← Back
BuildNYC
Home for indigent children, aged, homeless
108 WEST 124TH STREET
MANHATTAN · BIN 1057791
💬 Discuss this project
1910Year Built
5Stories
N2Building Class
C4-4Zoning
10,320 sfGross Floor Area
1Units
Rent Stabilized4 Active Violations 3 unresolved · 1 paperwork only 5 likely answered ▸FDNY Report ↗
Home for indigent children, aged, homeless · 2,775 sf lot · 3.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Jewish Board1p · 1 filing · 17 docs
BulkheadThe Jewish Board1p · 1 filing · 17 docs
CellarThe Jewish Board1 filing · 20 docs
Site & exteriorThe Jewish Board4p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fegs Real Estate203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG209/26/2025
Ola Consulting Engineers408/22/2025
FL&M Engineering Design & Inspection107/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147803/21/2026
AE Design Solution203/21/2026
Millennium Designs of New York103/21/2026
EDG203/21/2026
Millennium Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Penta Restorationspecialty_contractor304/09/2026
R.C.M. ElectricElectrical203/21/2026
Asr EngineeringElectrical103/21/2026
Nash Electric ServicesElectrical103/21/2026
Centennial Elevator IndustriesElectrical103/21/2026
MC SuperstructureScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578209/26/2025
Vibranalysis Inc., Dba VT6864508/22/2025
Philibert Engineering223108/21/2024
Building Lifecycle
All (99)Filed (8)Permit Issued (5)Signed Off (3)Violation (60)Objection (2)Special Inspection (21)
01/31/2026
Violation issued (HPD, closed)
C
01/28/2026
Signed off — Alteration
Installation of suspended scaffold for facade work or inspection
M01086927-I1
01/27/2026
Permit issued — Suspended Scaffold
M01086927-I1-SC
01/07/2026
Signed off — Alteration
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01067513-I1
12/09/2025
Violation issued (ECB, closed)
Elevators
10/23/2025
Special inspection requirement — Masonry
Anthony Stasio
10/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
JUAN GOMEZ
10/23/2025
Special inspection requirement — Final
Anthony Stasio
10/23/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
10/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
09/26/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01067513-P1
09/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/25/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
09/25/2025
Special inspection requirement — Masonry
Anthony Stasio
09/25/2025
Special inspection requirement — Final
Anthony Stasio
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
08/22/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01268903-S2
08/22/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01268903-S1
08/22/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01268903-S3
08/22/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01268903-I1
08/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
JUAN GOMEZ
08/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
JUAN GOMEZ
08/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/11/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
08/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
08/11/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
08/11/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
08/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
08/08/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/01/2025
Permit issued — Structural
M01067513-I1-GC-CX
06/06/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01083754-I1
08/28/2024
Permit issued — Suspended Scaffold
M01086927-I1-SC
08/27/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Other
08/23/2024
Permit issued — Structural
M01067513-I1-GC-CX
08/21/2024
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01086927-I1
07/31/2024
Permit issued — Sidewalk Shed
M01083754-I1-SH
07/30/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01083754-I1
07/15/2024
Filed — Alteration
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01067513-I1
05/26/2024
Violation issued (FDNY_NOV, closed)
04/03/2024
Violation issued (FDNY_NOV, closed)
02/12/2024
Violation issued (FDNY_NOV, closed)
12/25/2023
Violation issued (FDNY_NOV, closed)
08/01/2023
Violation issued (FDNY_NOV, closed)
11/02/2022
Violation issued (HPD, closed)
I
09/24/2021
Violation issued (ECB, closed)
Elevators
04/02/2021
Violation issued (HPD, closed)
A
11/20/2020
Violation issued (FDNY_NOV, closed)
09/10/2020
Violation issued (FDNY_NOV, closed)
08/07/2020
Violation issued (FDNY_NOV, closed)
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2019
Violation issued (ECB, closed)
Construction
03/22/2019
Violation issued (ECB, open)
Construction
11/09/2017
Violation issued (HPD, closed)
I
10/30/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2017
Violation issued (FDNY_ORDER, closed)
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPenta Restoration01/27/2026
DOB NOWStructuralSigned-offPenta Restoration08/01/2025
DOB NOWSuspended ScaffoldSigned-offPenta Restoration08/28/2024
DOB NOWStructuralSigned-offPenta Restoration08/23/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure07/31/2024
BISPLISSUEDMedco Plumbing03/21/1995
BISSPISSUEDMedco Plumbing11/07/1994
BIS—ISSUEDUnited General Construction09/01/1994
BISFPISSUEDFire Command Co06/08/1994
BISSPISSUEDMedco Plumbing02/02/1994
BISPLISSUEDMedco Plumbing02/02/1994
BIS—ISSUEDUnited General Construction08/19/1993
BIS—ISSUEDUnited General Construction03/30/1993
1 project · most recent 08/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/22/2025——Gas, Water/Sanitary
2 projects · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteNash Electric Services—
07/20/2020Permit IssuedCentennial Elevator IndustriesGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
10/23/2025MasonryAnthony Stasiospecial
10/23/2025Tenant Protection Plan ComplianceJUAN GOMEZspecial
10/23/2025FinalAnthony Stasioprogress
10/23/2025Post-installed AnchorsAnthony Stasiospecial
10/23/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
09/26/2025Tenant Protection Plan Compliance—special
09/25/2025Post-installed AnchorsAnthony Stasiospecial
09/25/2025MasonryAnthony Stasiospecial
09/25/2025FinalAnthony Stasioprogress
09/25/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
08/21/2025Tenant Protection Plan ComplianceJUAN GOMEZspecial
08/21/2025Tenant Protection Plan ComplianceJUAN GOMEZspecial
08/21/2025HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
08/11/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/11/2025Maintenance informationJUAN GOMEZenergy_progress
08/11/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
08/11/2025Post-installed AnchorsJUAN GOMEZspecial
08/11/2025Heating SystemsJUAN GOMEZspecial
08/11/2025HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
08/08/2025Post-installed AnchorsJUAN GOMEZspecial
08/08/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Jewish BoardBase Building / Common AreasCellar
Project M01268903 Alteration · Approved · 08/22/2025
Project M01067513 Alteration · LOC Issued · 07/15/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026M01083754-I1Request digital key ↗
08/26/2026M01086927-I1Request digital key ↗
08/21/2026M01268903-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026M01067513-P1Open ↗
09/25/2026M01067513-P1Open ↗
09/25/2026M01067513-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026M01083754-I1Open ↗
08/13/2026M01067513-I1Open ↗
08/13/2026M01268903-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/25/2026M01067513-P1Open ↗
08/27/2026M01268903-S3Open ↗
08/27/2026M01268903-S3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026M01268903-S2Open ↗
08/13/2026M01268903-I1Open ↗
08/13/2026M01067513-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026M01067513-P1Open ↗
08/13/2026M01268903-S1Open ↗
08/13/2026M01268903-S2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01086927-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01086927-I1Open ↗