← Back
Two stories - detached, small or mid-size
108-44 69 AVENUE
QUEENS · Forest Hills · BIN 4052276
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R1-2AZoning
2,580 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS104/09/2026
Building Lifecycle
All (28)Filed (1)Objection (3)Special Inspection (24)
05/05/2026
Objection raised — Zoning
05/05/2026
Objection raised — Energy
05/05/2026
Objection raised — Cost
04/09/2026
Filed — Alteration CO
HEREWITH FILE ALTERATION CO TO AN EXISTING TWO STORY ONE FAMILY DWELLING, TO ADD AN ATTIC FLOOR FOR STORAGE, MS FILED UNDER THIS APPLICATION TO ERECT INTERIOR PARTITIONS. STURCTURAL FILED SUBSEQUENTLY AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01384215-I1
04/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/07/2026
Special inspection requirement — Mechanical Systems
04/07/2026
Special inspection requirement — Concrete - Cast-In-Place
04/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/07/2026
Special inspection requirement — Subgrade Inspections
04/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
04/07/2026
Special inspection requirement — Final
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/07/2026
Special inspection requirement — Air barrier - visual inspection
04/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/07/2026
Special inspection requirement — Permanent certificate
04/07/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/07/2026
Special inspection requirement — Interior lighting power
04/07/2026
Special inspection requirement — Insulation placement and R values
04/07/2026
Special inspection requirement — Fenestration air leakage
04/07/2026
Special inspection requirement — Fenestration areas
04/07/2026
Special inspection requirement — Maintenance information
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/07/2026
Special inspection requirement — Ventilation and air distribution system
Nothing on file for this building.
1 project · most recent 04/09/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/09/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×3
Heating
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×3
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/07/2026Structural Stability – Alterations of existing buildings—special
04/07/2026Mechanical Systems—special
04/07/2026Concrete - Cast-In-Place—special
04/07/2026Exterior Insulation and Finish Systems (EIFS)—special
04/07/2026Fire-Resistant Penetrations and Joints—special
04/07/2026Subgrade Inspections—special
04/07/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
04/07/2026Final—progress
04/07/2026Energy Code Compliance Inspections—progress
04/07/2026Fire-Resistance Rated Construction—progress
04/07/2026Air barrier - visual inspection—energy_progress
04/07/2026HVAC-R and service water heating system controls—energy_progress
04/07/2026Duct leakage testing, insulation and design—energy_progress
04/07/2026Fenestration and door U-factor and product ratings—energy_progress
04/07/2026HVAC-R and service water heating equipment—energy_progress
04/07/2026Permanent certificate—energy_progress
04/07/2026Electric vehicle service equipment requirements—energy_progress
04/07/2026Interior lighting power—energy_progress
04/07/2026Insulation placement and R values—energy_progress
04/07/2026Fenestration air leakage—energy_progress
04/07/2026Fenestration areas—energy_progress
04/07/2026Maintenance information—energy_progress
04/07/2026HVAC-R and service water piping design and insulation—energy_progress
04/07/2026Ventilation and air distribution system—energy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026Q01384215-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01384215-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01384215-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01384215-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01384215-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01384215-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q01384215-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026Q01384215-I1Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026Q01384215-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01384215-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026Q01384215-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01384215-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01384215-I1Open ↗