ECB03/18/2009FAILURE TO MAINTAIN. NOTED: DEBRIS PILING UP IN FRONT OF BLDG. APPROX 4'H. WOODS AND BAGS CREATE FIRE HAZARD. REMEDY: REMOVE DEBRIS.Nothing owed — awaiting certificate of correction
Two family frame · 0.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.