← Back
Predominantly retail with other uses
108 STARR STREET
BROOKLYN · BIN 3072735
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R6Zoning
3,955 sfGross Floor Area
2Units
6 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · 3,000 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
Architecture
Floor 22p · 1 filing · 3 docs
Floor 1
Cellar2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC105/07/2025
ROSINI ENGINEERING, PC204/01/2022
REXRODE CHIRIGOS ARCHITECTS103/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244105/07/2025
Building Lifecycle
All (33)Filed (4)Permit Issued (1)Signed Off (1)Violation (9)Objection (4)Special Inspection (14)
09/09/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01219289-I1
05/12/2025
Permit issued — Solar
B01219289-I1-SL
05/07/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01219289-I1
05/01/2025
Special inspection requirement — Final
NARESH MAHANGU
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/01/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/2022
Objection raised — Structural
04/04/2022
Objection resolved — Addressed
04/04/2022
Objection raised — Accessibility
04/04/2022
Objection resolved — Addressed
04/01/2022
Filed — Alteration
Modification to existing mechanical, HVAC units and associated ductwork/exhaust grilles. AC Unit to be installed on existing dunnage at parapet, refrigerant lines running up to roof.
B00683721-I1
04/01/2022
Filed — Alteration
Modification to existing plumbing and gas fixtures and associated piping.
B00683723-I1
03/28/2022
Filed — Alteration
Renovation including modification to interior non-load bearing partitions, doors, finishes, remove and replace existing window, bars & brick masonry.
B00683713-I1
02/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
02/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
02/24/2022
Special inspection requirement — Maintenance information
02/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
02/18/2022
Special inspection requirement — Interior lighting power
02/18/2022
Special inspection requirement — Lighting controls
02/18/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
02/18/2022
Special inspection requirement — Fenestration air leakage
02/18/2022
Special inspection requirement — Final
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/23/2010
Violation issued (FDNY_NOV, closed)
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/12/2007
Violation issued (FDNY_NOV, closed)
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC05/12/2025
BISPLISSUEDJ V PIEPER AND SPROTTE INC07/07/1998
1 project · most recent 04/01/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/01/2022——Air Conditioning Systems
Cooling
— ARUM144BTEF 144,000 BTU · Condensing Unit ×1
1 project · most recent 04/01/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/01/2022——Gas, Water/Sanitary
1 project · most recent 05/07/2025
FiledStatusContractorScope
05/07/2025CompleteBROOKYLN SOLARWORKS, LLC—
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/01/2025FinalNARESH MAHANGUprogress
05/01/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/01/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/01/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/01/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
02/24/2022HVAC-R and service water heating equipment—energy_progress
02/24/2022HVAC-R and service water heating system controls—energy_progress
02/24/2022Maintenance information—energy_progress
02/24/2022HVAC-R and service water piping design and insulation—energy_progress
02/18/2022Interior lighting power—energy_progress
02/18/2022Lighting controls—energy_progress
02/18/2022Fenestration and door U-factor and product ratings—energy_progress
02/18/2022Fenestration air leakage—energy_progress
02/18/2022Final—progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/30/2026B00683721-I1Request digital key ↗
08/30/2026B00683723-I1Request digital key ↗
08/21/2026B01219289-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
08/06/2009320036901Open ↗
06/29/2009320036901Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/30/2026B00683721-I1Open ↗
08/13/2026B01219289-I1Open ↗
08/13/2026B00683713-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/19/2026B01219289-I1Open ↗
09/19/2026B01219289-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/29/2009320036901Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/19/2026B01219289-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/29/2009320036901Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/29/2009320036901Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/30/2026B00683721-I1Open ↗
08/13/2026B01219289-I1Open ↗
08/13/2026B00683723-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
09/25/2009320036901Open ↗
07/31/2009320036901Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE2
08/10/2009320036901Open ↗
08/06/2009320036901Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/29/2009320036901Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01219289-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/29/2009320036901Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/29/2009320036901Open ↗