← Back
Multi-story retail building (2+)
108 EAST 60 STREET
MANHATTAN · BIN 1041907
💬 Discuss this project
1920Year Built
5Stories
K2Building Class
C5-3Zoning
6,554 sfGross Floor Area
1Units
Rent Stabilized1 Open Violation ▸
Multi-story retail building (2+) · Owner of record: 108EAST60ST. LLC · 2,008 sf lot · 3.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 435p · 3 filings · 20 docs
Floor 329p · 2 filings · 20 docs
Floor 239p · 4 filings · 20 docs
Floor 128p · 2 filings · 20 docs
Cellar27p · 2 filings · 20 docs
Basement33p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRST ISLAND PARTNER103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2021$7.0M—— → —$1,074/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN GROUP IN H&K LLC1102/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN GROUP IN H K2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEXTCOM CONSTRUCTION, INC.General Contractor507/08/2026
PLUMBING & HTG DOCTOR INCFire Protection107/08/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN GROUP IN H&K LLC13631102/13/2023
Building Lifecycle
All (99)Filed (11)Permit Issued (6)Signed Off (3)Violation (38)Inspection (9)Objection (2)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/28/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
02/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SUKHWAN KIM
02/14/2023
Special inspection requirement — Air barrier - visual inspection
SUKHWAN KIM
02/14/2023
Special inspection requirement — Fenestration areas
SUKHWAN KIM
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
02/13/2023
Filed — Alteration CO
CONVERSION OF COMMERCIAL SPACES. (BAS,001: STORE, 002-004: OFFICE) THE WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY WORKS AS PER PLANS HEREWITH. TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
M00525847-P5
01/18/2023
Filed — Alteration CO
CONVERSION OF COMMERCIAL SPACES. (BAS,001: STORE, 002-004: OFFICE) THE WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY WORKS AS PER PLANS HEREWITH. TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
M00525847-P4
01/17/2023
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
01/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
01/17/2023
Special inspection requirement — Air barrier - visual inspection
SUKHWAN KIM
01/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SUKHWAN KIM
01/17/2023
Special inspection requirement — Fenestration areas
SUKHWAN KIM
12/28/2022
Permit issued — General Construction
M00525847-I1-GC
12/07/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2022
Filed — Alteration CO
CONVERSION OF COMMERCIAL SPACES. (BAS,001: STORE, 002-004: OFFICE) THE WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY WORKS AS PER PLANS HEREWITH. TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
M00525847-P3
11/18/2022
Signed off — Alteration
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH DOB#M00525847. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00525940-I1
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
10/26/2022
Special inspection requirement — Fenestration areas
SUKHWAN KIM
10/26/2022
Special inspection requirement — Air barrier - visual inspection
SUKHWAN KIM
10/26/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SUKHWAN KIM
10/26/2022
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
10/13/2022
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH ALT1#M00525847. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00657570-I1
10/13/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING (HAIR SALON). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00525920-I1
10/11/2022
Filed — Alteration CO
CONVERSION OF COMMERCIAL SPACES. (BAS,001: STORE, 002-004: OFFICE) THE WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY WORKS AS PER PLANS HEREWITH. TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
M00525847-P2
10/10/2022
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
10/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
10/10/2022
Special inspection requirement — Air barrier - visual inspection
SUKHWAN KIM
10/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SUKHWAN KIM
10/10/2022
Special inspection requirement — Fenestration areas
SUKHWAN KIM
10/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/26/2022
Objection raised — Structural
09/26/2022
Objection resolved — Addressed
09/23/2022
Special inspection requirement — Mechanical Systems
SUKHWAN KIM
09/23/2022
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
09/23/2022
Special inspection requirement — Final
SUKHWAN KIM
09/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SUKHWAN KIM
09/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
SUKHWAN KIM
09/23/2022
Special inspection requirement — Duct leakage testing, insulation and design
SUKHWAN KIM
09/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
SUKHWAN KIM
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
09/23/2022
Special inspection requirement — Final
SUKHWAN KIM
09/23/2022
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
09/22/2022
Filed — Alteration CO
CONVERSION OF COMMERCIAL SPACES. (BAS,001: STORE, 002-004: OFFICE) THE WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY WORKS AS PER PLANS HEREWITH. TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
M00525847-P1
09/22/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING (HAIR SALON). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD-BEARING PARTITIONS AND MISC. CARPENTRY AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00525920-P1
09/22/2022
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH ALT1#M00525847. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00657570-P1
09/21/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/22/2022
Permit issued — Mechanical Systems
M00657570-I1-MS
08/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/04/2022
Permit issued — Sprinklers
M00525940-I1-PL
02/04/2022
Permit issued — Plumbing
M00525940-I1-EW-SP
01/21/2022
Filed — Alteration
INSTALLATION/MODIFICATION OF PLUMBING & SPRINKLER SYSTEM IN CONJUNCTION WITH DOB#M00525847. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00525940-I1
01/21/2022
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH ALT1#M00525847. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M00657570-I1
12/13/2021
Permit issued — General Construction
M00525920-I1-GC
12/10/2021
Permit issued — General Construction
M00525847-I1-GC
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEXTCOM CONSTRUCTION, INC12/28/2022
DOB NOWMechanical SystemsSigned-offNEXTCOM CONSTRUCTION, INC08/22/2022
DOB NOWSprinklersSigned-offMATHEW WEISS02/04/2022
DOB NOWPlumbingSigned-offPLUMBING & HTG DOCTOR INC02/04/2022
DOB NOWGeneral ConstructionSigned-offNEXTCOM CONSTRUCTION, INC12/13/2021
DOB NOWGeneral ConstructionPermit IssuedNEXTCOM CONSTRUCTION, INC12/10/2021
BISPLISSUEDGEORGE BRESLAW & SONS INC01/26/2009
BISOTISSUEDL.S. SIGN CO INC03/09/2005
BIS—ISSUEDL.S. SIGN CO INC12/22/2004
BISBLISSUEDAGLIARDO PETER12/12/2003
BIS—ISSUEDSTRUCTURE TONE, LLC11/20/2003
BISSPISSUEDTRIANGLE FIRE PROTECTION CORP11/07/2003
BISPLISSUEDGEORGE BRESLAW SONS INC.10/31/2003
BISEQISSUEDALL SAFE HEIGHT CONTRACTING CO04/22/2003
BISEQISSUEDALL SAFE HEIGHT CONTRACTING CO04/22/2003
BISPLISSUEDGEORGE BREESLAW SONS04/18/2003
BIS—ISSUEDSTRUCTURE TONE, LLC04/02/2003
BISOTISSUEDAMBASSADOR CONSTRUCTION C12/05/2002
1 project · most recent 08/19/2022
General Wiring
FiledStatusContractorScope
08/19/2022CompleteW 8 ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/28/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
12/07/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
02/14/2023Energy Code Compliance InspectionsSUKHWAN KIMprogress
02/14/2023Fenestration and door U-factor and product ratingsSUKHWAN KIMenergy_progress
02/14/2023Air barrier - visual inspectionSUKHWAN KIMenergy_progress
02/14/2023Fenestration areasSUKHWAN KIMenergy_progress
02/14/2023Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
01/17/2023Energy Code Compliance InspectionsSUKHWAN KIMprogress
01/17/2023Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
01/17/2023Air barrier - visual inspectionSUKHWAN KIMenergy_progress
01/17/2023Fenestration and door U-factor and product ratingsSUKHWAN KIMenergy_progress
01/17/2023Fenestration areasSUKHWAN KIMenergy_progress
10/26/2022Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
10/26/2022Fenestration areasSUKHWAN KIMenergy_progress
10/26/2022Air barrier - visual inspectionSUKHWAN KIMenergy_progress
10/26/2022Fenestration and door U-factor and product ratingsSUKHWAN KIMenergy_progress
10/26/2022Energy Code Compliance InspectionsSUKHWAN KIMprogress
10/10/2022Energy Code Compliance InspectionsSUKHWAN KIMprogress
10/10/2022Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
10/10/2022Air barrier - visual inspectionSUKHWAN KIMenergy_progress
10/10/2022Fenestration and door U-factor and product ratingsSUKHWAN KIMenergy_progress
10/10/2022Fenestration areasSUKHWAN KIMenergy_progress
09/23/2022Mechanical SystemsSUKHWAN KIMspecial
09/23/2022Energy Code Compliance InspectionsSUKHWAN KIMprogress
09/23/2022FinalSUKHWAN KIMprogress
09/23/2022HVAC-R and service water piping design and insulationSUKHWAN KIMenergy_progress
09/23/2022HVAC-R and service water heating equipmentSUKHWAN KIMenergy_progress
Latest 25 of 50.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00525940-I1Request digital key ↗
09/01/2026M00525920-I1Request digital key ↗
09/01/2026M00525920-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
09/28/2022122329499Open ↗
03/16/2015122329499Open ↗
03/11/2015122329499Open ↗
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature40
09/01/2026M00525920-I1Open ↗
09/01/2026M00525920-I1Open ↗
09/01/2026M00525920-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00525940-I1Open ↗
09/01/2026M00657570-I1Open ↗
08/31/2026M00525847-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00525920-I1Open ↗
09/01/2026M00525847-I1Open ↗
09/01/2026M00525847-P2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2015122329499Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/11/2015122329499Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/11/2015122329499Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/11/2015122329499Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00525940-I1Open ↗
09/01/2026M00657570-I1Open ↗
08/31/2026M00525847-P5Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/11/2015122329499Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00525847-I1Open ↗
08/13/2026M00525920-I1Open ↗
08/13/2026M00657570-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/11/2015122329499Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/11/2015122329499Open ↗
▸Filing & Intake Forms1
▸BISeFiling Job Application Cover Sheet1
03/11/2015122329499Open ↗