ECB04/12/2022Work without permit. Noted; at rear of building at 2ND floor level created wood frame deck and combustible wood frame overhead canopy attached to facade. 100% of work completed., obtain permit$500 due
HPD04/14/2010SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/08/2019Violation issued for failure to file annual boiler 2017 inspection reportThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB04/06/2018Violation issued for failure to file annual boiler 2016 inspection reportThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
Predominantly retail with other uses · Owner of record: Bhatia Trust, Dated February 05 · 1,450 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.