)Special Inspection (23)
04/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/24/2025
Violation issued (HPD, closed)
I
05/29/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01054645-I1
05/27/2025
Permit issued — Supported Scaffold
M01054645-I1-SF
05/27/2025
Permit issued — Sidewalk Shed
M01054645-I1-SH
05/23/2025
Signed off — Alteration
General construction as shown on the plans.
M00984059-I1
05/22/2025
Signed off — Alteration CO
Plumbing work as shown on the plans.
M00987034-S1
05/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
05/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
05/19/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
05/19/2025
Special inspection requirement — Final
EUGENE BIFULCO
05/19/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
05/19/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
05/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
05/13/2025
Filed — Alteration CO
Plumbing work as shown on the plans.
M00987034-P2
04/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2025
Signed off — Alteration CO
Plumbing work as shown on the plans.
M00987034-S3
04/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/09/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/08/2025
Signed off — Alteration
General construction as shown on the plans.
M00984059-S1
04/08/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/25/2025
Signed off — Alteration CO
Plumbing work as shown on the plans.
M00987034-S4
03/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2025
Special inspection requirement — Final
EUGENE BIFULCO
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/18/2025
Filed — Alteration
General construction as shown on the plans.
M00984059-P2
03/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/15/2025
Filed — Alteration CO
Plumbing work as shown on the plans.
M00987034-P1
01/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2025
Permit issued — Mechanical Systems
M00987034-S1-MS
01/09/2025
Permit issued — Sprinklers
M00987034-S3-EW-SP
11/14/2024
Permit issued — Plumbing
M00987034-S2-PL
10/30/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01054645-P1
10/10/2024
Permit issued — Structural
M00987034-S4-ST
10/07/2024
Permit issued — General Construction
M01114107-I1-GC
10/02/2024
Filed — Alteration
M01114107-I1
09/10/2024
Filed — Alteration CO
Plumbing work as shown on the plans.
M00987034-S4
09/04/2024
Filed — Alteration CO
Plumbing work as shown on the plans.
M00987034-S1
09/04/2024
Filed — Alteration CO
Plumbing work as shown on the plans.
M00987034-S3
09/04/2024
Filed — Alteration CO
Plumbing work as shown on the plans.
M00987034-S2
08/22/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/22/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/07/2024
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
08/07/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/07/2024
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
08/07/2024
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
08/06/2024
Special inspection requirement — Final
EUGENE BIFULCO
08/06/2024
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2024
Permit issued — General Construction
M00987034-I1-GC
06/25/2024
Filed — Alteration
General construction as shown on the plans.
M00984059-P1
06/24/2024
Special inspection requirement — Final
EUGENE BIFULCO
06/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/27/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/27/2025
DOB NOWMechanical SystemsSigned-offKELRON CONTRACTING INC01/13/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR01/09/2025
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR11/14/2024
DOB NOWStructuralSigned-offKELRON CONTRACTING INC10/10/2024
DOB NOWGeneral ConstructionSigned-offROYAL CONCRETE AND MASON*10/07/2024
DOB NOWGeneral ConstructionPermit IssuedKELRON CONTRACTING INC07/17/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/29/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/29/2024
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR03/20/2024
DOB NOWGeneral ConstructionSigned-offKELRON CONTRACTING INC03/19/2024
BISFPISSUEDNY FIRE LLC05/20/2015
BISPLISSUEDNATIONWIDE MECHANICAL INC04/02/2015
BISPLISSUEDNATIONWIDE MECHANICAL INC12/04/2013
BISMHISSUEDAGO & ALAUDIN GENERAL CON12/04/2013
BISOTISSUEDAGO & ALAUDIN GENERAL CON11/25/2013
BISPLISSUEDNYC WATER MAIN WKS08/10/2004
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/09/2004
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/09/2004
BISOTISSUEDJERRICK WATERPROOFING CO06/14/2004
BISSPISSUEDSIRINA FIRE PROTECTION CORP04/24/2003
BISFPISSUEDIDEAL FIRE CONTR02/15/2002
BISPLISSUEDPINNACLE PLBG & HTG CORP01/07/2002
BISOTISSUEDBEVARIANA CONSTRUCTION12/12/2001
BISFPISSUEDIDEAL FIRE CONTROL INC03/19/2001
BISEQISSUEDBAVARIA CONSTRUCTION09/09/1999
BISOTISSUEDBAVARIA CONSTRUCTION09/09/1999
1 project · most recent 05/13/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2025Signed-offKELRON CONTRACTING INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg LMN079HVT 7,293 BTU · Split System ×8
LMN159HVT 12,515 BTU · Fan Coil Indoor ×4
LMU363HV 37,545 BTU · Heat Pump Outdoor ×4
LSN090HSV5 6,168 BTU · Split System ×2
LSN120HSV5 6,168 BTU · Split System ×2
Ventilation
Greenheck CUE-090-VG 600 CFM · Exhaust Fan ×2
Titus N/A 300 CFM · Exhaust Fan ×2
1 project · most recent 05/13/2025
Sprinkler System
FiledStatusContractorScope
05/13/2025Signed-offA&H EXPRESS PLBG&HTG CORPSprinkler System
1 project · most recent 05/13/2025
Water/Sanitary
FiledStatusContractorScope
05/13/2025Permit IssuedHT PLUMBING & HEATING CORWater/Sanitary
1 project · most recent 05/27/2024
FiledStatusContractorScope
05/27/2024CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 05/13/2025
Steel Wood
FiledStatusContractorScope
05/13/2025Signed-offKELRON CONTRACTING INCSteel, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/09/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/08/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/19/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
05/19/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
05/19/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
05/19/2025Mechanical SystemsEUGENE BIFULCOspecial
05/19/2025FinalEUGENE BIFULCOprogress
05/19/2025Interior lighting powerEUGENE BIFULCOenergy_progress
05/19/2025Maintenance informationEUGENE BIFULCOenergy_progress
05/19/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
03/20/2025FinalEUGENE BIFULCOprogress
03/20/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/22/2024Post-installed AnchorsEUGENE BIFULCOspecial
08/22/2024Post-installed AnchorsEUGENE BIFULCOspecial
08/12/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/07/2024Structural Steel - DetailsEUGENE BIFULCOspecial
08/07/2024Post-installed AnchorsEUGENE BIFULCOspecial
08/07/2024Structural Steel - WeldingEUGENE BIFULCOspecial
08/07/2024Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
08/06/2024FinalEUGENE BIFULCOprogress
08/06/2024Sprinkler SystemsEUGENE BIFULCOspecial
06/24/2024FinalEUGENE BIFULCOprogress
06/24/2024Fire-Resistance Rated Construction—progress
06/24/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
06/24/2024Masonry—special
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026M00987034-P1Request digital key ↗
08/26/2026M00987034-S4Request digital key ↗
08/26/2026M00987034-S3Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
02/24/2017102247203Open ↗
02/12/2015121817659Open ↗
01/28/2015122261961Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
05/21/2015122261961Open ↗
12/09/2013121817659Open ↗
12/09/2013121817659Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026M00987034-S4Open ↗
08/26/2026M00987034-S3Open ↗
08/26/2026M00987034-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026M00987034-S4Open ↗
09/01/2026M00984059-P1Open ↗
08/27/2026M00987034-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
01/12/2016122261961Open ↗
07/07/2015121817659Open ↗
05/21/2015122261961Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00987034-S4Open ↗
09/01/2026M00984059-P1Open ↗
08/23/2026M00984059-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/28/2015122261961Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/12/2015121817659Open ↗
12/11/2014121817659Open ↗
07/08/2014121817659Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
06/10/2014121817659Open ↗
10/25/2013121817659Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/09/2015121817659Open ↗
07/07/2015121817659Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/12/2016122261961Open ↗
▸BISEQUIPMENT USE PERMITS1
07/07/2015121817659Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/26/2026M00987034-P1Open ↗
08/26/2026M00987034-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00987034-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00987034-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026M00987034-S4Open ↗
08/26/2026M00987034-S3Open ↗
08/26/2026M00987034-S2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/28/2015122261961Open ↗
10/25/2013121817659Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/07/2015121817659Open ↗
01/28/2015122261961Open ↗
01/28/2015122261961Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/07/2015121817659Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/12/2016122261961Open ↗
07/09/2015121817659Open ↗
07/07/2015121817659Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
01/12/2016122261961Open ↗
07/07/2015121817659Open ↗
01/28/2015122261961Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
01/28/2015122261961Open ↗
10/25/2013121817659Open ↗
▸BISADDITIONAL INFORMATION1
01/07/2014121817659Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/26/2026M00987034-P1Open ↗
08/26/2026M00987034-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/28/2015122261961Open ↗