← Back
BuildNYC
Two family frame
108-06 OTIS AVENUE
QUEENS · Corona · BIN 4048289
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5Zoning
1,728 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald Villano Architect102/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mab Consulting Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mksskr Consulting ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369102/06/2023
Building Lifecycle
02/22/2023
Signed off — Alteration
INSTALLATION OF METAL CONVENIENCE STAIR FROM SECOND FLOOR TO PAVEMENT AT REAR YARD. NO CHANGE ON USE, EGRESS OR OCCUPANCY. NO SEPARATE APPLICATIONS TO BE FILED WITH THIS APPLICATION
Q08054573-I1
02/10/2023
Permit issued — General Construction
Q08054573-I1-GC
02/06/2023
Filed — Alteration
INSTALLATION OF METAL CONVENIENCE STAIR FROM SECOND FLOOR TO PAVEMENT AT REAR YARD. NO CHANGE ON USE, EGRESS OR OCCUPANCY. NO SEPARATE APPLICATIONS TO BE FILED WITH THIS APPLICATION
Q08054573-I1
02/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
02/06/2023
Special inspection requirement — Post-installed Anchors
Luis Pichardo
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMksskr Consulting Service02/10/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/06/2023Structural Stability – Alterations of existing buildingsLuis Pichardospecial
02/06/2023Post-installed AnchorsLuis Pichardospecial
02/03/2023FinalRONALD VILLANOprogress
12/14/2022Lighting controlsRONALD VILLANOenergy_progress
12/14/2022Interior lighting powerRONALD VILLANOenergy_progress
12/14/2022Interior lighting powerRONALD VILLANOenergy_progress
12/14/2022Lighting controlsRONALD VILLANOenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account