← Back
Three families
1074 KELLY STREET
BRONX · Longwood · BIN 2099818
💬 Discuss this project
1994Year Built
3Stories
C0Building Class
R7-1Zoning
3,535 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Three families · 4,200 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 1 filing · 20 docs
PenthouseUnder Construction21p · 1 filing · 20 docs
Floor 4Under Construction13p · 1 filing · 20 docs
Floor 3Under Construction31p · 1 filing · 20 docs
Floor 2Under Construction32p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
CellarUnder Construction35p · 1 filing · 20 docs
Site & exteriorUnder Construction13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACCRETE CONSTRUCTION GROUP1709/30/2026
DELUXE CONSTRUCTION CORP OF N Y203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC108/25/2026
FABIAN CRUZ PE PLLC307/23/2026
PAUL CHRISTAKOS ARCHITECTURE706/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACCRETE CONSTRUCTION203/21/2026
S G DRAFTING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADI AL CONSTRUCTION INCGeneral Contractor508/26/2026
PRIME PIPING & HEATING INFire Protection109/30/2026
ACCRETE CONSTRUCTION GROUPGeneral Contractor107/03/2026
AKM CONSTRUCTION NY CORPGeneral Contractor108/27/2026
HORBRIDGE PLUMBING & HEATINGPlumbing108/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLUE LIGHT CONSULTING &AM9394107/23/2026
AA BUILDING & INSPECTION1519506/23/2026
PAUL CHRISTAKOS ARCHITECT5894107/14/2025
Building Lifecycle
All (74)Filed (11)Permit Issued (9)Violation (16)Inspection (1)Objection (7)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
X01255054-S8-EW-SP
08/26/2026
Permit issued — Sidewalk Shed
X01448374-I1-SH
08/26/2026
Permit issued — Sprinklers
X01255054-S8-PL
08/25/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ENLARGEMENT FILED UNDER APPLICATION # X01255054. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01448374-I1
08/14/2026
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
08/14/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/14/2026
Special inspection requirement — Concrete - Precast
Younes Abouyaala
08/14/2026
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
08/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Permit issued — Structural
X01255054-S7-ST
08/03/2026
Permit issued — Foundation
X01255054-S4-FO
07/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S8
07/23/2026
Special inspection requirement — Maintenance information
Feng Li
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Feng Li
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Feng Li
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Feng Li
07/22/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Feng Li
07/22/2026
Special inspection requirement — Sprinkler Systems
Feng Li
07/21/2026
Objection resolved — Resolved
07/06/2026
Permit issued — General Construction
X01255054-I1-GC
07/02/2026
Violation issued (ECB, open)
Unknown
06/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-P2
06/23/2026
Objection raised — Other
06/17/2026
Permit issued — Construction Fence
X01405233-I1-FN
06/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
06/17/2026
Special inspection requirement — Final
NAVEEN KUMAR
06/17/2026
Special inspection requirement — Concrete - Precast
Younes Abouyaala
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
06/17/2026
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
06/17/2026
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
06/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/02/2026
Permit issued — General Construction
X01255054-I1-GC
05/22/2026
Permit issued — Construction Fence
X01405233-I1-FN
05/21/2026
Filed — Alteration
TEMPORARY 8'-0" HIGH CONSTRUCTION FENCE
X01405233-I1
05/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S7
05/11/2026
Special inspection requirement — Masonry
Younes Abouyaala
05/11/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S6
05/05/2026
Objection raised — Other
05/05/2026
Objection raised — Other
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S2
04/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S1
04/29/2026
Objection resolved — Addressed
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/29/2026
Special inspection requirement — Maintenance information
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/07/2026
Objection raised — Other
02/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S5
02/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-S4
01/21/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
01/21/2026
Special inspection requirement — Final
NAVEEN KUMAR
11/17/2025
Violation issued (HPD, closed)
I
09/04/2025
Objection raised — Other
07/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH X01255054-I1.
X01255054-I1
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN09/29/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP08/26/2026
DOB NOWSprinklersPermit IssuedHORBRIDGE PLUMBING & HEATING08/26/2026
DOB NOWStructuralPermit IssuedADI AL CONSTRUCTION INC08/04/2026
DOB NOWFoundationPermit IssuedADI AL CONSTRUCTION INC08/03/2026
DOB NOWGeneral ConstructionPermit IssuedADI AL CONSTRUCTION INC07/06/2026
DOB NOWConstruction FencePermit IssuedADI AL CONSTRUCTION INC06/17/2026
DOB NOWGeneral ConstructionPermit IssuedADI AL CONSTRUCTION INC06/02/2026
DOB NOWConstruction FencePermit IssuedACCRETE CONSTRUCTION GROUP05/22/2026
BIS—ISSUEDDELUXE CONSTRUCTION CORP.OF N.Y.11/01/1994
BISPLISSUEDDUO PLUMBING & HTG CORP.12/13/1993
BISSPISSUEDDUO PLUMBING & HTG CORP.12/13/1993
BIS—ISSUEDDELUXE CONSTRUCTION CORP.OF N.Y.11/08/1993
BISPLISSUEDDUO PLUMBING & HTG CORP.04/28/1993
BIS—ISSUEDDELUXE CONSTRUCTION CORP.OF N.Y.10/27/1992
BIS—ISSUEDDELUXE CONSTRUCTION CORP. OF N.Y02/05/1992
BIS—ISSUEDDELUXE CONSTRUCTION CORP.OF N.Y.12/26/1991
BIS—ISSUEDDELUXE CONSTRUCTION CORP.OF N.Y.12/26/1991
1 project · most recent 07/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2026Permit IssuedADI AL CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Friedrich FRIEDRICH PZH09K3SB 9,400 BTU · Ptac ×20
FRIEDRICH, PZHO7K3SB 7,200 BTU · Ptac ×17
Ventilation
Greenheck GREENHECK GB SERIES 380 CFM · Kitchen Exhaust ×6
1 project · most recent 07/23/2026
Sprinkler System
FiledStatusContractorScope
07/23/2026Permit IssuedPRIME PIPING & HEATING INSprinkler System
1 project · most recent 07/23/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/23/2026Permit IssuedHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
2 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/27/2026Permit IssuedK.A.B. ELECTRIC CORPGeneral Wiring
1 project · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026Permit IssuedPRIME PIPING & HEATING IN2 scope_items
2 projects · most recent 08/25/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/25/2026Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
05/21/2026Permit IssuedADI AL CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/14/2026Structural Cold-Formed SteelYounes Abouyaalaspecial
08/14/2026FinalNAVEEN KUMARprogress
08/14/2026Structural Steel - High Strength BoltingYounes Abouyaalaspecial
08/14/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/14/2026Concrete - PrecastYounes Abouyaalaspecial
08/14/2026Structural Steel - WeldingYounes Abouyaalaspecial
08/14/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
07/23/2026Maintenance informationFeng Lienergy_progress
07/23/2026HVAC-R and service water piping design and insulationFeng Lienergy_progress
07/23/2026HVAC-R and service water heating system controlsFeng Lienergy_progress
07/23/2026HVAC-R and service water heating equipmentFeng Lienergy_progress
07/22/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFeng Lispecial
07/22/2026Sprinkler SystemsFeng Lispecial
06/17/2026Structural Steel - High Strength BoltingYounes Abouyaalaspecial
06/17/2026FinalNAVEEN KUMARprogress
06/17/2026Concrete - PrecastYounes Abouyaalaspecial
06/17/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
06/17/2026Structural Cold-Formed SteelYounes Abouyaalaspecial
06/17/2026Structural Steel - WeldingYounes Abouyaalaspecial
06/17/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/11/2026MasonryYounes Abouyaalaspecial
05/11/2026FinalNAVEEN KUMARprogress
05/11/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/05/2026Structural Stability – Alterations of existing buildings—special
04/29/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 33.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026X01448374-I1Request digital key ↗
08/16/2026X01255054-S5Request digital key ↗
08/16/2026X01255054-S4Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01255054-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026X01255054-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026X01255054-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026X01448374-I1Open ↗
08/16/2026X01255054-S4Open ↗
08/16/2026X01255054-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/27/2026X01255054-S7Open ↗
08/28/2026X01255054-S4Open ↗
08/28/2026X01255054-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026X01255054-S7Open ↗
08/26/2026X01255054-S8Open ↗
08/26/2026X01255054-S8Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/16/2026X01255054-I1Open ↗
08/16/2026X01255054-S6Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01255054-I1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/16/2026X01255054-I1Open ↗
08/16/2026X01255054-S6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026X01255054-I1Open ↗
08/16/2026X01255054-S6Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026X01255054-I1Open ↗