← Back
Two family frame
108-44 176 STREET
QUEENS · South Jamaica · BIN 4218702
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R4-1Zoning
2,100 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 13 docs
Cellar2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC203/05/2026
BAZINI ENGINEERING, P.C.202/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor303/21/2026
MAK ELECTRICAL CONTR CORPElectrical103/22/2026
NULITE FUEL OIL CO., LTDGeneral Contractor104/09/2026
NULITE FUEL OIL CO LTDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116203/05/2026
BAZINI ENGINEERING, P.C.1808102/09/2026
Building Lifecycle
All (19)Filed (4)Permit Issued (3)Signed Off (1)Special Inspection (11)
03/10/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q01292333-I1
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
03/06/2026
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
03/06/2026
Special inspection requirement — Final
VYACHESLAV NECHAYEV
03/05/2026
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q01292333-P1
03/05/2026
Permit issued — Mechanical Systems
Q01286355-I1-GC-CX
03/04/2026
Permit issued — Plumbing
Q01286355-S1-PL
02/09/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT GAS-FIRED FURNACE TO SERVE THE 1ST FLOOR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01286355-S1
02/09/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT GAS-FIRED FURNACE TO SERVE THE 1ST FLOOR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01286355-I1
02/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/04/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
12/04/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
10/03/2025
Permit issued — Solar
Q01292333-I1-SL
09/29/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q01292333-I1
09/12/2025
Special inspection requirement — Final
Joseph Bazini
09/12/2025
Special inspection requirement — Mechanical Systems
Joseph Bazini
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD03/05/2026
DOB NOWPlumbingSigned-offNULITE FUEL OIL CO LTD03/04/2026
DOB NOWSolarSigned-offPATRIOT ENERGY SOL CO10/03/2025
1 project · most recent 09/29/2025
FiledStatusContractorScope
09/29/2025CompleteMAK ELECTRICAL CONTR CORP2 meters
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/06/2026Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
03/06/2026Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
03/06/2026Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
03/06/2026FinalVYACHESLAV NECHAYEVprogress
02/09/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/04/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
12/04/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
12/04/2025FinalVYACHESLAV NECHAYEVprogress
12/04/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
09/12/2025FinalJoseph Baziniprogress
09/12/2025Mechanical SystemsJoseph Bazinispecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01286355-I1Request digital key ↗
08/17/2026Q01286355-S1Request digital key ↗
08/17/2026Q01292333-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026Q01292333-I1Open ↗
08/28/2026Q01292333-I1Open ↗
08/28/2026Q01286355-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01286355-S1Open ↗
08/17/2026Q01286355-I1Open ↗
08/17/2026Q01292333-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q01292333-I1Open ↗
08/28/2026Q01286355-I1Open ↗
08/25/2026Q01292333-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01286355-I1Open ↗
08/17/2026Q01286355-S1Open ↗
08/17/2026Q01292333-P1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01292333-I1Open ↗