108-43 48 AVENUE
QUEENS · BIN 4049496
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R5Zoning
3,230 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations ▸
Three families · Owner of record: YZ REAL PROPERTY LLC · 2,917 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
MechanicalFire Protection
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar2p · 2 filings · 20 docs
1 job · most recent 10/12/2020
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/12/2020——Heating Systems
Heating
A.O. Smith PROLINE 400 30 BTU ×4
Burnham KIN 3LN1-LE2 38 BTU ×3
202EN-TO 32 BTU ×1
1 job · most recent 07/31/2023
General Wiring
FiledStatusContractorScope
07/31/2023CompleteRONEY ELECTRIC INCGeneral Wiring
Building Lifecycle
All (87)Filed (11)Permit Issued (7)Signed Off (4)Violation (19)Inspection (6)Objection (10)Special Inspection (30)
05/11/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
B
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
C
04/27/2026
Violation issued (HPD, open)
C
04/27/2026
Violation issued (HPD, open)
C
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/16/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, open)
I
12/19/2023
Signed off — Alteration
FILING FOR TEMPORARY CONSTRUCTION FENCE
Q00182288-I1
12/01/2023
Signed off — Alteration
FILING FOR PLUMBING WORK
Q00656397-I1
11/21/2023
Filed — Alteration
FILING FOR PLUMBING WORK
Q00656397-P6
11/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
11/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
11/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
11/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
11/01/2023
Filed — Alteration
FILING FOR PLUMBING WORK
Q00656397-P5
11/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
11/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
11/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
11/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
11/01/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
11/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
10/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2023
Signed off — Alteration
Q00341730-I1
10/06/2023
Signed off — Alteration
FILING TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION # 421945587
Q00341729-I1
10/05/2023
Filed — Alteration
FILING FOR PLUMBING WORK
Q00656397-P4
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/05/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
10/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
10/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
10/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
09/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2023
Filed — Alteration
FILING FOR PLUMBING WORK
Q00656397-P3
08/31/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
08/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
08/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
08/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
08/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
08/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
08/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2023
Filed — Alteration
FILING FOR PLUMBING WORK
Q00656397-P2
07/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
07/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
07/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
07/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
07/06/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
07/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
05/17/2023
Permit issued — Curb Cut
Q00341730-I1-CC
03/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 87 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BIRESH4307/08/2026
YZ REAL PROPERTY LLC103/22/2026
ZK DEVELOPMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2024$1.9M—— → —$586/sf building
05/31/2018$700K—ARVEST CENTRAL MORTGAGE COMPANY F/K/A → JAMAICA 777 INC.— not available
11/13/2017$770K—Private party → ARVEST CENTRAL MORTGAGE COMPANY— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASKON ARCHITECTS, P.C.811/21/2023
ANGELO NG & ANTHONY NG ARCHITECTS S310/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANGELO NG + ANTHONY NG ARCHITECTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZK DEVELOPMENT CORPGeneral Contractor707/08/2026
BTS PLUMBING HEATINGGeneral Contractor303/22/2026
BT'S PLUMBING AND HEATINGPlumbing307/08/2026
ANTHONY K NGElectrical103/21/2026
KISHAN PLBG HEATINGGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596711/21/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offZK DEVELOPMENT CORP05/17/2023
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING03/17/2023
DOB NOWConstruction FenceSigned-offZK DEVELOPMENT CORP10/27/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING08/09/2022
DOB NOWConstruction FenceSigned-offZK DEVELOPMENT CORP10/04/2021
DOB NOWConstruction FenceSigned-offZK DEVELOPMENT CORP09/02/2020
DOB NOWConstruction FenceSigned-offZK DEVELOPMENT CORP07/08/2019
BIS—ISSUEDZK DEVELOPMENT CORP10/29/2023
BIS—ISSUEDZK DEVELOPMENT CORP10/26/2022
BIS—ISSUEDZK DEVELOPMENT CORP10/29/2021
BISOTISSUEDZK DEVELOPMENT CORP01/25/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
11/20/2023HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
11/20/2023HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
11/20/2023HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
11/20/2023Energy Code Compliance InspectionsAkeeb Shekoniprogress
11/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
11/20/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
11/01/2023Energy Code Compliance InspectionsAkeeb Shekoniprogress
11/01/2023HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
11/01/2023HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
11/01/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
11/01/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
11/01/2023HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
10/05/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/05/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
10/05/2023Energy Code Compliance InspectionsAkeeb Shekoniprogress
10/05/2023HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
10/05/2023HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
10/05/2023HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
08/30/2023HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
08/30/2023HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
08/30/2023HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
08/30/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
08/30/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
08/30/2023Energy Code Compliance InspectionsAkeeb Shekoniprogress
07/06/2023HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
Latest 25 of 33.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/26/2026Q00656397-P6Request digital key ↗
08/26/2026Q00656397-P5Request digital key ↗
08/26/2026Q00656397-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00182288-I1Request digital key ↗
08/15/2026Q00341729-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00341730-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00341732-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION14
12/26/2023421945587Open ↗
09/18/2023421945587Open ↗
08/11/2023421945587Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION5
05/13/2021421945587Open ↗
05/13/2021421945587Open ↗
05/13/2021421945587Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/21/2023421945587Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/02/2020421945587Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
01/23/2024421945587Open ↗
▸BISVERIFY TAX LOT1
11/08/2023421945587Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/02/2020421945587Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/08/2023421945587Open ↗
▸BISZONING DIAGRAM1
08/03/2020421945587Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026Q00341730-I1Open ↗
08/28/2026Q00341729-I1Open ↗
08/27/2026Q00341732-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/20/2026Q00656397-P5Open ↗
09/20/2026Q00656397-P5Open ↗
08/28/2026Q00656397-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/20/2026Q00656397-P5Open ↗
08/28/2026Q00656397-P3Open ↗
08/25/2026Q00656397-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/18/2021421945587Open ↗
03/18/2021421945587Open ↗
03/14/2020421945587Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/19/2020440647196Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/19/2020440647196Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2020440647196Open ↗
▸Trade Schedules & Equipment8
▸BISGAS CUT-OFF1
08/14/2019421934919Open ↗
▸BISWATER CUT-OFF1
08/14/2019421934919Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/02/2023421945587Open ↗
▸BISELECTRIC CUT-OFF1
08/14/2019421934919Open ↗
▸BISSEWER CUT-OFF1
08/14/2019421934919Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/02/2023421945587Open ↗
▸BISFIRE ALARM TEST1
11/09/2023421945587Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/23/2024421945587Open ↗
▸Safety & Tenant Protection5
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
11/02/2023421945587Open ↗
01/17/2023440647196Open ↗
▸BISSTREET TREE CHECKLIST2
09/21/2023421945587Open ↗
03/14/2020421945587Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/14/2019421934919Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/18/2021421945587Open ↗
03/14/2020421945587Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/02/2023421945587Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/02/2023421945587Open ↗
▸BISFENESTRATION AREAS1
11/02/2023421945587Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/02/2023421945587Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/03/2020421945587Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/02/2023421945587Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00656397-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/13/2021440647196Open ↗
01/12/2021421945587Open ↗
01/08/2021421945587Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
03/18/2021421945587Open ↗
07/02/2020421945587Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
11/02/2023421945587Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/02/2023421945587Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/02/2023421945587Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/09/2023421945587Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
11/02/2023421945587Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
11/06/2023421945587Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/02/2023421945587Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/02/2023421945587Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/02/2023421945587Open ↗
▸BISMASONRY1
11/02/2023421945587Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE4
12/26/2023421945587Open ↗
07/27/2020421945587Open ↗
06/25/2020421945587Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/25/2021440647196Open ↗
08/14/2019421934919Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/28/2023440647196Open ↗
▸BISFINAL1
01/17/2023440647196Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/18/2021421945587Open ↗
08/14/2019421934919Open ↗
▸BISCOST AFFIDAVIT1
11/19/2020440647196Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
01/23/2024421945587Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/27/2023440647196Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
01/03/2024421945587Open ↗
08/17/2023421945587Open ↗
04/01/2022421945587Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
03/14/2020421945587Open ↗
06/03/2019421934919Open ↗
▸BISBOROUGH INTAKE FORM1
05/13/2021421945587Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
02/16/2021421945587Open ↗
08/03/2020421945587Open ↗
07/02/2020421945587Open ↗
▸BISSHUTOFF DAMPERS1
11/02/2023421945587Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/02/2023421945587Open ↗
▸BISMAINTENANCE INFORMATION1
11/02/2023421945587Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/02/2023421945587Open ↗
▸BISPERMANENT CERTIFICATE1
11/02/2023421945587Open ↗