ECB05/26/2026Failure to maintain building in code-compliant manner. Noted: fpsc interior classroom doors do not self-close properly at 2ND flr rm #s-202,204, 205, 206, 203, 210. 1ST flr rm #s-101, 103, 104, 106, 108. RemedyNothing owed — awaiting certificate of correction
ECB05/11/2022No cleanout on chimney base,discharge pipe missing on relief valve correct all violating conditions and submit a certificate of correctionNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB09/23/2024Violation issued-failure to file 2023 external low pressure inspectionAnswered on the city's records: a 2023 boiler inspection report was accepted (Nov 10, 2023)
DOB06/30/2023Violation issued-failure to file 2021 external low pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Apr 15, 2021)
DOB04/25/2023Violation issued-failure to file 2022 external low pressure inspectionAnswered on the city's records: a 2022 boiler inspection report was accepted (Jul 21, 2022)
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB12/17/2018Construction: other (DOB violation)Issued 2018; DOB's record still lists it as active2 identical filings