← Back
Two stories - detached, small or mid-size
1073 73 STREET
BROOKLYN · BIN 3147689
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4-1Zoning
1,440 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 1,858 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 12 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M J DESIGN BUILD1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2022$1.0M—— → —$708/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC407/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INTEGRITY UV 168603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M J DESIGN AND BUILD INCGeneral Contractor207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341407/06/2022
Building Lifecycle
All (33)Filed (4)Permit Issued (3)Signed Off (2)Inspection (6)Special Inspection (18)
07/15/2022
Signed off — Alteration
RENOVATION OF A TWO STORY BRICK WITH CELLAR HOUSE, PARTITION WORK AND INSTALLING SPLIT A/C UNIT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00673085-I1
07/14/2022
Signed off — Alteration
B00673306-I1
07/11/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/06/2022
Filed — Alteration
B00673306-P1
06/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
06/30/2022
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
06/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michelle Contri
06/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michelle Contri
06/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michelle Contri
06/27/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/13/2022
Filed — Alteration
RENOVATION OF A TWO STORY BRICK WITH CELLAR HOUSE, PARTITION WORK AND INSTALLING SPLIT A/C UNIT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00673085-P1
06/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Michelle Contri
06/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michelle Contri
06/08/2022
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
06/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michelle Contri
06/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
06/08/2022
Special inspection requirement — Insulation placement and R values
Michelle Contri
06/08/2022
Special inspection requirement — Fenestration air leakage
Michelle Contri
06/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michelle Contri
06/08/2022
Special inspection requirement — Fenestration areas
Michelle Contri
06/08/2022
Special inspection requirement — Mechanical Systems
Michelle Contri
06/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
06/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
06/08/2022
Special inspection requirement — Final
Michelle Contri
06/01/2022
Permit issued — Mechanical Systems
B00673085-I1-GC-CX
04/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2022
Permit issued — General Construction
B00673085-I1-GC-CX
02/10/2022
Permit issued — Plumbing
B00673306-I1-PL
02/04/2022
Filed — Alteration
RENOVATION OF A TWO STORY BRICK WITH CELLAR HOUSE, PARTITION WORK AND INSTALLING SPLIT A/C UNIT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00673085-I1
02/04/2022
Filed — Alteration
B00673306-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offM J DESIGN AND BUILD INC06/01/2022
DOB NOWGeneral ConstructionSigned-offM J DESIGN AND BUILD INC02/10/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/10/2022
1 project · most recent 02/14/2022
General Wiring
FiledStatusContractorScope
02/14/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/11/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2022Fail-Final General Construction Non-Directive 14FailView ↗
04/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/30/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
06/30/2022Energy Code Compliance InspectionsMichelle Contriprogress
06/30/2022HVAC-R and service water heating equipmentMichelle Contrienergy_progress
06/30/2022HVAC-R and service water heating system controlsMichelle Contrienergy_progress
06/30/2022HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
06/08/2022Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
06/08/2022HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
06/08/2022Air barrier - visual inspectionMichelle Contrienergy_progress
06/08/2022HVAC-R and service water heating equipmentMichelle Contrienergy_progress
06/08/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
06/08/2022Insulation placement and R valuesMichelle Contrienergy_progress
06/08/2022Fenestration air leakageMichelle Contrienergy_progress
06/08/2022HVAC-R and service water heating system controlsMichelle Contrienergy_progress
06/08/2022Fenestration areasMichelle Contrienergy_progress
06/08/2022Mechanical SystemsMichelle Contrispecial
06/08/2022Structural Stability – Alterations of existing buildingsMichelle Contrispecial
06/08/2022Energy Code Compliance InspectionsMichelle Contriprogress
06/08/2022FinalMichelle Contriprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00673306-I1Request digital key ↗
08/31/2026B00673306-P1Request digital key ↗
08/31/2026B00673085-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00673085-P1Open ↗
08/31/2026B00673085-P1Open ↗
08/31/2026B00673085-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00673306-P1Open ↗
08/31/2026B00673306-I1Open ↗
08/31/2026B00673085-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00673085-P1Open ↗
08/31/2026B00673085-P1Open ↗
08/31/2026B00673085-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00673306-P1Open ↗
08/31/2026B00673306-I1Open ↗
08/31/2026B00673085-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00673085-I1Open ↗
08/13/2026B00673306-I1Open ↗