Over six families without stores
1073 TIFFANY STREET
BRONX · Longwood · BIN 2130636
💬 Discuss this project
2021Year Built
4Stories
C1Building Class
R7-1Zoning
7,060 sfGross Floor Area
14Units
Rent Stabilized1 Open Violation ▸
Over six families without stores · Owner of record: 1073 TIFFANY LLC · 2,500 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Roof60p · 3 filings · 20 docs
Penthouse22p · 1 filing · 20 docs
Floor 445p · 3 filings · 20 docs
Floor 344p · 3 filings · 20 docs
Floor 244p · 3 filings · 20 docs
Floor 153p · 4 filings · 20 docs
Cellar10p · 1 filing · 5 docs
Site & exterior19p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1073 TIFFANY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/16/2021$490K—1073 TIFFANY BX LLC → 1073 TIFFANY LLC$69/sf building
01/05/2016$280K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1004/14/2022
SYED ENGINEERING, P.C.102/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING1003/21/2026
CONSOLIDATED SCAFFOLD BRIDGE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALL TO WALL CONSTRUCTIO*General Contractor1407/08/2026
BOND CONSTRUCTION INCGeneral Contractor507/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor303/21/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795504/14/2022
NODE ARCHITECTURE,ENGINEE6799704/14/2022
Building Lifecycle
All (85)Filed (11)Permit Issued (14)Signed Off (8)Violation (11)Inspection (11)Special Inspection (30)
01/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/19/2025
Violation issued (HPD, open)
C
06/19/2025
Violation issued (HPD, closed)
C
06/19/2025
Violation issued (HPD, closed)
A
06/19/2025
Violation issued (HPD, closed)
A
06/16/2025
Violation issued (HPD, closed)
A
05/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2024
Permit issued — General Construction
X00560462-I1-GC
01/09/2024
Signed off — Alteration
FILING FOR THE PLUMBING WORK IN CONJUNCTION WITH NB#X00560462, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00560514-I1
10/25/2023
Signed off — New Building
NEW SPRINKLER INSTALLATION SYSTEM IN CONJUNTION WITH NB #X00560462-I1 AS PER PLANS
X00560462-S3
09/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/07/2023
Signed off — New Building
NEW SPRINKLER INSTALLATION SYSTEM IN CONJUNTION WITH NB #X00560462-I1 AS PER PLANS
X00560462-S2
08/18/2023
Signed off — New Building
NEW SPRINKLER INSTALLATION SYSTEM IN CONJUNTION WITH NB #X00560462-I1 AS PER PLANS
X00560462-S1
08/18/2023
Signed off — Alteration
Filing Fence application in conjunction with NB application #X00560462-I1
X00560908-I1
05/26/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/27/2023
Permit issued — General Construction
X00560462-I1-GC
02/21/2023
Permit issued — General Construction
X00560462-I1-GC
02/15/2023
Permit issued — Mechanical Systems
X00560462-S3-MS
02/15/2023
Permit issued — Protection and Mechanical Methods
X00560462-S1-PMM
11/14/2022
Signed off — Alteration
TEMPORARY INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2014.
X00682257-I1
08/18/2022
Permit issued — Construction Fence
X00560908-I1-FN
08/17/2022
Permit issued — General Construction
X00560462-I1-GC
08/02/2022
Signed off — Alteration
Earthwork and Foundation work in conjunction with NB app#X00560462-I1
X00560900-I1
07/13/2022
Permit issued — General Construction
X00560462-I1-GC
06/03/2022
Signed off — Alteration
X00560881-I1
05/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/26/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Violation issued (ECB, closed)
Construction
05/06/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2022
Filed — Alteration
FILING FOR THE PLUMBING WORK IN CONJUNCTION WITH NB#X00560462, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00560514-P1
04/01/2022
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
04/01/2022
Special inspection requirement — Metering
Radomir Delic
04/01/2022
Special inspection requirement — Maintenance information
Radomir Delic
03/31/2022
Permit issued — Sprinklers
X00560462-S2-EW-SP
03/30/2022
Permit issued — Plumbing
X00560514-I1-PL
03/10/2022
Filed — New Building
NEW SPRINKLER INSTALLATION SYSTEM IN CONJUNTION WITH NB #X00560462-I1 AS PER PLANS
X00560462-S3
03/03/2022
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — Final
Radomir Delic
03/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
03/03/2022
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — Heating Systems
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
03/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
02/17/2022
Permit issued — Sidewalk Shed
X00682257-I1-SH
02/16/2022
Filed — Alteration
TEMPORARY INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2014.
X00682257-I1
02/14/2022
Filed — Alteration
FILING FOR THE PLUMBING WORK IN CONJUNCTION WITH NB#X00560462, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00560514-I1
02/14/2022
Filed — New Building
NEW SPRINKLER INSTALLATION SYSTEM IN CONJUNTION WITH NB #X00560462-I1 AS PER PLANS
X00560462-S2
02/01/2022
Filed — New Building
NEW SPRINKLER INSTALLATION SYSTEM IN CONJUNTION WITH NB #X00560462-I1 AS PER PLANS
X00560462-S1
02/01/2022
Permit issued — Structural
X00560881-I1-ST
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*04/25/2024
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*04/27/2023
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*02/21/2023
DOB NOWMechanical SystemsSigned-offWALL TO WALL CONSTRUCTIO*02/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offWALL TO WALL CONSTRUCTIO*02/15/2023
DOB NOWConstruction FenceSigned-offWALL TO WALL CONSTRUCTIO*08/18/2022
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*08/17/2022
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*07/13/2022
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND03/31/2022
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN03/30/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING02/17/2022
DOB NOWStructuralSigned-offBOND CONSTRUCTION INC02/01/2022
DOB NOWFoundationSigned-offBOND CONSTRUCTION INC11/19/2021
DOB NOWConstruction FenceSigned-offBOND CONSTRUCTION INC08/23/2021
BIS—ISSUEDGATEWAY DEMOLITION CORP.09/15/1994
1 project · most recent 03/10/2022
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/10/2022Permit IssuedWALL TO WALL CONSTRUCTIO*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-GL09NA/ NTTXWST12A112AA 399 CFM · Split System ×16
2 projects · most recent 07/11/2023
General Wiring
FiledStatusContractorScope
07/11/2023CompleteDENNISON ELECTRIC CORPGeneral Wiring
02/17/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/27/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/06/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
04/01/2022Protection of exposed foundation insulationRadomir Delicenergy_progress
04/01/2022MeteringRadomir Delicenergy_progress
04/01/2022Maintenance informationRadomir Delicenergy_progress
03/03/2022Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
03/03/2022HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
03/03/2022Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
03/03/2022FinalRadomir Delicprogress
03/03/2022Fire-Resistant Penetrations and JointsRadomir Delicspecial
03/03/2022Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
03/03/2022Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
03/03/2022Heating SystemsMICHAEL KARANTINIDIS, P.E.special
03/03/2022HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
03/03/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
03/03/2022HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
01/25/2022MasonryRadomir Delicspecial
01/25/2022Structural Cold-Formed SteelRadomir Delicspecial
10/13/2021Concrete - Cast-In-PlaceRadomir Delicspecial
10/13/2021Excavations - Sheeting, Shoring, and BracingRadomir Delicspecial
10/13/2021Subgrade InspectionsRadomir Delicspecial
10/13/2021Subsurface Conditions – Fill Placement & In-Place DensityMICHAEL KARANTINIDIS, P.E.special
07/20/2021Insulation placement and R valuesRadomir Delicenergy_progress
07/20/2021Lighting in dwelling unitsRadomir Delicenergy_progress
07/20/2021Fenestration air leakageRadomir Delicenergy_progress
07/20/2021Fenestration areasRadomir Delicenergy_progress
07/20/2021Lighting controlsRadomir Delicenergy_progress
Latest 25 of 35.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026X00560908-I1Request digital key ↗
08/25/2026X00560908-P1Request digital key ↗
08/25/2026X00560900-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
09/24/2024200291807Open ↗
09/13/2024200291807Open ↗
09/13/2024200291807Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/01/2021240308181Open ↗
08/31/2021240308181Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X00560462-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00560462-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026X00560462-I1Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature25
08/31/2026X00560881-I1Open ↗
08/31/2026X00560462-I1Open ↗
08/31/2026X00560462-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026X00560908-I1Open ↗
08/25/2026X00560900-I1Open ↗
08/24/2026X00560514-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026X00560881-I1Open ↗
08/31/2026X00560881-I1Open ↗
08/31/2026X00560462-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/01/2021240308181Open ↗
08/31/2021240308181Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/31/2021240308181Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X00560462-I1Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
11/01/2021240308181Open ↗
08/31/2021240308181Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/31/2021240308181Open ↗
▸BISSTREET TREES SITE PLAN1
11/01/2021240308181Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00560462-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026X00560462-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00560462-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00560462-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00560514-I1Open ↗
08/13/2026X00560462-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00560462-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026X00560462-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/31/2021240308181Open ↗
▸BISADDITIONAL INFORMATION1
02/01/2022240308181Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION5
11/01/2021240308181Open ↗
11/01/2021240308181Open ↗
08/31/2021240308181Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X00560462-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00560900-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00560462-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00560462-I1Open ↗