Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only▸
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/26/2008V-DOB VIOLATION - ACTIVE
ECB06/12/2026ATOI OBSERVED ONGOING FACADE REPLACEMENT WORK ON 2-STORY MIXED-USE BUILDING. ERECTED SCAFFOLD LACKED ADEQUATE PLANKING, GUARDRAILS, AND OVERHEAD PROTECTION FOR PEDESTRIANS & BUILDING OCCUPANTS, CREATING UNSAFEHearing held — result not yet published$1K proposed
Primarily 1 family with 1 store or office · 1,879 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.