← Back
Three families
108 WEST WASHINGTON PLCE
MANHATTAN · BIN 1010215
💬 Discuss this project
1833Year Built
3Stories
C0Building Class
R6Zoning
3,528 sfGross Floor Area
3Units
0 Open Violations
Three families · Owner of record: THE ROBIN GREEN TRUST DATED 9/8/2000 · 1,575 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 22p · 1 filing · 11 docs
Floor 1Under Construction3p · 2 filings · 15 docs
CellarUnder Construction8p · 4 filings · 20 docs
Basement2p · 1 filing · 11 docs
Sub-BasementUnder Construction3p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE ROBIN GREEN TRUST DATED 9/8/2000103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VINCENT J. LIOTTA P.E.206/30/2025
GREGORY ZACK ARCHITECT306/26/2025
MARTOS ENGINEERING206/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAMILTON WOODWORKS LLCGeneral Contractor406/27/2026
MC CREADY & RICE PLBG INC.Plumbing207/17/2026
MOREAIR MECHANICAL SERVICGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974306/30/2025
CHRISTIAN L. MARTOS ENGIN5965206/26/2025
Building Lifecycle
All (44)Filed (7)Permit Issued (7)Signed Off (2)Violation (2)Inspection (5)Objection (8)Special Inspection (13)
08/12/2026
Signed off — Alteration
MINOR STEEL SUPPORT. Creation and expansion of openings in interior wood bearing wall. FOOTING & POST No change to use, egress or occupancy.
M01208954-I1
07/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/20/2026
Signed off — Alteration
Installation of Toilet/kitchen Exhaust Fans in existing duplex apartment (Unit 1) on basement and 1st floor. No change to use, egress or occupancy.
M01217013-I1
07/16/2026
Permit issued — Plumbing
M01210546-I1-PL
06/23/2026
Permit issued — Structural
M01208954-I1-ST
06/23/2026
Permit issued — General Construction
M01208481-I1-GC
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2025
Permit issued — Mechanical Systems
M01217013-I1-MS
08/04/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
08/04/2025
Special inspection requirement — Final
Vincent Liotta
07/30/2025
Permit issued — Plumbing
M01210546-I1-PL
07/22/2025
Permit issued — Structural
M01208954-I1-ST
07/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
07/17/2025
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
07/17/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Christian Martos
07/17/2025
Special inspection requirement — Masonry
Christian Martos
07/17/2025
Special inspection requirement — Structural Steel - Details
Christian Martos
07/17/2025
Special inspection requirement — Final
Christian Martos
07/17/2025
Special inspection requirement — Structural Wood Frame
Christian Martos
07/17/2025
Special inspection requirement — Structural Steel - Welding
Christian Martos
07/17/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
07/07/2025
Permit issued — General Construction
M01208481-I1-GC
06/30/2025
Filed — Alteration
Installation of Toilet/kitchen Exhaust Fans in existing duplex apartment (Unit 1) on basement and 1st floor. No change to use, egress or occupancy.
M01217013-P1
06/26/2025
Filed — Alteration
MINOR STEEL SUPPORT. Creation and expansion of openings in interior wood bearing wall. FOOTING & POST No change to use, egress or occupancy.
M01208954-P1
06/26/2025
Filed — Alteration
New powder room and laundry sink, replacement of kitchen fixtures in existing duplex apartment. No change to use, egress or occupancy.
M01210546-P1
06/25/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/25/2025
Special inspection requirement — Final
Vincent Liotta
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Admin
05/29/2025
Objection raised — Scope
05/29/2025
Objection raised — Structural
05/27/2025
Objection resolved — Addressed
05/23/2025
Objection raised — Admin
05/09/2025
Filed — Alteration
MINOR STEEL SUPPORT. Creation and expansion of openings in interior wood bearing wall. FOOTING & POST No change to use, egress or occupancy.
M01208954-I1
05/08/2025
Filed — Alteration
Installation of Toilet/kitchen Exhaust Fans in existing duplex apartment (Unit 1) on basement and 1st floor. No change to use, egress or occupancy.
M01217013-I1
05/08/2025
Filed — Alteration
New powder room and laundry sink, replacement of kitchen fixtures in existing duplex apartment. No change to use, egress or occupancy.
M01210546-I1
05/08/2025
Filed — Alteration
RENOVATION OF DUPLEX APARTMENT IN BASEMENT & 1ST FLOOR AS PER PLANS. REPLACEMENT OF KITCHEN CABINETS & APPLIANCES. NEW POCKET DOOR. REPLACEMENT KITCHEN WINDOW. NEW POWDER ROOM. MINOR WORK CELLAR LAUNDRY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01208481-I1
10/28/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMC CREADY & RICE PLBG INC.07/16/2026
DOB NOWStructuralSigned-offHAMILTON WOODWORKS LLC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedHAMILTON WOODWORKS LLC06/23/2026
DOB NOWMechanical SystemsSigned-offMOREAIR MECHANICAL SERVIC08/08/2025
DOB NOWPlumbingPermit IssuedMC CREADY & RICE PLBG INC07/30/2025
DOB NOWStructuralSigned-offHAMILTON WOODWORKS07/22/2025
DOB NOWGeneral ConstructionPermit IssuedHAMILTON WOODWORKS07/07/2025
BISPLISSUEDAMOK INC01/08/1998
BISOTISSUEDKLUSKA CONSTRUCTION CORP12/16/1997
1 project · most recent 06/30/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2025Signed-offMOREAIR MECHANICAL SERVICVentilation Systems
Ventilation
Panasonic FV-0511VF1 110 CFM · Exhaust Fan ×15
1 project · most recent 06/26/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/26/2025Permit IssuedMC CREADY & RICE PLBG INCGas, Water/Sanitary
1 project · most recent 07/17/2025
General Wiring
FiledStatusContractorScope
07/17/2025Permit IssuedULTIMATE ELECTL CONTG INCGeneral Wiring
1 project · most recent 06/26/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/26/2025Signed-offHAMILTON WOODWORKS LLCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/04/2025Mechanical SystemsVincent Liottaspecial
08/04/2025FinalVincent Liottaprogress
07/17/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
07/17/2025Concrete - Cast-In-PlaceChristian Martosspecial
07/17/2025Construction Utilizing CLT or SCL, Type IVChristian Martosspecial
07/17/2025MasonryChristian Martosspecial
07/17/2025Structural Steel - DetailsChristian Martosspecial
07/17/2025FinalChristian Martosprogress
07/17/2025Structural Wood FrameChristian Martosprogress
07/17/2025Structural Steel - WeldingChristian Martosspecial
07/17/2025Post-installed AnchorsChristian Martosspecial
06/25/2025Mechanical SystemsVincent Liottaspecial
06/25/2025FinalVincent Liottaprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026M01208481-I1Request digital key ↗
08/23/2026M01208954-I1Request digital key ↗
08/23/2026M01208954-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/13/2026M01217013-P1Open ↗
08/13/2026M01208954-I1Open ↗
08/13/2026M01208481-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026M01210546-I1Open ↗
08/23/2026M01210546-P1Open ↗
08/23/2026M01217013-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M01217013-I1Open ↗
08/27/2026M01208954-I1Open ↗
08/27/2026M01208954-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M01217013-I1Open ↗
08/27/2026M01208954-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026M01210546-P1Open ↗
08/23/2026M01210546-I1Open ↗
08/23/2026M01217013-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents5
▸DOB NOWProof of Historic Building5
08/13/2026M01210546-P1Open ↗
08/13/2026M01208481-I1Open ↗
08/13/2026M01217013-P1Open ↗
Showing 3 of 5 on file for this type