LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 80,000 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
StructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 250 George H. Lindsay2 filings · 20 docs
Floor 3P.S. 250 George H. Lindsay1 filing · 20 docs
Floor 2P.S. 250 George H. Lindsay1 filing · 20 docs
Floor 1P.S. 250 George H. Lindsay1 filing · 20 docs
Sub-BasementP.S. 250 George H. Lindsay1 filing · 20 docs
Filed — no permit issuedP.S. 250K, P.S. 250 George H. Lindsay23p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority4110/20/2026
NYC Department of Education203/22/2026
Department of School Construction Aut203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Velocity Architecture & Engineering1203/21/2026
Stephen B Jacobs Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Charan Electrical Enterp'sElectrical303/22/2026
E.N.E.L. ElectricalElectrical203/21/2026
Laser Electrical Constr'gElectrical103/21/2026
A & S ElectricElectrical103/21/2026
Metropolitan Electric of NY IElectrical103/21/2026
Building Lifecycle
All (129)Filed (18)Violation (56)Objection (25)Special Inspection (30)
10/19/2026
Filed — Alteration
DESIGN OF SUPPORT OF EXCAVATION AT THESIDEWALK FOR ACCESS TO UTILITY LINES. FILED IN CONJUNCTION WITH APPLICATION#B01339631.
B01422269-I1
10/05/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P5
10/05/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P4
10/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
10/05/2026
Special inspection requirement — Energy Code Compliance Inspections
10/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
10/05/2026
Special inspection requirement — Post-installed Anchors
10/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
10/05/2026
Special inspection requirement — Post-installed Anchors
10/05/2026
Special inspection requirement — Maintenance information
10/05/2026
Special inspection requirement — Sprinkler Systems
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/23/2026
Objection raised — Other
09/23/2026
Objection raised — Other
09/21/2026
Objection resolved — Addressed
09/21/2026
Special inspection requirement — Lighting controls
09/21/2026
Special inspection requirement — Electrical motors and elevators
09/21/2026
Special inspection requirement — Exterior lighting power
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/21/2026
Special inspection requirement — Maintenance information
09/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
09/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/21/2026
Special inspection requirement — Post-installed Anchors
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/21/2026
Special inspection requirement — Shutoff dampers
09/21/2026
Special inspection requirement — Final
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
09/21/2026
Special inspection requirement — Heating Systems
09/21/2026
Special inspection requirement — Mechanical Systems
09/21/2026
Special inspection requirement — Interior lighting power
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/21/2026
Special inspection requirement — Metering
09/18/2026
Objection raised — Other
09/17/2026
Filed — Alteration
B01422261-I1
09/17/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK. FILED IN CONJUNCTION WITH APPLICATION#B01339631-I1.
B01422263-I1
09/16/2026
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR WORK LOCATION ACCESS. FILED IN CONJUNCTION WITH APPLICATION #B01339631-I1.
B01422265-I1
09/15/2026
Objection raised — Other
09/11/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P3
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Heating Systems
09/10/2026
Special inspection requirement — Mechanical Systems
06/09/2026
Violation issued (ECB, open)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
05/08/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P2
05/08/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P1
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Other
01/29/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-S6
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Other
12/30/2025
Objection raised — Other
12/30/2025
Objection raised — Other
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDL & R Home Improvment11/26/2024
BISOTISSUEDL & R Home Improvment11/26/2024
BISOTISSUEDL & R Home Improvment12/01/2023
BISOTISSUEDL & R Home Improvment12/01/2023
BISOTISSUEDL & R Home Improvment09/06/2023
BISOTISSUEDL & R Home Improvment09/06/2023
BISOTISSUEDL & R Home Improvment11/17/2022
BISOTISSUEDL & R Home Improvment11/17/2022
BISOTISSUEDWhitestone Construction04/06/2020
BISOTISSUEDWhitestone Construction03/29/2019
BISOTISSUEDWhitestone Construction04/11/2018
BISOTRE-ISSUEDWhitestone Construction12/13/2017
BISEQISSUEDCreamer Environmental07/10/2017
BISOTISSUEDWhitestone Construction03/27/2015
BISEQISSUEDWhitestone Construction03/31/2014
BISOTISSUEDWhitestone Construction03/31/2014
BISEQISSUEDWhitestone Construction03/31/2014
BISEQISSUEDWhitestone Construction03/31/2014
BISEQISSUEDWhitestone Construction02/14/2014
BISEQISSUEDWhitestone Construction01/27/2014
BISEQISSUEDWhitestone Construction01/27/2014
BISOTISSUEDWhitestone Construction11/06/2013
BISPLISSUEDForsythe P&H01/20/2006
BISFPISSUEDFiremasters01/12/2006
BISOTISSUEDMonpat Contruction06/03/1999
BISPLISSUEDA. Berwind Plumbing & Heating Co06/03/1999
BISOTISSUEDAurash Construction05/26/1999
BISEQISSUEDAce Scaffold Co05/12/1999
BISOTISSUEDAurash Construction11/09/1998
BISEQISSUEDSpring Scaffolding04/29/1998
BISPLISSUEDSunset Plumbing & Fire Protection08/05/1993
BISMHISSUEDMechanical CM07/16/1993
BISOTISSUEDMechanical CM05/27/1993
1 project · most recent 10/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/05/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKA-AK12NL 12,000 BTU · Split System ×4
PUY-AK12NL 12,000 BTU · Condensing Unit ×4
PKA-AK24NL 24,000 BTU · Split System ×2
PKA-AK36NL 36,000 BTU · Vrf Indoor ×2
PUY-AH24NL 24,000 BTU · Condensing Unit ×2
PUY-AK36NL 36,000 BTU · Condensing Unit ×2
Polar Cooling Technologies P-RTP.C.F40.AC.HR.PE.HP 480,000 BTU · Rooftop Unit ×4
P-RTP.C.E30.AC.HR.PE.HP 337,000 BTU · Rooftop Unit ×2
P-RTP.C.F40.AC.HP 418,000 BTU · Rooftop Unit ×2
P-RTP.C.F60.AC.HR.PE.HP 625,000 BTU · Rooftop Unit ×2
P-RTP.C.F60AC.HR.PE.HP 671,000 BTU · Rooftop Unit ×2
Polartech P-RTP.C.F60.AC.HR.PE.HP 641,000 BTU · Rooftop Unit ×2
Ventilation
Greenheck G-120-VG 1,125 CFM · Exhaust Fan ×4
CUE-300HP-VG 3,850 CFM · Exhaust Fan ×2
G-080-VG 200 CFM · Exhaust Fan ×2
G-200-VG 2,660 CFM · Exhaust Fan ×2
SE1-8-440-VG 175 CFM · Exhaust Fan ×2
SQ-97-VG 100 CFM · Exhaust Fan ×2
Captiveaire WP-10 100 CFM · Exhaust Fan ×2
1 project · most recent 10/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/05/2026——Gas, Storm, Water/Sanitary
14 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedAbm ElectricGeneral Wiring
02/16/2026CompleteGemini Electric Co—
07/08/2024CompleteCharan Electrical Enterp's—
08/30/2023CompleteCharan Electrical Enterp's—
07/10/2023CompleteCharan Electrical Enterp's—
11/22/2022CompleteMetropolitan Electric of NY IGeneral Wiring
08/26/2022CompleteCharan Electrical Enterp's—
03/09/2022CompleteCharan Electrical Enterp's—
01/05/2022CompleteCharan Electrical Enterp's—
05/10/2021Permit IssuedA & S ElectricGeneral Wiring
04/19/2021CompleteAbm Electric—
01/20/2020CompleteCharan Electrical Enterp's—
12/06/2018CompleteA & S Electric—
12/28/2017CompleteCharan Electrical Enterp's—
3 projects · most recent 10/19/2026
Steel Concrete
FiledStatusContractorScope
10/19/2026——2 scope_items
10/05/2026——Steel, Concrete
10/15/2024——1 scope_items
2 projects · most recent 09/17/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/17/2026——Sidewalk Shed
09/16/2026——Scaffold
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
10/05/2026Fire-Resistant Penetrations and Joints—special
10/05/2026HVAC-R and service water heating equipment—energy_progress
10/05/2026Maintenance information—energy_progress
10/05/2026HVAC-R and service water piping design and insulation—energy_progress
10/05/2026HVAC-R and service water heating system controls—energy_progress
10/05/2026Energy Code Compliance Inspections—progress
10/05/2026Post-installed Anchors—special
10/05/2026Fire-Resistant Penetrations and Joints—special
10/05/2026Sprinkler Systems—special
10/05/2026Post-installed Anchors—special
09/21/2026Exterior lighting power—energy_progress
09/21/2026Mechanical Systems—special
09/21/2026Heating Systems—special
09/21/2026Fire-Resistant Penetrations and Joints—special
09/21/2026Post-installed Anchors—special
09/21/2026Final—progress
09/21/2026Energy Code Compliance Inspections—progress
09/21/2026Duct leakage testing, insulation and design—energy_progress
09/21/2026Maintenance information—energy_progress
09/21/2026Electrical motors and elevators—energy_progress
09/21/2026HVAC-R and service water piping design and insulation—energy_progress
09/21/2026Lighting controls—energy_progress
09/21/2026HVAC-R and service water heating equipment—energy_progress
09/21/2026Interior lighting power—energy_progress
09/21/2026Metering—energy_progress
Latest 25 of 99.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 250KEducation—
Project B01422269 Alteration · Plan Examiner Review · 10/19/2026
Project B01422263 Alteration · Objections · 09/17/2026
P.S. 250 George H. LindsayEducationSub-basement, Floors 1–3, Roof
Project B01422261 Alteration · Objections · 09/17/2026
Project B01422265 Alteration · Objections · 09/16/2026
Project B01339631 Alteration · Approved · 12/26/2025
Project B01097146 Alteration · Approved · 08/16/2024
P.S. K250EducationFloor 1
Project B00461962 Alteration · Filing Withdrawn · 02/05/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
10/20/2026B01422269-I1Request digital key ↗
10/04/2026B01422261-I1Request digital key ↗
09/23/2026B01422263-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00461962-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature16
10/20/2026B01422269-I1Open ↗
10/04/2026B01422261-I1Open ↗
09/23/2026B01422263-I1Open ↗
Showing 3 of 16 on file for this type
▸Approvals, Objections & Sign-offs39
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
10/20/2026B01422269-I1Open ↗
10/04/2026B01422261-I1Open ↗
09/23/2026B01422263-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
10/20/2026B01422269-I1Open ↗
10/04/2026B01422261-I1Open ↗
09/23/2026B01422263-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026B01339631-S2Open ↗
08/13/2026B01097146-S1Open ↗
08/13/2026B01339631-S3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents21
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal21
10/20/2026B01422269-I1Open ↗
10/04/2026B01422261-I1Open ↗
09/23/2026B01422263-I1Open ↗
Showing 3 of 21 on file for this type