← Back
BuildNYC
Over six families without stores
1073 BEDFORD AVENUE
BROOKLYN · BIN 3050557
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R7AZoning
—Gross Floor Area
12Units
29 Active Violations 23 unresolved · 6 paperwork only 4 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: 1073-75 Bedford · 2.88 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof1073-75 Bedford LLCUnder Construction4p · 1 filing · 12 docs
Floor 4Unit 4BUnder Construction5p · 1 filing · 12 docs
Floor 3Unit 3A, Unit 3CUnder Construction4p · 1 filing · 12 docs
Floor 2Unit 2CUnder Construction4p · 1 filing · 12 docs
Floor 11073-75 Bedford LLCUnder Construction4p · 1 filing · 12 docs
Cellar1073-75 Bedford LLCUnder Construction10p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1073-75 Bedford1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Charles Diehl Architect311/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
George BassolinoPlumbing203/21/2026
Tom Braun Plumbing & HeatingPlumbing203/21/2026
BH General Contractingspecialty_contractor109/01/2026
Prime Piping & HeatingPlumbing110/04/2026
A&L Construction USAGeneral Contractor408/11/2014
S.J. Vision & Son PlumbingGeneral Contractor110/28/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524311/20/2026
Building Lifecycle
11/20/2026
Filed — Alteration
PROPOSED INT. RENO OF EXISTING 4-STORY OVER CELLAR RES BLDNG ON CEL, 1-4, ROF. WORK INCLUDES PARTITIONS & INSTALLATION OF 2 CONDENSING UNITS AT ROF ON METAL BRACKETS. ALL WORK FILED TO ADDRESS ECB VIOS: 5153484K;35153483Z;35089671M;35086514P;35086512L.
B01392428-P1
09/28/2026
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
09/04/2026
Permit issued — Plumbing
B01392428-S1-PL
08/31/2026
Permit issued — Mechanical Systems
B01392428-I1-GC-CX
05/18/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT…
HPD violation · open
178 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPrime Piping & Heating09/04/2026
DOB NOWMechanical SystemsPermit IssuedBH General Contracting08/31/2026
BISOTISSUEDS.J. Vision & Son Plumbing10/28/2015
BISOTISSUEDA&L Construction USA08/11/2014
BISOTISSUEDA&L Construction USA06/26/2014
BISOTISSUEDA&L Construction USA11/26/2013
BISOTISSUEDA&L Construction USA07/03/2013
BISBLISSUEDTom Braun Plumbing & Heating01/11/2006
BISPLISSUEDTom Braun Plumbing & Heating01/11/2006
BISPLISSUEDGeorge Bassolino01/10/1994
BISBLISSUEDGeorge Bassolino01/10/1994
1 project · most recent 11/20/2026
Air Conditioning Systems
FiledStatusContractorScope
11/20/2026Permit IssuedBH General ContractingAir Conditioning Systems
1 project · most recent 11/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/20/2026Permit IssuedAmb MechanicalGas, Water/Sanitary
2 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedSK Electrical ContractorsGeneral Wiring
06/10/2026CompleteSK Electrical ContractorsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/28/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
04/28/2026Maintenance informationShahrish Shuvoenergy_progress
04/28/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
04/28/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
04/27/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
04/24/2026FinalShahrish Shuvoprogress
04/24/2026Mechanical SystemsShahrish Shuvospecial
04/24/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/24/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
96 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account