← Back
Elevator apt, fireproof with stores
108 NORFOLK STREET
MANHATTAN · BIN 1075815
💬 Discuss this project
1997Year Built
7Stories
D6Building Class
R7AZoning
21,212 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: NORFOLK APARTMENTS LIMITED PARTNERSHIP · 5,026 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST VILLAGE HOMES HOUSING DEVELOPM607/08/2026
ACE GROUP NY407/08/2026
STANTON NORFOLK INC703/22/2026
NORFOLK APARTMENTS LIMITED PARTNERSHIP703/22/2026
AAFE MANAGEMENT COMPANY I103/22/2026
NORFOLK APARTMENTS LI203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor203/21/2026
KJK ELECTRIC INCElectrical103/22/2026
PETER LIElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
A.A.D. CONSTRUCTION CORPGeneral Contractor107/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
JOHN DICAPUAElectrical103/21/2026
ROYAL CONSTRUCTION ASSOCIATESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513212/21/2022
CHEN ENGINEERING SERVICES1826108/22/2022
URBAN ARCHITECTURAL INITI8064103/05/2021
Building Lifecycle
All (101)Filed (6)Permit Issued (4)Signed Off (3)Facade (FISP) (17)Violation (29)Objection (22)Special Inspection (20)
07/30/2024
Cycle 9 facade report signed — SAFE
07/18/2024
Cycle 9 facade inspection completed
05/30/2024
Cycle 9 facade report submitted
02/08/2024
Violation issued (HPD, closed)
C
01/25/2024
Cycle 9 facade report submitted
01/19/2024
Cycle 9 facade inspection completed
11/20/2023
Violation issued (ECB, open)
Construction
11/12/2023
Cycle 8 facade report submitted
11/08/2023
Cycle 8 facade report signed — SAFE
09/22/2023
Cycle 8 facade inspection completed
08/04/2023
Violation issued (HPD, closed)
A
08/04/2023
Violation issued (HPD, closed)
C
07/18/2023
Violation issued (HPD, closed)
A
05/22/2023
Signed off — Alteration
PROPOSE PARAPET WALL REPLACEMENT AND FACADE CRACK REPAIR, REPOINTING, BRICK PINING WORKS BETWEEN 7TH FL TO ROOF AS SHOWN ON PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY,
M00780033-I1
01/13/2023
Filed — Alteration
M00812577-I1
01/13/2023
Permit issued — Sidewalk Shed
M00812577-I1-SH
12/22/2022
Signed off — Alteration
INSTALL NEW MINI SPLIT A/C SYSTEMS AT CELLAR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
M08025006-I1
12/21/2022
Filed — Alteration
INSTALL NEW MINI SPLIT A/C SYSTEMS AT CELLAR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
M08025006-P2
12/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
12/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
12/21/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
12/21/2022
Special inspection requirement — Mechanical Systems
DEZHANG FANG
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
12/21/2022
Special inspection requirement — Final
DEZHANG FANG
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
12/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
12/19/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
12/19/2022
Special inspection requirement — Final
DEZHANG FANG
12/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
12/19/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
12/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
12/19/2022
Special inspection requirement — Mechanical Systems
DEZHANG FANG
11/09/2022
Permit issued — Mechanical Systems
M08025006-I1-MS
10/21/2022
Filed — Alteration
INSTALL NEW MINI SPLIT A/C SYSTEMS AT CELLAR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
M08025006-I1
09/27/2022
Permit issued — Structural
M00780033-I1-ST
08/22/2022
Filed — Alteration
PROPOSE PARAPET WALL REPLACEMENT AND FACADE CRACK REPAIR, REPOINTING, BRICK PINING WORKS BETWEEN 7TH FL TO ROOF AS SHOWN ON PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY,
M00780033-I1
01/31/2022
Signed off — Alteration
PROPOSED GENERAL CONSTRUCTION WORKS WITH MINOR PARTITION, INTERIOR FINISHED WORKS AT GROUND OFFICE SPACE PER PLAN. NO CHANGE IN USE,EGRESS, AND OCCUPANCY.
M00475551-I1
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (ECB, closed)
Local Law
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/10/2021
Permit issued — General Construction
M00475551-I1-GC
04/29/2021
Objection resolved — Addressed
04/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jorge Chang
04/29/2021
Special inspection requirement — Final
Jorge Chang
04/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jorge Chang
04/27/2021
Objection raised — Other
04/27/2021
Objection resolved — Addressed
04/27/2021
Objection raised — Other
04/26/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/19/2021
Objection raised — Other
04/19/2021
Objection raised — Other
04/19/2021
Objection raised — Energy
04/19/2021
Objection raised — Inspections
04/19/2021
Objection raised — Scope
04/15/2021
Filed — Alteration
PROPOSED GENERAL CONSTRUCTION WORKS WITH MINOR PARTITION, INTERIOR FINISHED WORKS AT GROUND OFFICE SPACE PER PLAN. NO CHANGE IN USE,EGRESS, AND OCCUPANCY.
M00475551-P1
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP01/13/2023
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION11/09/2022
DOB NOWStructuralSigned-offROYAL CONSTRUCTION ASSOCI09/27/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP06/10/2021
BISOTISSUEDFULL CIRCLE CONST OF NY L04/03/2014
BISPLISSUEDFULL CIRCLE PLUMBING CORP.04/03/2014
BISSDISSUEDRO-SAL PLUMBING & HTG INC INC.12/10/1998
BIS—ISSUEDTREK CONST.CORP.06/04/1998
BISEQISSUEDTREK CONST.CORP.04/27/1998
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.02/24/1998
BIS—ISSUEDTREK CONST.CORP.02/03/1998
BISEQISSUEDTREK CONST.CORP.02/03/1998
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.11/19/1997
BIS—ISSUEDTREK CONST.CORP.10/29/1997
BISEQISSUEDTREK CONST.CORP.10/29/1997
BISEQISSUEDTREK CONST.CORP.10/29/1997
4 projects · most recent 06/30/2023
General Wiring
FiledStatusContractorScope
06/30/2023CompleteROBERT CHIMENTI11 meters, 1 new_meters
12/01/2022CompleteKJK ELECTRIC INCGeneral Wiring
01/10/2019CompleteP.L. ELEC'L CONTR'G CORP—
08/03/2018CancelledCAPUTEK ELEC'L SERVICES,—
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/21/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
12/21/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
12/21/2022Maintenance informationDEZHANG FANGenergy_progress
12/21/2022Mechanical SystemsDEZHANG FANGspecial
12/21/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
12/21/2022FinalDEZHANG FANGprogress
12/21/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
12/19/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
12/19/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
12/19/2022FinalDEZHANG FANGprogress
12/19/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
12/19/2022Maintenance informationDEZHANG FANGenergy_progress
12/19/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
12/19/2022Mechanical SystemsDEZHANG FANGspecial
04/29/2021Fire-Resistant Penetrations and JointsJorge Changspecial
04/29/2021FinalJorge Changprogress
04/29/2021Fire-Resistance Rated ConstructionJorge Changprogress
04/08/2021Fire-Resistance Rated ConstructionJorge Changprogress
04/08/2021FinalJorge Changprogress
04/08/2021Fire-Resistant Penetrations and Joints—special
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/02/2026M00780033-I1Request digital key ↗
09/01/2026M08025006-P2Request digital key ↗
09/01/2026M08025006-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/15/2026M00475551-P1Request digital key ↗
08/14/2026M00475551-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
04/07/2014121963875Open ↗
04/07/2014121963875Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/02/2014121963875Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M08025006-I1Open ↗
09/01/2026M08025006-I1Open ↗
08/24/2026M08025006-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/04/2026M00475551-I1Open ↗
09/02/2026M00780033-I1Open ↗
09/01/2026M08025006-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M08025006-I1Open ↗
08/24/2026M08025006-P2Open ↗
08/23/2026M00475551-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/02/2014121963875Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/02/2014121963875Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/02/2014121963875Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
04/16/2014121963875Open ↗
04/16/2014121963875Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/02/2014121963875Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/02/2014121963875Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026M00780033-I1Open ↗
09/01/2026M08025006-I1Open ↗
09/01/2026M08025006-P2Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M08025006-I1Open ↗
08/13/2026M08025006-P2Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/02/2014121963875Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/02/2014121963875Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/14/2026M00475551-I1Open ↗
08/13/2026M00475551-P1Open ↗