BRONX · Concourse-Concourse Village · BIN 2002629
💬 Discuss this project
1925Year Built
2Stories
C3Building Class
R7-1Zoning
3,496 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Four families · 2,800 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 6 docs
Bulkhead1p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
Basement1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PADREA CONTRACTING CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NOEL WONG, RA310/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAMNAUTH, DIANANDElectrical203/21/2026
THOMAS, FREDElectrical203/21/2026
TUITUPO, DANNYElectrical203/21/2026
YOSEF BLAUElectrical103/21/2026
Building Lifecycle
All (86)Filed (3)Violation (24)Objection (40)Special Inspection (19)
04/30/2026
Violation issued (HPD, open)
A
10/01/2024
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01079654-S1
09/27/2024
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01079654-S2
09/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/26/2024
Special inspection requirement — Heating Systems
09/26/2024
Special inspection requirement — Post-installed Anchors
09/26/2024
Special inspection requirement — Maintenance information
09/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
09/26/2024
Special inspection requirement — Ventilation and air distribution system
09/26/2024
Special inspection requirement — Maintenance information
09/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/26/2024
Special inspection requirement — Permanent certificate
09/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
09/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
09/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
09/26/2024
Special inspection requirement — Permanent certificate
09/18/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
08/30/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Objection resolved — Addressed
07/31/2024
Special inspection requirement — Final
07/31/2024
Special inspection requirement — Mechanical Systems
07/23/2024
Objection raised — Fire_Protection
07/23/2024
Objection raised — Fire_Protection
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Energy
07/23/2024
Objection raised — Inspections
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Zoning
07/23/2024
Objection raised — Cost
07/23/2024
Objection raised — Zoning
07/23/2024
Objection raised — Accessibility
07/23/2024
Objection raised — Zoning
07/23/2024
Objection raised — Scope
07/23/2024
Objection raised — Fire_Protection
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Zoning
07/23/2024
Objection raised — Structural
07/23/2024
Objection raised — Fire_Protection
07/23/2024
Objection raised — Other
Latest 60 of 86 events.
Nothing on file for this building.
1 project · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
1 project · most recent 10/01/2024
FiledStatusContractorScope
10/01/2024——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/26/2024HVAC-R and service water piping design and insulation—energy_progress
09/26/2024Fire-Resistant Penetrations and Joints—special
09/26/2024Heating Systems—special
09/26/2024Post-installed Anchors—special
09/26/2024Maintenance information—energy_progress
09/26/2024HVAC-R and service water heating system controls—energy_progress
09/26/2024Fire-Resistance Rated Construction—progress
09/26/2024Ventilation and air distribution system—energy_progress
09/26/2024Maintenance information—energy_progress
09/26/2024HVAC-R and service water piping design and insulation—energy_progress
09/26/2024Permanent certificate—energy_progress
09/26/2024HVAC-R and service water heating equipment—energy_progress
09/26/2024HVAC-R and service water heating system controls—energy_progress
09/26/2024Fire-Resistant Penetrations and Joints—special
09/26/2024Energy Code Compliance Inspections—progress
09/26/2024HVAC-R and service water heating equipment—energy_progress
09/26/2024Permanent certificate—energy_progress
07/31/2024Final—progress
07/31/2024Mechanical Systems—special
▾Documents — 23 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/27/2019220722975Open ↗
▸BISWORK PERMIT APPLICATION1
12/27/2019220722975Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01079654-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026X01079654-I1Open ↗
08/13/2026X01079654-S1Open ↗
08/13/2026X01079654-S2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/27/2019220722975Open ↗
12/27/2019220722975Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/27/2019220722975Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/27/2019220722975Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
12/27/2019220722975Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026X01079654-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/27/2019220722975Open ↗
12/27/2019220722975Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/10/2020220722975Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/10/2020220722975Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/10/2020220722975Open ↗
08/10/2020220722975Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/10/2020220722975Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/10/2020220722975Open ↗
12/27/2019220722975Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/27/2019220722975Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026X01079654-I1Open ↗