← Back
Large suburban residence
108-28 67 DRIVE
QUEENS · Forest Hills · BIN 4051908
💬 Discuss this project
1935Year Built
2.5Stories
A3Building Class
R1-2AZoning
1,811 sfGross Floor Area
1Units
Large suburban residence · 5,000 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR206/04/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281206/04/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/12/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 16 Panels, 6.56 kW
Q01049046-I1
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/05/2025
Special inspection requirement — Final
Mina Makar
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/05/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
06/04/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 16 Panels, 6.56 kW
Q01049046-P1
06/24/2024
Permit issued — Solar
Q01049046-I1-SL
06/14/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 16 Panels, 6.56 kW
Q01049046-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR06/24/2024
1 project · most recent 06/14/2024
FiledStatusContractorScope
06/14/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/05/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
06/05/2025Fire-Resistant Penetrations and JointsMina Makarspecial
06/05/2025FinalMina Makarprogress
06/05/2025Energy Code Compliance InspectionsMina Makarprogress
06/05/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026Q01049046-P1Request digital key ↗
08/22/2026Q01049046-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026Q01049046-I1Open ↗
08/22/2026Q01049046-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01049046-I1Open ↗
08/25/2026Q01049046-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01049046-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026Q01049046-I1Open ↗
08/22/2026Q01049046-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01049046-I1Open ↗