โ† Back
BuildNYC
QUEENS
Apex Place Campus
108-40 HORACE HARDING EXPRESSWAY ยท Forest Hills ยท BIN 4618620
๐Ÿ’ฌ Discuss this project
โ€”Year Built
โ€”Stories
โ€”Building Class
โ€”Zoning
โ€”Gross Floor Area
โ€”Units
0 Active Violations
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 51 filing
Floor 42 filings
Floor 32 filings
Floor 22 filings
Floor 12 filings
Site & exterior3 filings
โ–พOwner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Forest Hills Mha Housing Dvlpmt1203/21/2026
Phipps Houses Services607/08/2026
New York City Housing Authority303/21/2026
โ–พDesign Consultants (Architect / Engineer of Record)
โ–พFiling Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
JM Zoning203/21/2026
Louis Striar203/21/2026
โ–พContractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold903/21/2026
Monadnock ConstructionScaffold507/08/2026
Interboro Sign & Electrical MaiSign hanger107/08/2026
Building Lifecycle
08/15/2025
Elevator Category 1 inspection report filed
08/15/2025
Elevator Category 5 inspection report filed
06/29/2023
Closed: Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation ยท closed on the city's record
05/03/2023
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation ยท closed ยท Issued 2023; DOB's record still lists it as active
11/03/2021
Signed off โ€” Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #420663829
Q00173784-I1
33 history events on file for this building. Sign in free to see the full history. Sign in ยท Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWโ€”Interboro Sign & Electrical Maiโ€”
DOB NOWโ€”Core Scaffold Systemsโ€”
DOB NOWโ€”Monadnock Constructionโ€”
DOB NOWโ€”Monadnock Constructionโ€”
DOB NOWโ€”Core Scaffold Systemsโ€”
DOB NOWโ€”Core Scaffold Systemsโ€”
DOB NOWโ€”Monadnock Constructionโ€”
DOB NOWโ€”Monadnock Constructionโ€”
BISโ€”Monadnock Constructionโ€”
BISโ€”Core Scaffold Systemsโ€”
BISโ€”Monadnock Constructionโ€”
BISโ€”HDK Constructionโ€”
BISโ€”Bright Power Installationโ€”
BISโ€”Neptune Mechanicalโ€”
BISโ€”Neptune Mechanicalโ€”
BISโ€”Monadnock Constructionโ€”
BISโ€”Monadnock Constructionโ€”
BISโ€”Monadnock Constructionโ€”
BISโ€”Neptune Mechanicalโ€”
BISโ€”Monadnock Constructionโ€”
Nothing on file for this building.
Nothing on file for this building.
270 filed documents on file for this building. Sign in free to see the full history. Sign in ยท Create account