← Back
Two family frame
108-27 171 PLACE
QUEENS · South Jamaica · BIN 4218597
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
2,040 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,500 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 216p · 1 filing · 20 docs
Floor 118p · 2 filings · 20 docs
Cellar20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
108 ST REAKTY1707/08/2026
108 ST.REAKTY LLC1603/22/2026
108TH STREET REALTY303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2025$1.2M—108TH STREET REALTY, LLC → Private party$600/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC809/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor2207/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519709/16/2024
Building Lifecycle
All (70)Filed (8)Permit Issued (9)Signed Off (2)Violation (3)Inspection (8)Objection (10)Special Inspection (30)
03/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2025
Signed off — Alteration
Proposing new plumbing fixtures, this plumbing application is in conjunction with NB application #Q00785760-I1
Q08008473-I1
02/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/24/2025
Signed off — Alteration
8' FEET HIGH CONSTRUCTION TEMPORARY FENCE
Q08008384-I1
12/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2024
Special inspection requirement — Metering
Younes Abouyaala
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/25/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/25/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/20/2024
Permit issued — Structural
Q00785760-I1-ST
09/17/2024
Permit issued — Mechanical Systems
Q00785760-I1-FO
09/17/2024
Permit issued — Foundation
Q00785760-I1-MS
09/17/2024
Permit issued — General Construction
Q00785760-I1-EA
09/16/2024
Filed — Alteration
Proposing new plumbing fixtures, this plumbing application is in conjunction with NB application #Q00785760-I1
Q08008473-P3
09/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/16/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
09/16/2024
Special inspection requirement — Metering
Younes Abouyaala
09/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/16/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/23/2024
Permit issued — Foundation
Q00785760-I1-GC
07/17/2024
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
07/17/2024
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
07/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
07/17/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/17/2024
Special inspection requirement — Final
NAVEEN KUMAR
07/17/2024
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/17/2024
Special inspection requirement — Masonry
Younes Abouyaala
07/17/2024
Special inspection requirement — Heating Systems
Younes Abouyaala
07/17/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
07/17/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/17/2024
Special inspection requirement — Footing and Foundation
Younes Abouyaala
07/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/11/2024
Filed — Alteration CO
Converting existing one-family building to two-family building, vertical and horizontal extensions, and interior renovation.
Q00785760-P9
06/11/2024
Filed — Alteration
Proposing new plumbing fixtures, this plumbing application is in conjunction with NB application #Q00785760-I1
Q08008473-P2
03/11/2024
Permit issued — Construction Fence
Q08008384-I1-FN
03/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2024
Permit issued — Plumbing
Q08008473-I1-PL
08/15/2023
Filed — Alteration CO
Converting existing one-family building to two-family building, vertical and horizontal extensions, and interior renovation.
Q00785760-P3
06/03/2023
Permit issued — Foundation
Q00785760-I1-GC
05/08/2023
Objection resolved — Addressed
05/06/2023
Objection raised — Energy
04/28/2023
Objection resolved — Addressed
04/27/2023
Objection raised — Zoning
04/20/2023
Filed — Alteration CO
Converting existing one-family building to two-family building, vertical and horizontal extensions, and interior renovation.
Q00785760-P1
04/06/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2023
Violation issued (ECB, closed)
Construction
04/04/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offYAFE MEOD CORP09/20/2024
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP09/17/2024
DOB NOWFoundationSigned-offYAFE MEOD CORP09/17/2024
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP09/17/2024
DOB NOWFoundationPermit IssuedYAFE MEOD CORP07/23/2024
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP03/11/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/25/2024
DOB NOWFoundationPermit IssuedYAFE MEOD CORP06/03/2023
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP02/28/2023
1 project · most recent 06/11/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/11/2024Signed-offYAFE MEOD CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GSX160421 42,000 BTU · Condensing Unit ×4
Heating
Goodman GM9C960603BN 60,000 BTU · Furnace ×4
Ventilation
Honeywell VNT5200E1000/U 200 CFM · Erv ×6
1 project · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 06/11/2024
Masonry Wood
FiledStatusContractorScope
06/11/2024Signed-offYAFE MEOD CORPMasonry, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
09/25/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/25/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/25/2024Maintenance informationYounes Abouyaalaenergy_progress
09/25/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/25/2024Permanent certificateYounes Abouyaalaenergy_progress
09/25/2024MeteringYounes Abouyaalaenergy_progress
09/25/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/25/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/16/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/16/2024MeteringYounes Abouyaalaenergy_progress
09/16/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/16/2024Maintenance informationYounes Abouyaalaenergy_progress
09/16/2024Permanent certificateYounes Abouyaalaenergy_progress
09/16/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/17/2024MeteringYounes Abouyaalaenergy_progress
07/17/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/17/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/17/2024FinalNAVEEN KUMARprogress
07/17/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/17/2024Structural Wood FrameYounes Abouyaalaprogress
07/17/2024Footing and FoundationYounes Abouyaalaprogress
07/17/2024Subgrade InspectionsYounes Abouyaalaspecial
07/17/2024Mechanical SystemsYounes Abouyaalaspecial
07/17/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/17/2024Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
Latest 25 of 90.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q08008473-P2Request digital key ↗
08/25/2026Q08008473-P3Request digital key ↗
08/25/2026Q08008384-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/30/2022421811365Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00785760-I1Open ↗
08/13/2026Q00785760-P1Open ↗
08/13/2026Q00785760-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/16/2022421811365Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00785760-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026Q08008473-P2Open ↗
08/30/2026Q00785760-I1Open ↗
08/30/2026Q00785760-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q08008473-P2Open ↗
08/30/2026Q00785760-I1Open ↗
08/30/2026Q00785760-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026Q08008473-I1Open ↗
08/25/2026Q08008473-P2Open ↗
08/25/2026Q08008473-P3Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/16/2022421811365Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/22/2026Q00785760-P9Open ↗
08/22/2026Q00785760-P3Open ↗
08/22/2026Q00785760-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q08008473-P2Open ↗
08/25/2026Q08008473-P3Open ↗
08/22/2026Q00785760-P9Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026Q00785760-P9Open ↗
08/13/2026Q00785760-P1Open ↗
08/13/2026Q00785760-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00785760-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
09/30/2022421811365Open ↗
▸BISEFILING COVER SHEET1
09/30/2022421811365Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/13/2026Q00785760-I1Open ↗
08/13/2026Q00785760-P1Open ↗
08/13/2026Q00785760-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00785760-P1Open ↗
08/13/2026Q00785760-P9Open ↗
08/13/2026Q00785760-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00785760-I1Open ↗
08/13/2026Q00785760-P1Open ↗
08/13/2026Q00785760-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/22/2026Q00785760-P9Open ↗
08/22/2026Q00785760-P3Open ↗
08/22/2026Q00785760-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00785760-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00785760-I1Open ↗