Three families
108-45 SUTPHIN BOULEVARD
QUEENS · BIN 4618330
💬 Discuss this project
2020Year Built
3Stories
C0Building Class
R5DZoning
3,943 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 2,016 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKHTAR CONSTRUCTION303/22/2026
NEWMARWOOD1203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2024$1.4M—NEWMARWOOD LLC → Private party$368/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/12/2025
MAXFIELD BLAUFEUX & HEYWOOD BLAUFEU301/25/2022
A TECH ENGINEERING NYC, PLLC.108/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKHTAR CONSTRUCTION CO INGeneral Contractor307/08/2026
ADAM ELECL CONTRNG LLCElectrical103/22/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/12/2025
A TECH ENGINEERING NYC, P6738108/01/2019
Building Lifecycle
All (27)Filed (5)Permit Issued (5)Signed Off (4)Violation (2)Inspection (4)Special Inspection (7)
01/14/2026
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 30 modules, 12.9 KW
Q01220478-I1
05/15/2025
Permit issued — Solar
Q01220478-I1-SL
05/12/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 30 modules, 12.9 KW
Q01220478-I1
05/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/05/2025
Special inspection requirement — Final
Mina Makar
05/05/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/08/2022
Signed off — Alteration
Installation of new fire sprinkler system with valves and meters for same. filed in conjunction with new building application # 421627902.
Q00201576-I1
06/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/25/2022
Permit issued — Sprinklers
Q00201576-I1-PL
02/07/2022
Signed off — Alteration
INSTALL CURB CUT
Q00410673-I1
01/25/2022
Filed — Alteration
INSTALL CURB CUT
Q00410673-P1
09/03/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/31/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/27/2021
Violation issued (ECB, closed)
Construction
07/16/2021
Permit issued — Plumbing
Q00201576-I1-EW-SP
07/09/2021
Permit issued — Curb Cut
Q00410673-I1-CC
07/08/2021
Signed off — Alteration
Construction fence
Q00217408-I1
03/02/2021
Filed — Alteration
INSTALL CURB CUT
Q00410673-I1
08/14/2020
Violation issued (ECB, closed)
Construction
09/20/2019
Permit issued — Construction Fence
Q00217408-I1-FN
08/26/2019
Filed — Alteration
Construction fence
Q00217408-I1
08/26/2019
Special inspection requirement — Final
Heywood Blaufeux
08/01/2019
Filed — Alteration
Installation of new fire sprinkler system with valves and meters for same. filed in conjunction with new building application # 421627902.
Q00201576-I1
07/29/2019
Special inspection requirement — Sprinkler Systems
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/15/2025
DOB NOWSprinklersSigned-offHORBRIDGE PLUMBING & HEAT05/25/2022
DOB NOWPlumbingSigned-offCITYWIDE PLBG, HTG &SPRKL07/16/2021
DOB NOWCurb CutSigned-offAKHTAR CONSTRUCTION CO IN07/09/2021
DOB NOWConstruction FenceSigned-offAKHTAR CONSTRUCTION CO IN09/20/2019
BISPLISSUEDHORBRIDGE PLUMBING & HEATING01/05/2022
BISEQISSUEDAKHTAR CONSTRUCTION CO IN07/14/2020
BIS—ISSUEDAKHTAR CONSTRUCTION CO IN07/14/2020
BISPLISSUEDHORBRIDGE PLUMBING & HEATING06/18/2020
BISPLISSUEDAUSTIN PLBG & HTG CO.INC02/28/2020
BIS—ISSUEDAKHTAR CONSTRUCTION CO IN01/09/2020
BIS—ISSUEDAKHTAR CONSTRUCTION CO IN01/09/2020
BIS—ISSUEDAKHTAR CONSTRUCTION CO IN11/01/2019
2 projects · most recent 05/05/2025
General Wiring
FiledStatusContractorScope
05/05/2025CompleteISLAND ELECTRIC CORP—
03/02/2020CompleteADAM ELECL CONTRNG LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/31/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/05/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/05/2025FinalMina Makarprogress
05/05/2025Air barrier - visual inspectionMina Makarenergy_progress
05/05/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/05/2025Energy Code Compliance InspectionsMina Makarprogress
08/26/2019FinalHeywood Blaufeuxprogress
07/29/2019Sprinkler Systemsanthony santorospecial
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Curb Cut2
08/27/2026Q00410673-P1Request digital key ↗
08/27/2026Q00410673-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00217408-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/20/2026Q01220478-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00201576-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00201576-I1Request digital key ↗
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION9
07/16/2020421627902Open ↗
03/02/2020421627902Open ↗
01/10/2020421627902Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
04/25/2022421627902Open ↗
03/15/2022421627902Open ↗
02/18/2022421627902Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/12/2021421627902Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISVERIFY TAX LOT1
05/17/2022421627902Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/10/2019421627902Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/17/2022421627902Open ↗
▸BISZONING DIAGRAM1
09/11/2019421627902Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/10/2019421627902Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
09/19/2019421627902Open ↗
09/19/2019421627902Open ↗
09/10/2019421627902Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00410673-I1Open ↗
08/13/2026Q01220478-I1Open ↗
08/13/2026Q00217408-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q01220478-I1Open ↗
08/29/2026Q01220478-I1Open ↗
08/29/2026Q00217408-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01220478-I1Open ↗
08/24/2026Q00201576-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/11/2020440625021Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/11/2020440625021Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/11/2020440625021Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING5
04/25/2022421627902Open ↗
03/15/2022421627902Open ↗
02/18/2022421627902Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/07/2018421627902Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026Q00201576-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
05/07/2018421627902Open ↗
▸BISSTREET TREE SIGNOFF1
11/23/2021421627902Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/16/2022421627902Open ↗
05/17/2022421627902Open ↗
05/10/2022421627902Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/01/2019421627902Open ↗
05/07/2018421627902Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/16/2022421627902Open ↗
05/10/2022421627902Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/16/2022421627902Open ↗
05/17/2022421627902Open ↗
05/10/2022421627902Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
05/31/2022421627902Open ↗
11/08/2019421627902Open ↗
09/10/2019421627902Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
11/08/2019421627902Open ↗
09/10/2019421627902Open ↗
08/01/2019421627902Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION3
06/16/2022421627902Open ↗
05/10/2022421627902Open ↗
09/19/2019421627902Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
09/12/2019421627902Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/31/2022421627902Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
06/03/2022421627902Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE1
05/10/2018421627902Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/31/2019421627902Open ↗
▸BISSUPERSEDING LETTER1
07/16/2020421627902Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01220478-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/19/2020421627902Open ↗
01/10/2020421627902Open ↗
11/08/2019421627902Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
09/19/2019421627902Open ↗
08/02/2019421627902Open ↗
▸BISCOST AFFIDAVIT1
09/11/2020440625021Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
03/29/2022421627902Open ↗
01/20/2022421627902Open ↗
08/22/2021421627902Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/11/2020440625021Open ↗
▸BISBOROUGH INTAKE FORM1
07/16/2020421627902Open ↗
▸BISEFILING COVER SHEET1
05/07/2018421627902Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/11/2020440625021Open ↗
09/19/2019421627902Open ↗
▸BISPLOT DIAGRAM1
05/07/2018421627902Open ↗