← Back
Elevator apt, semi-fireproof without stores
1075 HALL PLACE
BRONX · BIN 2090433
💬 Discuss this project
2003Year Built
7Stories
D1Building Class
R7-1Zoning
23,746 sfGross Floor Area
32Units
Rent Stabilized0 Open ViolationsFISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 1075 HALL PLACE LLC · 6,321 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 2 filings · 6 docs
Floor 716p · 3 filings · 20 docs
Floor 615p · 3 filings · 20 docs
Floor 515p · 3 filings · 20 docs
Floor 415p · 3 filings · 20 docs
Floor 315p · 3 filings · 20 docs
Floor 216p · 3 filings · 20 docs
Floor 119p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP507/08/2026
1190 WASHINGTON AVE2307/08/2026
1075 HALL PLACE LLC4503/22/2026
GRECIAN INTL INC103/22/2026
OWNER OF 1073 HALL PL103/22/2026
OWNER OF 1075 HALL PLACE103/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NOEL WONG502/25/2026
STEEL CORE ENGINEERING PLLC102/12/2025
PAUL PERDEK, PROF. ENG. PLLC201/07/2025
ARIEL AKRAB112/24/2024
ENGINEERING PROFESSIONAL SERVICE P.212/04/2024
SHAHRIAR RAFI105/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
HIGHRISE GROUP803/21/2026
MEP DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDERS NYC LLCGeneral Contractor707/08/2026
P.H. WORKS INCPlumbing407/08/2026
F.S. WORKS INCFire Protection207/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor207/08/2026
MUM ELECTRICAL CORPElectrical103/22/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616802/25/2026
Building Lifecycle
All (157)Filed (11)Permit Issued (12)Signed Off (7)Facade (FISP) (3)Violation (60)Inspection (8)Objection (26)Special Inspection (30)
05/29/2026
Violation issued (ECB, closed)
Elevators
05/29/2026
Violation issued (ECB, closed)
Boilers
05/29/2026
Violation issued (ECB, closed)
Construction
03/16/2026
Signed off — Alteration CO
X00947868-S1
03/16/2026
Objection resolved — Addressed
03/04/2026
Objection raised — Zoning
02/25/2026
Filed — Alteration CO
X00947868-P5
02/09/2026
Signed off — Alteration
Modification of existing plumbing, sprinkler and standpipe work in conjunction with alteration application X00947868.
X01022232-I1
01/14/2026
Signed off — Alteration
X01022242-I1
12/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/30/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/26/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Signed off — Alteration
PROPOSED FOUNDATION WORK IN CONJUNCTION WITH G/C FILING X00947868-I1
X01176989-I1
11/21/2025
Signed off — Alteration CO
X00947868-S2
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/25/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/25/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
09/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/25/2025
Special inspection requirement — Metering
FAHAD FATEH
09/25/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/25/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/25/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
09/25/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/25/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/25/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/25/2025
Special inspection requirement — Masonry
FAHAD FATEH
09/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01163747-I1
09/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01163756-I1
07/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/09/2025
Permit issued — Mechanical Systems
X01022242-I1-MS
06/26/2025
Permit issued — Plumbing
X01022232-I1-EW-SD
06/25/2025
Permit issued — Plumbing
X01022232-I1-PL
06/25/2025
Permit issued — Sprinklers
X01022232-I1-EW-SP
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Other
05/06/2025
Objection resolved — Addressed
03/24/2025
Permit issued — Foundation
X01176989-I1-FO
03/17/2025
Permit issued — General Construction
X00947868-I1-GC
03/17/2025
Permit issued — General Construction
X00947868-S1-GC-CX
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/24/2025
Objection resolved — Addressed
02/21/2025
Objection raised — Structural
02/21/2025
Objection raised — Plumbing
02/21/2025
Objection raised — Structural
02/21/2025
Objection raised — Structural
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offH BUILDERS NYC LLC07/09/2025
DOB NOWPlumbingSigned-offF.S. WORKS INC06/26/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC06/25/2025
DOB NOWSprinklersSigned-offF.S. WORKS INC06/25/2025
DOB NOWFoundationSigned-offH BUILDERS NYC LLC03/24/2025
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC03/17/2025
DOB NOWGeneral ConstructionSigned-offH BUILDERS NYC LLC03/17/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/23/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/14/2025
DOB NOWFoundationSigned-offH BUILDERS NYC LLC12/13/2024
DOB NOWConstruction FenceSigned-offH BUILDERS NYC LLC12/13/2024
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC12/11/2024
BISSPISSUEDMETFLOW FIRE CONTROL LLC09/01/2017
BISMHISSUEDGREENLINE DEVELOPERS LLC01/13/2017
BIS—RE-ISSUEDGREENLINE DEVELOPERS LLC12/27/2016
BISEQISSUEDKINGS STAR CONSTRUCTION C03/17/2014
BISBLISSUEDTMS PLMBG & HTG CORP03/12/2007
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING CO11/16/2006
BISSPISSUEDWAGNER ZIV PLUMBING & HEATING CO11/16/2006
BISSDISSUEDWAGNER ZIV PLUMBING & HEATING CO11/16/2006
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING CO09/15/2006
BISEQISSUEDREYES INTERNATIONAL ASSOC INC.07/21/2006
BIS—ISSUEDAAA GENERAL CONSTRUCTION INC03/15/2005
BISEQISSUEDAAA GEN'L CONSTRUCTION INC03/15/2005
BISPLISSUEDSTUART WACHTEL & SON, INC.04/22/2004
BIS—ISSUEDJ & M SCHIRRIA CONST,CORP01/23/2004
BISEQISSUEDJ & M SCHIRRIA CONST,CORP01/21/2004
BIS—ISSUEDJ & M SCHIRRIA CONST,CORP08/29/2003
BISEQISSUEDJ & M SCHIRRIA CONST,CORP08/22/2003
3 projects · most recent 03/22/2026
General Wiring
FiledStatusContractorScope
03/22/2026CompleteMUM ELECTRICAL CORPGeneral Wiring
01/06/2025CompleteSOLAS ELECTRICAL CORP—
09/06/2022CompletePLATINUM PWR ELECTL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/30/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/26/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/25/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/21/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/25/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/25/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/25/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/25/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
09/25/2025Air barrier — testing FAHAD FATEHenergy_progress
09/25/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/25/2025MeteringFAHAD FATEHenergy_progress
09/25/2025Maintenance informationFAHAD FATEHenergy_progress
09/25/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/25/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
09/25/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/25/2025Fenestration areasFAHAD FATEHenergy_progress
09/25/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
09/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/25/2025MasonryFAHAD FATEHspecial
02/11/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
02/06/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
02/06/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
02/05/2025Footing and FoundationFAHAD FATEHprogress
02/05/2025FinalFAHAD FATEHprogress
12/02/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
05/29/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/21/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
05/10/2024Structural Cold-Formed SteelFAHAD FATEHspecial
05/10/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
Latest 25 of 32.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/20/2026X01022232-I1Request digital key ↗
08/20/2026X01022242-I1Request digital key ↗
08/20/2026X01163756-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION9
02/24/2025240360523Open ↗
02/10/2025240360523Open ↗
01/08/2025240360523Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
09/05/2017220579906Open ↗
01/17/2017220358583Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00947868-P3Open ↗
08/13/2026X00947868-I1Open ↗
08/13/2026X00947868-P5Open ↗
Showing 3 of 4 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
03/06/2014200782698Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00947868-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/20/2026X01022242-I1Open ↗
08/20/2026X01163756-I1Open ↗
08/17/2026X00947868-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026X01176989-I1Open ↗
08/27/2026X01022232-I1Open ↗
08/25/2026X00947868-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/29/2017220579906Open ↗
09/05/2017220579906Open ↗
03/06/2017220358583Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026X01176989-I1Open ↗
08/25/2026X00947868-S1Open ↗
08/23/2026X00947868-P3Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL/OWNER SIGNATURES1
02/02/2018200782698Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/02/2024240360523Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00947868-I1Open ↗
08/13/2026X00947868-P2Open ↗
08/13/2026X00947868-P3Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/26/2017220579906Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026X01022232-I1Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist5
08/13/2026X00947868-I1Open ↗
08/13/2026X00947868-P5Open ↗
08/13/2026X00947868-S1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
01/10/2025240360523Open ↗
01/08/2025240360523Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026X00947868-S1Open ↗
08/13/2026X00947868-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026X00947868-S1Open ↗
08/13/2026X00947868-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/23/2024240360523Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00947868-I1Open ↗
▸Energy Compliance1
▸BISAS-BUILT ENERGY ANALYSIS1
03/07/2017220358583Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026X00947868-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00947868-S1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
02/12/2018200782698Open ↗
02/02/2018200782698Open ↗
11/29/2017220358583Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
02/12/2018200782698Open ↗
02/02/2018200782698Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
10/06/2017220579906Open ↗
03/07/2017220358583Open ↗
02/13/2014220358583Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSmoke/Carbon Monoxide Alarms Affidavit2
08/13/2026X00947868-I1Open ↗
08/13/2026X00947868-I1Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM4
02/02/2018200782698Open ↗
11/29/2017220358583Open ↗
10/06/2017220579906Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
01/26/2017220579906Open ↗
02/13/2014220358583Open ↗
02/11/2014220358244Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/02/2024240360523Open ↗
▸BISADDITIONAL INFORMATION1
07/25/2017220579906Open ↗
▸Other Documents27
▸DOB NOWPlot Diagram6
08/13/2026X00947868-I1Open ↗
08/13/2026X00947868-P5Open ↗
08/13/2026X01176989-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00947868-I1Open ↗
08/13/2026X00947868-P3Open ↗
08/13/2026X00947868-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026X00947868-P2Open ↗
08/13/2026X00947868-S1Open ↗
08/13/2026X00947868-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPD1 Document4
08/13/2026X00947868-P5Open ↗
08/13/2026X00947868-P5Open ↗
08/13/2026X00947868-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026X00947868-I1Open ↗
08/17/2026X00947868-P5Open ↗
08/17/2026X00947868-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
01/08/2025240360523Open ↗
▸BISDHCR DOCUMENT1
01/10/2025240360523Open ↗
▸DOB NOWFinal Survey1
08/17/2026X00947868-I1Open ↗