← Back
Church, synagogue, chapel
108 NOBLE STREET
BROOKLYN · BIN 3064957
💬 Discuss this project
1895Year Built
1Stories
M1Building Class
R6BZoning
4,000 sfGross Floor Area
1Units
Church, synagogue, chapel · 2,500 sf lot · 1.6 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 5 docs
Floor 12p · 2 filings · 20 docs
Mezzanine1p · 2 filings · 20 docs
Basement2p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSINI ENGINEERING, PC608/11/2022
REXRODE CHIRIGOS ARCHITECTS108/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPERB PLUMBING & HEATINGPlumbing407/08/2026
WMG RENOVATION CORPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423308/11/2022
Building Lifecycle
All (31)Filed (7)Permit Issued (5)Signed Off (4)Inspection (7)Objection (2)Special Inspection (6)
01/17/2023
Signed off — Alteration
Install (1) new gas fired boiler in basement with expansion tank, hot water piping and flue.
B00765934-I1
01/17/2023
Signed off — Alteration
Install (1) new gas fired boiler in basement with expansion tank, hot water piping and flue.
B00765934-S1
01/17/2023
Signed off — Alteration
Modification to existing plumbing fixtures and associated piping.
B00573944-I1
12/14/2022
Signed off — Alteration
B00573825-I1
08/29/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/25/2022
Permit issued — Boiler Equipment
B00765934-S1-BE
08/18/2022
Special inspection requirement — Heating Systems
Young Suh
08/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/11/2022
Filed — Alteration
Install (1) new gas fired boiler in basement with expansion tank, hot water piping and flue.
B00765934-S1
08/11/2022
Filed — Alteration
Install (1) new gas fired boiler in basement with expansion tank, hot water piping and flue.
B00765934-P1
08/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/08/2022
Special inspection requirement — Heating Systems
Young Suh
07/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/29/2022
Special inspection requirement — Heating Systems
Young Suh
07/28/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/22/2022
Permit issued — Boiler Equipment
B00765934-I1-BE
07/05/2022
Filed — Alteration
Install (1) new gas fired boiler in basement with expansion tank, hot water piping and flue.
B00765934-I1
05/19/2022
Filed — Alteration
Modification to existing plumbing fixtures and associated piping.
B00573944-P2
05/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/02/2022
Permit issued — Plumbing
B00573944-I1-PL
04/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/25/2022
Objection resolved — Addressed
04/22/2022
Objection raised — Scope
04/19/2022
Filed — Alteration
Modification to existing plumbing fixtures and associated piping.
B00573944-P1
04/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/01/2022
Permit issued — Plumbing
B00573944-I1-PL
01/04/2022
Permit issued — General Construction
B00573825-I1-GC
08/30/2021
Filed — Alteration
Modification to existing plumbing fixtures and associated piping.
B00573944-I1
08/26/2021
Filed — Alteration
B00573825-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSUPERB PLUMBING & HEATING08/25/2022
DOB NOWBoiler EquipmentSigned-offSUPERB PLUMBING & HEATING07/22/2022
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING05/02/2022
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING03/01/2022
DOB NOWGeneral ConstructionSigned-offWMG RENOVATION CORP01/04/2022
1 project · most recent 10/05/2022
General Wiring
FiledStatusContractorScope
10/05/2022CompleteKRIS ELECTRICAL SOLUTIONSGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/29/2022Pass-Final Boiler Equipment InspectionPassView ↗
07/28/2022Pass-Final Boiler Equipment InspectionPassView ↗
05/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/18/2022Heating SystemsYoung Suhspecial
08/18/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
08/08/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
08/08/2022Heating SystemsYoung Suhspecial
07/29/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
07/29/2022Heating SystemsYoung Suhspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00573825-I1Request digital key ↗
09/01/2026B00573944-P2Request digital key ↗
09/01/2026B00573944-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B00573944-I1Open ↗
08/13/2026B00573944-P2Open ↗
08/13/2026B00573825-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00573825-I1Open ↗
09/01/2026B00573944-I1Open ↗
09/01/2026B00573944-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00765934-S1Open ↗
09/23/2026B00765934-I1Open ↗
09/01/2026B00765934-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00573825-I1Open ↗
09/01/2026B00573944-I1Open ↗
09/01/2026B00573944-P2Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/01/2026B00573825-I1Open ↗
09/01/2026B00573944-I1Open ↗
09/01/2026B00573944-P2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026B00765934-I1Open ↗
08/13/2026B00765934-P1Open ↗