← Back
Two stories - detached, small or mid-size
108-07 103 AVENUE
QUEENS · South Richmond Hill · BIN 4198651
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4-1Zoning
1,056 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,300 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC102/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036102/05/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
02/17/2026
Permit issued — Solar
Q01353940-I1-SL
02/05/2026
Filed — Alteration
Q01353940-I1
01/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
01/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
01/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
01/31/2026
Special inspection requirement — Final
Ayracon Almaraz
01/31/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
06/19/2008
Violation issued (ECB, open)
Unknown
06/09/2008
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC02/17/2026
1 project · most recent 03/21/2026
FiledStatusContractorScope
03/21/2026Permit IssuedREDLINE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/31/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
01/31/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
01/31/2026Energy Code Compliance InspectionsAyracon Almarazprogress
01/31/2026FinalAyracon Almarazprogress
01/31/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01353940-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q01353940-I1Open ↗
08/28/2026Q01353940-I1Open ↗
08/28/2026Q01353940-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01353940-I1Open ↗
08/28/2026Q01353940-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01353940-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01353940-I1Open ↗