← Back
BuildNYC
Walk-up apt, over six families with stores
1071 CYPRESS AVENUE
QUEENS · Ridgewood · BIN 4086051
💬 Discuss this project
1930Year Built
4Stories
C7Building Class
R5BZoning
—Gross Floor Area
44Units
78 Active Violations 71 unresolved · 7 paperwork only 16 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: Silvershore Properties 95 · 3.18 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Silvershore Properties2003/22/2026
Cypress Realty103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Chloe ConstructionGeneral Contractor303/21/2026
J G GNRL ContractGeneral Contractor103/21/2026
Clean Tech MechanicalPlumbing103/21/2026
Cititech ContractingGeneral Contractor110/06/2010
Building Lifecycle
08/10/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · open
08/10/2026
§ 27-2005, 2007 ADM code and dept. Rules and regulations. Remove the encumbrance obstructing egress from fire escapes flower pots at building…
HPD violation · open
06/23/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 1st STORY, 1st…
HPD violation · open
06/23/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR CERAMIC TILES IN THE KITCHEN LOCATED AT APT 4A, 1st STORY,…
HPD violation · open
06/23/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 1st…
HPD violation · open
199 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Clean Tech Mechanical—
BIS—Clean Tech Mechanical—
BIS—Clean Tech Mechanical—
BIS—Clean Tech Mechanical—
BIS—Chloe Construction—
BIS—Chloe Construction—
BIS—Clean Tech Mechanical—
BIS—Chloe Construction—
BIS—Clean Tech Mechanical—
BIS—Chloe Construction—
BIS—Chloe Construction—
BIS—Clean Tech Mechanical—
BIS—Clean Tech Mechanical—
BIS—Chloe Construction—
BIS—Clean Tech Mechanical—
BIS—Chloe Construction—
BIS—J & G GNRL—
BIS—Cititech Contracting—
Nothing on file for this building.
Nothing on file for this building.
102 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account