← Back
BuildNYC
Public elementary, junior or senior high
The Dr. Emmett W. Bassett School
1075 PUGSLEY AVENUE · Castle Hill-Unionport · BIN 2025696
💬 Discuss this project
1939Year Built
3Stories
W1Building Class
R5Zoning
131,196 sfGross Floor Area
2Units
LL97 Covered11 Active Violations 0 unresolved · 11 paperwork only 6 likely answered ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 80,124 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe Dr. Emmett W. Bassett SchoolUnder Construction12p · 1 filing · 20 docs
Floor 3The Dr. Emmett W. Bassett SchoolUnder Construction6p · 1 filing · 20 docs
Floor 2The Dr. Emmett W. Bassett SchoolUnder Construction5p · 1 filing · 20 docs
Floor 1The Dr. Emmett W. Bassett SchoolUnder Construction7p · 1 filing · 20 docs
CellarThe Dr. Emmett W. Bassett SchoolUnder Construction1p · 1 filing · 20 docs
Site & exteriorThe Dr. Emmett W. Bassett School, P.S. 119XUnder Construction26p · 7 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8607/22/2026
NYC Department of Design and Construction403/21/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ame Services607/11/2026
NYC School Construction Authority505/29/2024
Dseny Engineering Services408/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dseny Engineering Services803/21/2026
NYC School Construction Authority503/21/2026
Ame Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Army ConstructionScaffold1606/28/2026
Army ConstructionGeneral Contractor507/22/2026
U & I Mechanicalspecialty_contractor507/11/2026
Temperature SystemsScaffold507/08/2026
Whitestone ConstructionScaffold307/08/2026
Forsythe Plumbing & HeatingPlumbing207/08/2026
High Volt Electric Corp ofElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106106/29/2026
Socotec Engineering4983408/22/2024
Future Tech Consultants O589305/29/2024
Twin Peaks317105/04/2020
Building Lifecycle
All (151)Filed (15)Permit Issued (26)Signed Off (4)Violation (60)Objection (16)Special Inspection (30)
10/19/2026
Signed off — Alteration
X01099636-I1
10/14/2026
Signed off — Alteration
X01099645-I1
09/11/2026
Signed off — Alteration
X01099622-I1
07/20/2026
Permit issued — Support of Excavation
X01422001-I1-SE
07/11/2026
Filed — Alteration
X01099622-P1
07/10/2026
Permit issued — Mechanical Systems
X00955780-S2-MS
07/01/2026
Objection raised — Other
06/29/2026
Filed — Alteration
Installation of excavation shoring in conjunction with X00955780
X01422001-I1
06/23/2026
Permit issued — Sidewalk Shed
X01099636-I1-SH
06/11/2026
Permit issued — Mechanical Systems
X00955780-S2-MS
05/07/2026
Violation issued (ECB, open)
Construction
05/07/2026
Violation issued (ECB, open)
Construction
05/07/2026
Violation issued (ECB, open)
Construction
05/07/2026
Violation issued (ECB, open)
Construction
05/07/2026
Violation issued (ECB, open)
Construction
03/25/2026
Permit issued — Sidewalk Shed
X01099636-I1-SH
02/02/2026
Permit issued — Mechanical Systems
X00955780-S2-MS
12/08/2025
Permit issued — General Construction
X00955780-I1-GC
12/08/2025
Permit issued — Structural
X00955780-I1-ST
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Permit issued — Plumbing
X00955780-S3-PL
09/08/2025
Permit issued — Protection and Mechanical Methods
X01099645-I1-PMM
09/08/2025
Permit issued — Sidewalk Shed
X01099636-I1-SH
09/08/2025
Permit issued — Construction Fence
X01099622-I1-FN
09/08/2025
Permit issued — Supported Scaffold
X01099633-I1-SF
09/04/2025
Violation issued (ECB, open)
Construction
09/04/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Violation issued (ECB, open)
Construction
12/16/2024
Permit issued — Mechanical Systems
X00955780-S2-MS
12/11/2024
Permit issued — Plumbing
X00955780-S3-PL
12/10/2024
Permit issued — Structural
X00955780-I1-ST
12/10/2024
Permit issued — Structural
X00955780-I1-GC
10/29/2024
Signed off — Alteration
SH/PS119X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW# 133545 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00819487-I1
10/08/2024
Violation issued (ECB, closed)
Construction
10/08/2024
Violation issued (ECB, closed)
Construction
10/08/2024
Violation issued (ECB, open)
Construction
10/08/2024
Violation issued (ECB, open)
Construction
09/12/2024
Permit issued — Supported Scaffold
X01099633-I1-SF
09/09/2024
Permit issued — Sidewalk Shed
X01099636-I1-SH
08/30/2024
Permit issued — Construction Fence
X01099622-I1-FN
08/30/2024
Permit issued — Protection and Mechanical Methods
X01099645-I1-PMM
08/22/2024
Filed — Alteration
X01099636-I1
08/22/2024
Filed — Alteration
X01099645-I1
08/22/2024
Filed — Alteration
X01099622-I1
08/22/2024
Filed — Alteration
X01099633-I1
06/17/2024
Permit issued — Sidewalk Shed
X00819487-I1-SH
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
06/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Noel Tolentino
06/03/2024
Special inspection requirement — Fenestration air leakage
Noel Tolentino
06/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Noel Tolentino
05/29/2024
Filed — Alteration
X119- REPLACE PORTIONS OF ROOF & PARAPET. EXTERIOR MASONRY & PARAPET REPAIRS & WATER INFILTRATION , CONCRETE REPAIR.
X00955780-P2
05/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Marchese
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
05/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
05/02/2024
Special inspection requirement — Fenestration air leakage
Michael Marchese
03/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
Noel Tolentino
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/27/2024
Objection resolved — Addressed
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedArmy Construction07/20/2026
DOB NOWMechanical SystemsPermit IssuedU & I Mechanical07/10/2026
DOB NOWSidewalk ShedSigned-offArmy Construction06/23/2026
DOB NOWMechanical SystemsPermit IssuedU & I Mechanical06/11/2026
DOB NOWSidewalk ShedPermit IssuedArmy Construction03/25/2026
DOB NOWMechanical SystemsPermit IssuedU & I Mechanical02/02/2026
DOB NOWGeneral ConstructionPermit IssuedArmy Construction12/08/2025
DOB NOWStructuralPermit IssuedArmy Construction12/08/2025
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating11/12/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedArmy Construction09/08/2025
DOB NOWSidewalk ShedSigned-offArmy Construction09/08/2025
DOB NOWConstruction FenceSigned-offArmy Construction09/08/2025
DOB NOWSupported ScaffoldPermit IssuedArmy Construction09/08/2025
DOB NOWMechanical SystemsPermit IssuedU & I Mechanical12/16/2024
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating12/11/2024
DOB NOWStructuralPermit IssuedArmy Construction12/10/2024
DOB NOWStructuralPermit IssuedArmy Construction12/10/2024
DOB NOWSupported ScaffoldPermit IssuedArmy Construction09/12/2024
DOB NOWSidewalk ShedSigned-offArmy Construction09/09/2024
DOB NOWConstruction FenceSigned-offArmy Construction08/30/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedArmy Construction08/30/2024
DOB NOWSidewalk ShedSigned-offWhitestone Construction06/17/2024
DOB NOWSidewalk ShedSigned-offWhitestone Construction06/14/2023
DOB NOWSupported ScaffoldPermit IssuedTemperature Systems05/02/2022
DOB NOWSupported ScaffoldPermit IssuedTemperature Systems04/30/2021
DOB NOWSupported ScaffoldPermit IssuedTemperature Systems04/22/2021
BISBLISSUEDForsythe P&H06/02/2023
BISPLISSUEDForsythe P&H05/30/2023
BISEQISSUEDTemperature Systems05/25/2023
BISOTISSUEDTemperature Systems05/25/2023
BISOTISSUEDTemperature Systems05/25/2023
BISMHISSUEDTemperature Systems05/25/2023
BISEQISSUEDTemperature Systems05/01/2023
BISOTISSUEDTemperature Systems05/01/2023
BISEQISSUEDRennon Construction04/06/2023
BISEQISSUEDThe Outfit M&J03/29/2023
BISEQISSUEDThe Outfit M&J03/29/2023
BISPLISSUEDDo Rite Mechanical03/29/2023
BISEQISSUEDPMY Construction12/19/2022
BISOTISSUEDThe Outfit M&J11/09/2022
+ 36 more permits on file
1 project · most recent 05/29/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2024Permit IssuedU & I MechanicalVentilation Systems
Ventilation
Greenheck CUBE-300-30 3,700 CFM · Exhaust Fan ×1
1 project · most recent 05/29/2024
Storm
FiledStatusContractorScope
05/29/2024Permit IssuedForsythe Plumbing & HeatingStorm
15 projects · most recent 06/01/2026
General Wiring
FiledStatusContractorScope
06/01/2026Permit IssuedJamcob ElectricGeneral Wiring
07/09/2025Permit IssuedEverest ElectricGeneral Wiring
03/26/2025Permit IssuedHigh Volt Electric Corp ofGeneral Wiring
09/06/2024Permit IssuedHigh Volt Electric Corp of—
01/18/2023Permit IssuedHexagon Construction & Electrical Group—
05/03/2022Permit IssuedStanco System Electrical Cont—
05/04/2021Permit IssuedAdvance Light & PWR ElectricGeneral Wiring
07/17/2020CompleteO.K. Electrical ServiceGeneral Wiring
01/08/2020Permit IssuedA & S ElectricGeneral Wiring
09/03/2019CompleteRNW Electric—
08/12/2019Permit IssuedRNW Electric—
07/12/2019Permit IssuedRNW ElectricGeneral Wiring
06/12/2019Permit IssuedGreen Power Electric—
06/25/2018CompleteLaser Electrical Constr'g—
06/22/2018CompleteLaser Electrical Constr'gGeneral Wiring
2 projects · most recent 06/29/2026
Concrete Masonry
FiledStatusContractorScope
06/29/2026Permit IssuedArmy Construction1 scope_items
05/29/2024Permit IssuedU & I MechanicalConcrete, Masonry
2 projects · most recent 08/01/2023
Scaffold
FiledStatusContractorScope
08/01/2023——Scaffold
05/04/2020Permit IssuedTemperature SystemsScaffold
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/03/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
06/03/2024Fenestration and door U-factor and product ratingsNoel Tolentinoenergy_progress
06/03/2024Fenestration air leakageNoel Tolentinoenergy_progress
06/03/2024Energy Code Compliance InspectionsNoel Tolentinoprogress
05/02/2024Fenestration and door U-factor and product ratingsMichael Marcheseenergy_progress
05/02/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
05/02/2024Energy Code Compliance InspectionsMichael Marcheseprogress
05/02/2024Fenestration air leakageMichael Marcheseenergy_progress
03/29/2024Duct leakage testing, insulation and designNoel Tolentinoenergy_progress
02/15/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
02/15/2024Energy Code Compliance InspectionsNoel Tolentinoprogress
02/15/2024Maintenance informationNoel Tolentinoenergy_progress
02/15/2024Electrical motors and elevatorsNoel Tolentinoenergy_progress
02/15/2024Shutoff dampersNoel Tolentinoenergy_progress
02/15/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
02/15/2024Post-installed AnchorsNoel Tolentinospecial
02/14/2024MasonryNoel Tolentinospecial
02/14/2024Post-installed AnchorsNoel Tolentinospecial
02/14/2024Structural Steel - DetailsNoel Tolentinospecial
02/14/2024Structural Steel - WeldingNoel Tolentinospecial
02/14/2024Subsurface Conditions – Fill Placement & In-Place DensityNoel Tolentinospecial
02/14/2024Energy Code Compliance InspectionsNoel Tolentinoprogress
02/14/2024Insulation placement and R valuesNoel Tolentinoenergy_progress
02/14/2024Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
02/14/2024Concrete - Cast-In-PlaceNoel Tolentinospecial
Latest 25 of 30.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Dr. Emmett W. Bassett SchoolEducationFloors 1–3, Roof
Project X01422001 Alteration · Permit Entire · 06/29/2026
Project X01099622 Alteration · LOC Issued · 08/22/2024
Project X01099636 Alteration · LOC Issued · 08/22/2024
Project X00955780 Alteration · Permit Entire · 02/15/2024
Project X00911895 Alteration · Filing Withdrawn · 08/01/2023
Project X00819487 Alteration · LOC Issued · 02/17/2023
P.S. 119XEducation—
Project X01099633 Alteration · Permit Entire · 08/22/2024
Project X01099645 Alteration · LOC Issued · 08/22/2024
Project X00346440 Alteration · Permit Entire · 05/04/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch15
08/23/2026X00819487-P1Request digital key ↗
08/22/2026X00911895-I1Request digital key ↗
08/21/2026X00955780-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/14/2026X00346440-I1Request digital key ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/23/2026X00819487-I1Open ↗
08/22/2026X00911895-I1Open ↗
08/21/2026X00955780-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026X00955780-P2Open ↗
08/27/2026X00955780-P2Open ↗
08/26/2026X00955780-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026X00955780-S3Open ↗
08/26/2026X00955780-S2Open ↗
08/26/2026X00346440-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
02/22/2024201197935Open ↗
▸Safety & Tenant Protection10
▸DOB NOWNYCSCA - Approved Site Safety Plans10
08/21/2026X01099622-P1Open ↗
08/21/2026X01099622-I1Open ↗
08/13/2026X00819487-P1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs42
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/21/2026X01099622-P1Open ↗
08/15/2026X01422001-I1Open ↗
08/13/2026X00819487-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/23/2026X00819487-P1Open ↗
08/21/2026X01099622-P1Open ↗
08/15/2026X00819487-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026X00955780-I1Open ↗
08/13/2026X00955780-S5Open ↗
08/13/2026X00955780-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026X00955780-I1Open ↗
08/13/2026X00955780-S5Open ↗
08/13/2026X00955780-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDCLA Approval of Artwork2
08/21/2026X01099622-I1Open ↗
08/21/2026X01099622-P1Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/21/2026X01099622-P1Open ↗
08/15/2026X01422001-I1Open ↗
08/13/2026X00819487-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/15/2026X01422001-I1Open ↗