← Back
Predominantly retail with other uses
108-45 ROOSEVELT AVENUE
QUEENS · BIN 4044834
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R6BZoning
3,566 sfGross Floor Area
2Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · 3,125 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
StructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 18 docs
CellarUnder Construction7p · 2 filings · 20 docs
1 job · most recent 05/25/2023
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/25/2023Permit IssuedMEGA MECHANICAL INCAir Conditioning Systems, Heating Systems
Cooling
Gree 3VIR24HP230V1AH 6 BTU · Split System ×12
Heating
Mitsubishi Electric 3VIR24HP230V1AH 6 BTU ×12
Ventilation
Mitsubishi Electric 3VIR24HP230V1AH 6 BTU · Heat Pump Outdoor ×12
Refrigeration
Mitsubishi Electric 3VIR24HP230V1AH 6 BTU · Heat Pump Outdoor ×12
1 job · most recent 05/25/2023
FiledStatusContractorScope
05/25/2023Signed-offXH&RC PLBG AND HTG INC—
2 jobs · most recent 02/01/2023
General Wiring
FiledStatusContractorScope
02/01/2023CompleteHV ELECTRIC CORPGeneral Wiring
06/01/2022CompleteHV ELECTRIC CORPGeneral Wiring
1 job · most recent 09/14/2021
FiledStatusContractorScope
09/14/2021Permit IssuedB T REFINISHING INC1 scope_items
Building Lifecycle
All (87)Filed (11)Permit Issued (9)Signed Off (2)Violation (3)Inspection (4)Objection (50)Special Inspection (8)
08/03/2026
Permit issued — Mechanical Systems
Q00352540-S1-MS
02/11/2026
Signed off — Alteration
CONSTRUCTION FENCE TO CREATE A SAFETY ZONE TO ALTER THE EXISTING BUILDING
Q00272562-I1
02/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/27/2025
Permit issued — General Construction
Q01137979-I1-GC
01/01/2025
Filed — Alteration
INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01137979-I1
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
04/15/2024
Filed — Alteration
CHANGE BOILER PRESSURE TO 30 PSI AND CONSTRUCTION MATERIAL TO TUBING BOILER CAST IRON
Q01003180-P3
04/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/19/2024
Filed — Alteration
CHANGE BOILER PRESSURE TO 30 PSI AND CONSTRUCTION MATERIAL TO TUBING BOILER CAST IRON
Q01003180-P2
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/12/2024
Filed — Alteration
CHANGE BOILER PRESSURE TO 30 PSI AND CONSTRUCTION MATERIAL TO TUBING BOILER CAST IRON
Q01003180-P1
02/28/2024
Permit issued — Boiler Equipment
Q01003180-I1-BE
02/12/2024
Filed — Alteration
CHANGE BOILER PRESSURE TO 30 PSI AND CONSTRUCTION MATERIAL TO TUBING BOILER CAST IRON
Q01003180-I1
01/31/2024
Signed off — Alteration
Sprinklers for commercial space on cellar and 1st floor.
Q00352540-I1
11/30/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Permit issued — Mechanical Systems
Q00352540-S1-MS
11/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/20/2023
Permit issued — Support of Excavation
Q00588158-I1-SE
10/25/2023
Permit issued — Sprinklers
Q00352540-I1-EW-SP
06/22/2023
Special inspection requirement — Mechanical Systems
CONNIE PISANI
06/22/2023
Special inspection requirement — Final
CONNIE PISANI
06/14/2023
Objection resolved — Addressed
05/30/2023
Objection raised — Scope
05/29/2023
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
05/25/2023
Filed — Alteration
Sprinklers for commercial space on cellar and 1st floor.
Q00352540-P2
05/25/2023
Filed — Alteration
Sprinklers for commercial space on cellar and 1st floor.
Q00352540-P3
05/23/2023
Special inspection requirement — Final
CONNIE PISANI
05/23/2023
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
05/23/2023
Special inspection requirement — Mechanical Systems
CONNIE PISANI
02/21/2023
Permit issued — Sprinklers
Q00352540-I1-EW-SP
05/05/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Site Safety
01/07/2022
Permit issued — Construction Fence
Q00272562-I1-FN
10/08/2021
Objection raised — Other
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Other
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Inspections
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Structural
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Inspections
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Admin
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Scope
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Admin
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Inspections
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Admin
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Structural
10/08/2021
Objection resolved — Addressed
10/08/2021
Objection raised — Admin
10/08/2021
Objection resolved — Addressed
09/17/2021
Permit issued — Construction Fence
Q00272562-I1-FN
09/14/2021
Filed — Alteration
TO PROVIDED EXCAVATION PLANS FOR EXTENTION OF CELLAR.
Q00588158-I1
07/19/2021
Objection raised — Zoning
Latest 60 of 87 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIAN FAN LIN INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SH ENGINEERING PLLC101/01/2025
KING DAVID ARCHITECTURE PC404/15/2024
PRAINITO ARCHITECT P.C.505/25/2023
AZ PROFESSIONAL ENGINEERING PC109/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KING DAVID ARCHITECTURE803/21/2026
PRAINITO ARCHITECT P C203/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OASIS PLOMO CORPGeneral Contractor303/21/2026
YOUN DESIGN CORPGeneral Contractor303/21/2026
B T REFINISHING INCGeneral Contractor303/21/2026
DIAN FA LIN INCGeneral Contractor204/09/2026
XH&RC PLBG AND HTG INCFire Protection207/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
MEGA MECHANICAL INCGeneral Contractor108/04/2026
HV ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292404/15/2024
AMARACON TESTING & INSPEC5842405/25/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMEGA MECHANICAL INC08/03/2026
DOB NOWGeneral ConstructionSigned-offYOUN DESIGN CORP01/27/2025
DOB NOWBoiler EquipmentSigned-offSIGNORE & SONS PLBG CORP02/28/2024
DOB NOWMechanical SystemsPermit IssuedOASIS PLOMO CORP11/22/2023
DOB NOWSupport of ExcavationPermit IssuedB T REFINISHING INC11/20/2023
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC10/25/2023
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC02/21/2023
DOB NOWConstruction FenceSigned-offDIAN FA LIN INC01/07/2022
DOB NOWConstruction FenceSigned-offDIAN FA LIN INC09/17/2021
BISPLISSUEDSIGNORE & SONS PLBG CORP11/28/2023
BIS—ISSUEDDIAN FA LIN INC01/09/2023
BISPLISSUEDXH&RC PLBG AND HTG INC09/27/2022
BIS—ISSUEDDIAN FA LIN INC08/10/2022
BIS—ISSUEDDIAN FA LIN INC02/28/2022
BIS—ISSUEDB T REFINISHING INC02/14/2022
BISOTISSUEDJCT DEVELOPMENT NY INC05/23/2013
BISEQISSUEDJCT DEVELOPMENT NY INC05/23/2013
BISPLISSUEDUEENS, THE MECHANICAL CORP05/27/2004
BISOTISSUEDN/A03/11/2004
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/30/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/26/2024Fire-Resistant Penetrations and JointsJose Santosspecial
03/19/2024Fire-Resistant Penetrations and JointsJose Santosspecial
06/22/2023Mechanical SystemsCONNIE PISANIspecial
06/22/2023FinalCONNIE PISANIprogress
05/29/2023Sprinkler SystemsCONNIE PISANIspecial
05/23/2023FinalCONNIE PISANIprogress
05/23/2023Sprinkler SystemsCONNIE PISANIspecial
05/23/2023Mechanical SystemsCONNIE PISANIspecial
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch6
08/23/2026Q01003180-I1Request digital key ↗
08/23/2026Q01003180-P3Request digital key ↗
08/23/2026Q01003180-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026Q00352540-S1Request digital key ↗
08/14/2026Q00352540-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/24/2026Q00352540-P2Request digital key ↗
08/14/2026Q00352540-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00272562-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION16
01/27/2026421931841Open ↗
12/26/2023421931841Open ↗
10/30/2023421931841Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION7
04/23/2025421931841Open ↗
03/03/2023421931841Open ↗
09/27/2022421931841Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/08/2022421931841Open ↗
06/08/2022421931841Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/06/2023421931841Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
08/20/2019421931841Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00588158-I1Open ↗
08/24/2026Q00352540-S1Open ↗
08/24/2026Q00352540-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01003180-I1Open ↗
08/30/2026Q00352540-P2Open ↗
08/30/2026Q00352540-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/14/2022421931841Open ↗
08/01/2019421931841Open ↗
08/01/2019421931841Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026Q00352540-S1Open ↗
08/25/2026Q00352540-P3Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2013420838543Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/29/2013420838543Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING7
12/26/2023421931841Open ↗
10/30/2023421931841Open ↗
10/23/2023421931841Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/16/2019421931841Open ↗
01/26/2019421931841Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/20/2019421931841Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026Q01003180-I1Open ↗
08/23/2026Q01003180-P3Open ↗
08/23/2026Q01003180-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)3
05/29/2013420838543Open ↗
05/29/2013420838543Open ↗
01/26/2019421931841Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/14/2022421931841Open ↗
01/26/2019421931841Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/07/2020421931841Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/29/2013420838543Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/08/2022421931841Open ↗
11/18/2020421931841Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/01/2019421931841Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE8
09/21/2023421931841Open ↗
09/20/2023421931841Open ↗
08/22/2023421931841Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
05/29/2013420838543Open ↗
▸BISSUPERSEDING LETTER1
04/23/2025421931841Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/02/2019421931841Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
05/19/2022421931841Open ↗
01/26/2019421931841Open ↗
05/29/2013420838543Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/03/2023421931841Open ↗
04/14/2022421931841Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION8
01/18/2024421931841Open ↗
11/03/2023421931841Open ↗
06/30/2023421931841Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
04/23/2025421931841Open ↗
03/03/2023421931841Open ↗
04/14/2022421931841Open ↗
▸BISEFILING COVER SHEET2
01/26/2019421931841Open ↗
05/29/2013420838543Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
08/01/2019421931841Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00588158-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q00588158-I1Open ↗