Walk-up apt, over six families with stores
1079 MANHATTAN AVENUE
BROOKLYN · BIN 3063822
💬 Discuss this project
1931Year Built
4Stories
C7Building Class
R7AZoning
6,000 sfGross Floor Area
13Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 1079 HANCOCK ASSOCIATES LLC · 2,375 sf lot · 2.53 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanical
Roof1p · 1 filing · 4 docs
Floor 17p · 2 filings · 20 docs
Cellar3p · 1 filing · 18 docs
5 jobs · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteDENMAR ELECTRIC CORPGeneral Wiring
03/11/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
12/07/2022CompleteBRONXDALE ELECTRIC INC13 meters, 12 new_meters
09/07/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/29/2019CompleteWILLDAN ELECTRICAL OF NY—
Building Lifecycle
All (131)Filed (19)Permit Issued (9)Signed Off (7)Violation (30)Inspection (16)Objection (20)Special Inspection (30)
03/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2025
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00774037-I1
09/10/2025
Filed — Alteration CO
CONVERT REAR OF THE FIRST FLOOR OF THE BUILDING FROM RESIDENTIAL TO COMMERCIAL AS PER PLANS FILED HEREWITH, CHANGE TO CO REQUESTED.
B00992877-P3
08/27/2025
Special inspection requirement — Lighting controls
CARL HAMANN
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/27/2025
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
08/27/2025
Special inspection requirement — Interior lighting power
CARL HAMANN
07/10/2025
Permit issued — General Construction
B00992877-I1-GC
04/18/2025
Filed — Alteration CO
CONVERT REAR OF THE FIRST FLOOR OF THE BUILDING FROM RESIDENTIAL TO COMMERCIAL AS PER PLANS FILED HEREWITH, CHANGE TO CO REQUESTED.
B00992877-P2
04/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2024
Violation issued (FDNY_ORDER, closed)
12/16/2024
Violation issued (FDNY_ORDER, closed)
12/16/2024
Violation issued (FDNY_ORDER, closed)
12/16/2024
Violation issued (FDNY_ORDER, closed)
12/16/2024
Violation issued (FDNY_ORDER, closed)
12/16/2024
Violation issued (FDNY_ORDER, closed)
12/16/2024
Violation issued (FDNY_ORDER, closed)
09/23/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/26/2024
Permit issued — General Construction
B00992877-I1-GC
07/15/2024
Objection resolved — Addressed
06/25/2024
Objection raised — Scope
06/19/2024
Objection resolved — Addressed
06/18/2024
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08049519-I1
06/18/2024
Objection raised — Scope
06/13/2024
Objection resolved — Addressed
06/10/2024
Objection raised — Scope
06/03/2024
Objection resolved — Addressed
05/21/2024
Objection raised — Accessibility
05/21/2024
Objection raised — Accessibility
05/21/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
04/30/2024
Objection raised — Scope
04/23/2024
Filed — Alteration CO
CONVERT REAR OF THE FIRST FLOOR OF THE BUILDING FROM RESIDENTIAL TO COMMERCIAL AS PER PLANS FILED HEREWITH, CHANGE TO CO REQUESTED.
B00992877-I1
10/10/2023
Signed off — Alteration
RENOVATION OF APARTMENT 9TH ON 4TH FLOOR IN MULTIPLE DWELLING, MIXED USE BUILDING, CHANGE TO THE FLOOR LAYOUTS AND OTHER WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08049518-I1
06/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2023
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00774037-P2
03/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2023
Permit issued — Plumbing
B08049519-I1-PL
02/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
02/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
02/22/2023
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
02/22/2023
Special inspection requirement — Maintenance information
CARL HAMANN
02/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
02/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
02/15/2023
Violation issued (FDNY_NOV, closed)
12/22/2022
Permit issued — Mechanical Systems
B08049518-I1-GC-CX
12/16/2022
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08049519-I1
12/15/2022
Filed — Alteration
RENOVATION OF APARTMENT 9TH ON 4TH FLOOR IN MULTIPLE DWELLING, MIXED USE BUILDING, CHANGE TO THE FLOOR LAYOUTS AND OTHER WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08049518-I1
12/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
12/05/2022
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
09/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2022
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00774037-P1
08/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
08/24/2022
Special inspection requirement — Maintenance information
CARL HAMANN
Latest 60 of 131 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HANCOCK ASSOCIATES5607/08/2026
1079 HANCOCK ASSOCIATES503/22/2026
PL CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC809/10/2025
EAB ENGINEERING PC1003/17/2022
ASHRAF CORP108/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERIOR FIRE CONTROL103/21/2026
BIG ORANGE EXPEDITING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H&T DESIGNS CORPGeneral Contractor607/08/2026
WIESLAW MAKSIMElectrical203/21/2026
SUPERB PLUMBING & HEATINGPlumbing207/08/2026
MAX CONSTRUCTION USA CORPGeneral Contractor207/08/2026
DONE RIGHT KITCHEN EXHAUSGeneral Contractor107/08/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor103/22/2026
CARL HAMANNElectrical103/21/2026
TOMCHRIS CONTRACTING CORPGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
BIG ORANGE SAFETY FIRSTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949809/10/2025
EAB ENGINEERING, PC2048603/17/2022
ASHRAF CORPORATION1973108/24/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTOMCHRIS CONTRACTING CORP07/10/2025
DOB NOWGeneral ConstructionPermit IssuedH&T DESIGNS CORP08/26/2024
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING02/27/2023
DOB NOWMechanical SystemsSigned-offBIG ORANGE SAFETY FIRST12/22/2022
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING07/28/2022
DOB NOWMechanical SystemsSigned-offMAX CONSTRUCTION USA CORP12/17/2021
DOB NOWMechanical SystemsSigned-offDONE RIGHT KITCHEN EXHAUS12/13/2021
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/25/2021
DOB NOWGeneral ConstructionSigned-offMAX CONSTRUCTION USA CORP10/14/2021
BISOTISSUEDINTRAKO INC04/25/2016
BISPLISSUEDPRACTICAL PLBG & HTG INC03/18/2016
BISOTISSUEDTSA CONSTRUCTION LLC11/06/2015
BISPLISSUEDPRACTICAL PLBG & HTG INC03/23/2012
BISOTISSUEDTSA CONSTRUCTION LLC03/05/2012
BISPLISSUEDPRACTICAL PLBG & HTG INC02/27/2012
BISPLISSUEDERAX PLUMBING, INC05/11/2011
BISOTISSUEDTSA CONSTRUCTION LLC05/03/2011
BISBLISSUEDA.M.N. CORPORATION01/04/2006
BISPLISSUEDA.M.N. CORPORATION01/04/2006
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
03/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/11/2022Fail-Final General Construction Non-Directive 14FailView ↗
12/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
08/27/2025Lighting controlsCARL HAMANNenergy_progress
08/27/2025Tenant Protection Plan Compliance—special
08/27/2025Energy Code Compliance InspectionsCARL HAMANNprogress
08/27/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
08/27/2025Interior lighting powerCARL HAMANNenergy_progress
02/22/2023HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
02/22/2023Fire-Resistant Penetrations and JointsCARL HAMANNspecial
02/22/2023Energy Code Compliance InspectionsCARL HAMANNprogress
02/22/2023Maintenance informationCARL HAMANNenergy_progress
02/22/2023HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
02/22/2023HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
12/14/2022Fire-Resistant Penetrations and JointsCARL HAMANNspecial
12/05/2022Tenant Protection Plan ComplianceCARL HAMANNspecial
08/24/2022HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
08/24/2022Maintenance informationCARL HAMANNenergy_progress
08/24/2022Fire-Resistant Penetrations and JointsCARL HAMANNspecial
08/24/2022HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
08/24/2022Energy Code Compliance InspectionsCARL HAMANNprogress
08/24/2022HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
04/01/2022HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
04/01/2022HVAC-R and service water heating system controlsIraj Issapourenergy_progress
04/01/2022HVAC-R and service water heating equipmentIraj Issapourenergy_progress
04/01/2022Mechanical SystemsIraj Issapourspecial
04/01/2022FinalIraj Issapourprogress
04/01/2022Maintenance informationIraj Issapourenergy_progress
Latest 25 of 51.
▾Documents — 189 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/01/2026B00561361-I1Request digital key ↗
09/01/2026B00561361-P4Request digital key ↗
09/01/2026B00561361-P3Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION14
09/03/2025302026554Open ↗
07/24/2025302026554Open ↗
06/25/2025302026554Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION9
09/08/2023302026554Open ↗
04/25/2016321260577Open ↗
03/21/2016321260577Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
02/22/2017321260577Open ↗
06/15/2016321260577Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00992877-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature33
09/06/2026B00992877-P3Open ↗
09/06/2026B00992877-P3Open ↗
09/06/2026B00992877-P3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026B00561361-P1Open ↗
09/01/2026B00561361-P3Open ↗
09/01/2026B00561361-P4Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/22/2017321260577Open ↗
06/15/2016321260577Open ↗
10/29/2015321260577Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/06/2026B00992877-P3Open ↗
09/01/2026B08049519-I1Open ↗
08/31/2026B00774037-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/29/2015321260577Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/29/2015321260577Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE5
08/31/2012320439502Open ↗
05/24/2012320439502Open ↗
03/19/2012320297424Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/31/2023302026554Open ↗
02/27/2012320439502Open ↗
04/21/2011320297424Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/29/2015321260577Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/20/2026B00992877-P2Open ↗
08/20/2026B00992877-P3Open ↗
08/15/2026B00992877-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00992877-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/01/2026B00561361-P1Open ↗
09/01/2026B00561361-P4Open ↗
09/01/2026B00561361-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
02/27/2012320439502Open ↗
04/21/2011320297424Open ↗
04/21/2011320297424Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/29/2015321260577Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/22/2017321260577Open ↗
06/15/2016321260577Open ↗
10/29/2015321260577Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/22/2017321260577Open ↗
06/15/2016321260577Open ↗
12/04/2012320439502Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00561339-I1Open ↗
08/31/2026B00581351-I1Open ↗
08/13/2026B00561361-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
02/27/2012320439502Open ↗
04/21/2011320297424Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/29/2026B00774037-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/18/2025302026554Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/11/2025302026554Open ↗
09/10/2025302026554Open ↗
02/22/2017321260577Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
02/27/2012320439502Open ↗
04/21/2011320297424Open ↗
▸BISSUPERSEDING LETTER1
03/09/2012320297424Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
02/22/2017321260577Open ↗
06/15/2016321260577Open ↗
10/29/2015321260577Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/18/2025302026554Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
10/29/2015321260577Open ↗
02/27/2012320439502Open ↗
04/21/2011320297424Open ↗
▸BISADDITIONAL INFORMATION1
06/25/2011320297424Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/20/2026B00992877-P2Open ↗
08/20/2026B00992877-P3Open ↗
08/15/2026B00992877-I1Open ↗
▸BISDHCR DOCUMENT1
09/11/2025302026554Open ↗
▸BIS* SMOKE TEST 27-8681
08/18/2025302026554Open ↗
▸BIS* FIRE STOPS 27-3451
08/18/2025302026554Open ↗