← Back
Miscellaneous two family
108 2 STREET
BROOKLYN · BIN 3007890
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
2,130 sfGross Floor Area
2Units
0 Open Violations
Miscellaneous two family · 2,000 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/25/2017$3.2M—Private party → Private party$1,526/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAPA ARCHITECTURE PC907/18/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RYSZARD & SON CONSTRUCTIOGeneral Contractor507/08/2026
WATERMARK PLUMBING CORPPlumbing407/08/2026
WATERMARK PLUMBINGGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTOPHER V. PAPA ARCHI1663207/18/2022
Building Lifecycle
All (29)Filed (9)Permit Issued (3)Signed Off (3)Violation (4)Inspection (4)Special Inspection (6)
08/05/2022
Signed off — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-I1
07/21/2022
Signed off — Alteration
B00409252-I1
07/21/2022
Permit issued — Mechanical Systems
B00409252-I1-MS
07/19/2022
Special inspection requirement — Mechanical Systems
Christopher Papa
07/19/2022
Special inspection requirement — Final
Christopher Papa
07/19/2022
Special inspection requirement — HVAC and service water heating equipment
Christopher Papa
07/18/2022
Filed — Alteration
B00409252-P1
07/18/2022
Special inspection requirement — Mechanical Systems
Christopher Papa
07/18/2022
Special inspection requirement — Final
Christopher Papa
07/18/2022
Special inspection requirement — HVAC and service water heating equipment
Christopher Papa
06/07/2022
Filed — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-P5
05/09/2022
Signed off — Alteration
B00523346-I1
04/28/2022
Filed — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-P4
04/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2022
Filed — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-P3
03/14/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/04/2022
Violation issued (ECB, closed)
Unknown
02/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2022
Violation issued (ECB, closed)
Construction
01/28/2022
Violation issued (ECB, closed)
Construction
01/27/2022
Filed — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-P2
12/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/04/2021
Filed — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-P1
08/05/2021
Permit issued — Plumbing
B00409018-I1-PL
06/22/2021
Permit issued — Construction Fence
B00523346-I1-FN
05/17/2021
Filed — Alteration
B00523346-I1
11/12/2020
Filed — Alteration
INSTALLATION OF NEW 3/4 BATH, SLOP SINK, WASHER AND DRYER, HIGH-EFFICIENCY BOILER AND HOT WATER HEATER, AND STORM DRAINAGE AT CELLAR LEVEL. RENOVATION OF EXISTING MASTER BATH AT BASEMENT LEVEL.
B00409018-I1
11/12/2020
Filed — Alteration
B00409252-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRYSZARD & SON CONSTRUCTIO07/21/2022
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP08/05/2021
DOB NOWConstruction FenceSigned-offRYSZARD & SON CONSTRUCTIO06/22/2021
BISOTISSUEDRYSZARD & SON CONSTRUCTIO06/18/2021
BISPLISSUEDDONATO, INC08/21/2015
BISOTISSUEDFC & PC CONSTRUCTION CORP07/15/2015
1 project · most recent 01/13/2022
General Wiring
FiledStatusContractorScope
01/13/2022CompleteDENMAR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/07/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/19/2022Mechanical SystemsChristopher Papaspecial
07/19/2022FinalChristopher Papaprogress
07/19/2022HVAC and service water heating equipment Christopher Papaenergy_progress
07/18/2022Mechanical SystemsChristopher Papaspecial
07/18/2022FinalChristopher Papaprogress
07/18/2022HVAC and service water heating equipment Christopher Papaenergy_progress
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing6
08/30/2026B00409018-P1Request digital key ↗
08/30/2026B00409018-P4Request digital key ↗
08/30/2026B00409018-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/29/2026B00409252-I1Request digital key ↗
08/29/2026B00409252-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/01/2026B00523346-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION5
06/08/2022340776798Open ↗
05/18/2022340776798Open ↗
10/13/2021340776798Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
06/18/2021340776798Open ↗
08/21/2015340279497Open ↗
07/14/2015340279497Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/16/2021340776798Open ↗
03/16/2021340776798Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/22/2022340776798Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
03/16/2021340776798Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00523346-I1Open ↗
08/30/2026B00409018-P3Open ↗
08/30/2026B00409018-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B00409252-P1Open ↗
08/28/2026B00409252-I1Open ↗
08/28/2026B00409252-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B00409252-P1Open ↗
08/28/2026B00409252-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/14/2015340279497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/14/2015340279497Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/10/2017340279497Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/14/2015340279497Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
07/14/2015340279497Open ↗
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan8
08/30/2026B00409018-P1Open ↗
08/30/2026B00409018-P3Open ↗
08/30/2026B00409018-P2Open ↗
Showing 3 of 8 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/08/2021340776798Open ↗
▸BISSTREET TREE CHECKLIST1
03/16/2021340776798Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/16/2021340776798Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/30/2026B00409018-P1Open ↗
08/30/2026B00409018-I1Open ↗
08/30/2026B00409018-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/16/2021340776798Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/23/2022340776798Open ↗
04/08/2021340776798Open ↗
03/16/2021340776798Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/10/2017340279497Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/23/2022340776798Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/10/2017340279497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/14/2015340279497Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/28/2022340776798Open ↗
06/23/2022340776798Open ↗
04/08/2021340776798Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/16/2021340776798Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/22/2022340776798Open ↗
07/10/2017340279497Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
03/16/2021340776798Open ↗
07/14/2015340279497Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/30/2022340776798Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
06/17/2022340776798Open ↗
05/24/2022340776798Open ↗
10/29/2021340776798Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/14/2015340279497Open ↗