← Back
Two stories - detached, small or mid-size
108-38 69 AVENUE
QUEENS · BIN 4052275
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R1-2AZoning
3,432 sfGross Floor Area
1Units
1 Open Violation ▸
Two stories - detached, small or mid-size · Owner of record: 108-38 69TH AVE LLC · 6,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2023$2.3M—Private party → 108-38 69TH AVE LLC$670/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC108/06/2025
AMINOV DESIGN ENGINEER, PC511/15/2024
RAS PE CONSULTING ENGINEERS312/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS1603/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SB RENOVATION & MODELINGGeneral Contractor807/08/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244108/06/2025
DOYUN KIM; RA7415211/15/2024
WORLD DESIGN ARCHITECTURE9323412/19/2023
Building Lifecycle
All (84)Filed (9)Permit Issued (8)Signed Off (6)Inspection (7)Objection (24)Special Inspection (30)
08/06/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01261784-I1
03/06/2025
Signed off — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-S4
01/07/2025
Permit issued — Plumbing
Q00901485-S4-PL
01/06/2025
Signed off — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-S2
01/03/2025
Signed off — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-I1
12/02/2024
Signed off — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-S5
12/02/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
11/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
11/20/2024
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
11/20/2024
Special inspection requirement — Fenestration areas
William Alicea
11/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
11/20/2024
Special inspection requirement — Air barrier - visual inspection
William Alicea
11/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
11/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
11/20/2024
Special inspection requirement — Interior lighting power
William Alicea
11/20/2024
Special inspection requirement — Fenestration air leakage
William Alicea
11/20/2024
Special inspection requirement — Insulation placement and R values
William Alicea
11/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
11/15/2024
Filed — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-P2
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
11/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
11/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
11/15/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
11/15/2024
Special inspection requirement — Fenestration air leakage
DOYUN KIM
11/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
11/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
11/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
11/15/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
11/15/2024
Special inspection requirement — Air barrier - visual inspection
DOYUN KIM
11/15/2024
Special inspection requirement — Insulation placement and R values
DOYUN KIM
11/12/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/06/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/23/2024
Permit issued — General Construction
Q00901485-I1-GC
10/22/2024
Filed — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-P1
09/03/2024
Signed off — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-S1
08/29/2024
Signed off — Alteration
Excavation work for proposed renovation of an existing one family dwelling. No change in bulk, egress or occupancy under this application.
Q00901485-S3
08/09/2024
Permit issued — Support of Excavation
Q00901485-S1-SE
08/08/2024
Permit issued — Earth Work
Q00901485-S2-FO-EA
08/07/2024
Permit issued — Structural
Q00901485-S3-ST
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
02/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2024
Objection raised — Structural
12/26/2023
Objection raised — Other
12/26/2023
Objection raised — Structural
12/26/2023
Objection raised — Admin
12/26/2023
Objection raised — Other
12/26/2023
Objection raised — Structural
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC01/07/2025
DOB NOWGeneral ConstructionSigned-offSB RENOVATION & MODELING10/23/2024
DOB NOWSupport of ExcavationSigned-offSB RENOVATION & MODELING08/09/2024
DOB NOWEarth WorkSigned-offSB RENOVATION & MODELING08/08/2024
DOB NOWStructuralSigned-offSB RENOVATION & MODELING08/07/2024
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC12/14/2023
DOB NOWGeneral ConstructionSigned-offSB RENOVATION & MODELING09/21/2023
DOB NOWConstruction FenceSigned-offSB RENOVATION & MODELING09/21/2023
2 projects · most recent 07/25/2025
General Wiring
FiledStatusContractorScope
07/25/2025CompleteGREEN LIGHT ELECL & MECH—
10/30/2023CompleteWCK ELECTRIC CORP.General Wiring
1 project · most recent 08/06/2025
FiledStatusContractorScope
08/06/2025——36 panels, 15.84 kw, 7,116 roof_area_sqft
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/02/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/12/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/06/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
11/20/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
11/20/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/20/2024Energy Code Compliance InspectionsWilliam Aliceaprogress
11/20/2024Fenestration areasWilliam Aliceaenergy_progress
11/20/2024HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
11/20/2024Air barrier - visual inspectionWilliam Aliceaenergy_progress
11/20/2024HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
11/20/2024Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
11/20/2024Interior lighting powerWilliam Aliceaenergy_progress
11/20/2024Fenestration air leakageWilliam Aliceaenergy_progress
11/20/2024Insulation placement and R valuesWilliam Aliceaenergy_progress
11/20/2024HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
11/15/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
11/15/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
11/15/2024Energy Code Compliance InspectionsDOYUN KIMprogress
11/15/2024HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
11/15/2024Interior lighting powerDOYUN KIMenergy_progress
11/15/2024Fenestration air leakageDOYUN KIMenergy_progress
11/15/2024HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
11/15/2024Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
11/15/2024HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
11/15/2024Fenestration areasDOYUN KIMenergy_progress
11/15/2024Air barrier - visual inspectionDOYUN KIMenergy_progress
11/15/2024Insulation placement and R valuesDOYUN KIMenergy_progress
12/19/2023Subgrade InspectionsWilliam Aliceaspecial
Latest 25 of 36.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026Q00901485-S1Request digital key ↗
08/21/2026Q00901485-P2Request digital key ↗
08/21/2026Q00901485-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q00901485-S4Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026Q01261784-I1Open ↗
08/13/2026Q00901485-P1Open ↗
08/13/2026Q00901485-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00901485-S3Open ↗
08/27/2026Q00901485-P2Open ↗
08/27/2026Q00901485-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00901485-S3Open ↗
08/27/2026Q00901485-P2Open ↗
08/26/2026Q00901485-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026Q01261784-I1Open ↗
08/13/2026Q00901485-P2Open ↗
08/13/2026Q00901485-S2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00901485-S1Open ↗
08/13/2026Q00901485-S2Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q00901485-S2Open ↗
08/13/2026Q00901485-S1Open ↗
▸Other Documents2
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00901485-S2Open ↗
08/13/2026Q00901485-S1Open ↗