← Back
Over six families without stores
Br Affordable
1077 BOSTON ROAD · BIN 2004187
💬 Discuss this project
1922Year Built
5Stories
C1Building Class
R6Zoning
37,818 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION · 10,630 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof2p · 3 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 15 docs
Basement6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APARTMENT REHABILITATION CORP2807/08/2026
HARRY CONSTRUCTION GROUP607/08/2026
BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION203/22/2026
LEMLE WOLFF CONSTRUCTION803/21/2026
BR AFFORDABLE HOUSING L P103/21/2026
BR AFFORDABLE JV LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC811/25/2025
R.J. MCGEE ENGINEERING, PLLC405/05/2025
SYNERGIC DESIGN ARCHITECTS103/12/2025
ASR ENGINEERING PC107/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2403/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing407/08/2026
STX ELECTRICAL CORPElectrical203/22/2026
HARRY CONSTRUCTION GROUPGeneral Contractor203/21/2026
LEMLE & WOLFF CONSTR CORPGeneral Contractor207/08/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803805/05/2025
SYNERGIC DESIGN LLC8561103/12/2025
Building Lifecycle
All (126)Filed (15)Permit Issued (10)Signed Off (7)Violation (60)Inspection (4)Special Inspection (30)
03/20/2026
Violation issued (HPD, closed)
A
03/20/2026
Violation issued (HPD, closed)
B
03/20/2026
Violation issued (HPD, closed)
A
01/16/2026
Signed off — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2NEW INDIRECT HWHS PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01047910-I1. NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048221-I1
12/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2025
Violation issued (HPD, closed)
C
12/28/2025
Violation issued (HPD, closed)
C
12/20/2025
Permit issued — Plumbing
X01048221-I1-PL
11/25/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2NEW INDIRECT HWHS PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01047910-I1. NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048221-P4
11/24/2025
Signed off — Alteration
1 BOILER REPLACED AT BASEMENT IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01048221-I1, & &SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047910-I1
11/11/2025
Violation issued (HPD, closed)
A
11/11/2025
Violation issued (HPD, closed)
A
11/06/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2NEW INDIRECT HWHS PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01047910-I1. NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048221-P3
11/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/28/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2NEW INDIRECT HWHS PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01047910-I1. NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048221-P2
10/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/23/2025
Signed off — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01080473-I1
10/23/2025
Permit issued — Suspended Scaffold
X01080473-I1-SC
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/08/2025
Signed off — Alteration
Interior renovation work of corridors, cellar, roof replacement, parapet work, and facade work as per plan. Boiler, and water heater replacement under separate filing X01002976-I1 .No change to use, egress, or occupancy under this filing.
X00991310-I1
09/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/10/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2NEW INDIRECT HWHS PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01047910-I1. NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048221-P1
09/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/21/2025
Permit issued — Mechanical Systems
X00991310-I1-GC-CX
06/27/2025
Signed off — Alteration
X01187641-I1
06/25/2025
Violation issued (ECB, closed)
Construction
05/31/2025
Violation issued (HPD, closed)
C
05/31/2025
Violation issued (HPD, closed)
C
05/27/2025
Signed off — Alteration
1 BOILER REPLACED AT BASEMENT IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01048221-I1, & &SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047910-S1
05/19/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/14/2025
Permit issued — Boiler Equipment
X01047910-S1-BE
05/06/2025
Violation issued (HPD, closed)
A
05/05/2025
Filed — Alteration
1 BOILER REPLACED AT BASEMENT IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01048221-I1, & &SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047910-S1
05/05/2025
Filed — Alteration
1 BOILER REPLACED AT BASEMENT IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01048221-I1, & &SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047910-P2
04/20/2025
Violation issued (HPD, closed)
A
04/20/2025
Violation issued (HPD, closed)
B
04/20/2025
Violation issued (HPD, closed)
B
04/20/2025
Violation issued (HPD, closed)
C
04/11/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01078729-I1
04/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
04/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
04/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/31/2025
Violation issued (HPD, closed)
A
03/31/2025
Violation issued (HPD, closed)
A
03/31/2025
Violation issued (HPD, closed)
B
03/27/2025
Permit issued — Solar
X01187641-I1-SL
03/19/2025
Filed — Alteration
1 BOILER REPLACED AT BASEMENT IN CONJUNCTION TO ALT 2 FILINGS X00991310-I1, X01048221-I1, & &SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047910-P1
03/12/2025
Filed — Alteration
X01187641-I1
03/03/2025
Violation issued (HPD, closed)
C
03/03/2025
Violation issued (HPD, closed)
C
02/27/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
02/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
02/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
02/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/21/2025
Violation issued (HPD, closed)
B
02/21/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, closed)
C
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING12/20/2025
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP10/23/2025
DOB NOWMechanical SystemsSigned-offLEMLE WOLFF CONSTR08/21/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING05/14/2025
DOB NOWSolarSigned-offACCORD POWER INC03/27/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING12/09/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING12/09/2024
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP07/22/2024
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/16/2024
DOB NOWMechanical SystemsSigned-offLEMLE WOLFF CONSTR06/24/2024
BISSPISSUEDSKYVIEW HTG&AIR CON CORP02/15/1995
BIS—ISSUEDGREAT AMERICAN CONST. CORP.06/01/1994
BISEQISSUEDGREAT AMERICAN CONST. CORP.09/23/1992
BIS—ISSUEDGREAT AMERICAN CONST. CORP.09/23/1992
4 projects · most recent 03/04/2025
Boiler Controls
FiledStatusContractorScope
03/04/2025CompleteACCORD POWER ELECTRIC LLC—
02/27/2025CompleteSTX ELECTRICAL CORPBoiler Controls
12/11/2024CompleteSTX ELECTRICAL CORP—
07/17/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
11/06/2025Tenant Protection Plan Compliance—special
10/22/2025Tenant Protection Plan Compliance—special
09/09/2025Tenant Protection Plan Compliance—special
04/01/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
04/01/2025Tenant Protection Plan Compliance—special
04/01/2025Heating SystemsSAMI HAJJAR P.Especial
04/01/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
04/01/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/27/2025Heating SystemsSAMI HAJJAR P.Especial
02/27/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/27/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
02/27/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
02/27/2025Tenant Protection Plan Compliance—special
10/28/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
10/28/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/28/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/28/2024Mechanical SystemsSAMI HAJJAR P.Especial
10/28/2024FinalSAMI HAJJAR P.Eprogress
10/28/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/28/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
10/28/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/28/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
10/28/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
10/28/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
10/28/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
Latest 25 of 49.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/21/2026X01047910-P2Request digital key ↗
08/21/2026X01047910-P1Request digital key ↗
08/21/2026X01047910-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026X01047910-P1Open ↗
08/21/2026X01047910-I1Open ↗
08/21/2026X01047910-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026X00991310-P1Open ↗
08/28/2026X00991310-P1Open ↗
08/27/2026X01047910-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026X00991310-P1Open ↗
08/27/2026X01047910-P2Open ↗
08/24/2026X00991310-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/21/2026X01047910-P1Open ↗
08/21/2026X01047910-I1Open ↗
08/21/2026X01047910-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00991310-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X01047910-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01187641-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00991310-P2Open ↗
08/13/2026X00991310-P1Open ↗
08/13/2026X00991310-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01080473-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01080473-I1Open ↗