← Back
Public elementary, junior or senior high
Uncommon Kings Cms
1080 LENOX ROAD · BIN 3101840
💬 Discuss this project
1938Year Built
4Stories
W1Building Class
R6Zoning
96,820 sfGross Floor Area
1Units
LL97 Covered9 Open Violations 1 unresolved · 8 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 72,000 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 6 docs
Floor 1Under Construction29p · 1 filing · 20 docs
Cellar4p · 1 filing · 16 docs
Sub-BasementUnder Construction37p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1709/13/2026
NYC DEPARTMENT OF EDUCATION503/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DOE 040703/22/2026
DOE I.S.252703/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
DOE IS252 040303/22/2026
DEPT. OF EDUCATION I.S.25303/22/2026
DOE K 252 040203/22/2026
D.O.E. I.S.252 0103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POPLI DESIGN GROUP608/07/2026
SAVIN ENGINEERS407/24/2026
AK CONSULTING SERVICES, INC304/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
JMV ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CM&E CON, INCGeneral Contractor407/08/2026
ANDRE COLEElectrical103/21/2026
AZIZ ABDULElectrical103/21/2026
CAPIZZO, VITOElectrical103/21/2026
COLE ANDREElectrical103/21/2026
FAJARDO, JOSEElectrical103/21/2026
FERRITO, ROBERTElectrical103/21/2026
SAMCO ELECTRIC CORP.Electrical103/22/2026
ABDUL AZIZElectrical103/21/2026
VARSITY PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317808/07/2026
Building Lifecycle
All (126)Filed (13)Permit Issued (5)Violation (60)Objection (18)Special Inspection (30)
08/07/2026
Filed — Alteration
P.S. 252-K: Subsequent filing of Structural work type. Removal and reconstruction of vault roofs, areaway wall, ramps and miscellaneous concrete repairs.
B01170490-P3
08/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
08/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Walter Kaeck
08/07/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MAXIM KORNGOLD
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/24/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S1
07/23/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S2
07/23/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-I1
07/23/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S3
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
07/22/2026
Special inspection requirement — Post-installed Anchors
07/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/22/2026
Special inspection requirement — Structural Steel - Details
07/22/2026
Special inspection requirement — Subgrade Inspections
07/22/2026
Special inspection requirement — Structural Steel - Welding
07/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Special inspection requirement — Final
06/18/2026
Objection resolved — Addressed
05/26/2026
Special inspection requirement — Interior lighting power
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Protection of exposed foundation insulation
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Lighting controls
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
05/19/2026
Objection resolved — Addressed
05/18/2026
Objection raised — Other
05/18/2026
Objection raised — Other
05/14/2026
Filed — Alteration
P.S. 252-K: Subsequent filing of Structural work type. Removal and reconstruction of vault roofs, areaway wall, ramps and miscellaneous concrete repairs.
B01170490-P2
05/13/2026
Filed — Alteration
P.S. 252-K: Subsequent filing of Structural work type. Removal and reconstruction of vault roofs, areaway wall, ramps and miscellaneous concrete repairs.
B01170490-P1
05/12/2026
Special inspection requirement — Protection of exposed foundation insulation
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Interior lighting power
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Lighting controls
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Structural Steel - Details
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Structural Steel - Welding
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Subgrade Inspections
MAXIM KORNGOLD
04/22/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AND UNDERPINNING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01264203-P1
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
03/09/2026
Violation issued (FDNY_ORDER, closed)
03/09/2026
Violation issued (FDNY_ORDER, closed)
01/28/2026
Permit issued — Plumbing
B01170490-S2-PL
01/16/2026
Permit issued — Structural
B01170490-S1-ST
01/12/2026
Permit issued — General Construction
B01170490-I1-GC
01/06/2026
Permit issued — Support of Excavation
B01264203-I1-SE
12/09/2025
Permit issued — Construction Fence
B01264200-I1-FN
11/29/2025
Objection resolved — Addressed
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
10/09/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Other
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC01/28/2026
DOB NOWStructuralPermit IssuedCM&E CON, INC01/16/2026
DOB NOWGeneral ConstructionPermit IssuedCM&E CON, INC01/12/2026
DOB NOWSupport of ExcavationPermit IssuedCM&E CON, INC01/06/2026
DOB NOWConstruction FencePermit IssuedCM&E CON, INC12/09/2025
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/06/2025
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/06/2025
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/06/2025
BISPLISSUEDVARSITY PLBG AND HTG INC09/17/2024
BISOTISSUEDHIMA GROUP INC08/13/2024
BISOTISSUEDROCON CORP04/10/2024
BISOTISSUEDROCON CORP04/10/2024
BISPLISSUEDROCON CORP04/08/2024
BISMHISSUEDROCON CORP04/08/2024
BISOTISSUEDWHITESTONE CONSTRUCTION CORP12/15/2023
BISOTISSUEDWHITESTONE CONSTRUCTION CORP12/15/2023
BISOTISSUEDWHITESTONE CONSTRUCTION CORP12/15/2023
BISPLISSUEDVARSITY PLBG AND HTG INC09/21/2023
BISOTISSUEDHIMA GROUP INC06/12/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/26/2023
BISOTISSUEDROCON CORP03/28/2023
BISOTISSUEDROCON CORP03/28/2023
BISPLISSUEDROCON CORP03/27/2023
BISBLISSUEDROCON CORP03/27/2023
BISFBISSUEDROCON CORP03/27/2023
BISPLISSUEDVARSITY PLBG AND HTG INC09/27/2022
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/09/2022
BISPLISSUEDFORSYTHE P&H CORP04/15/2022
BISMHISSUEDROCON CORP04/13/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/31/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/31/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/31/2022
BISPLISSUEDROCON CORP03/22/2022
BISBLISSUEDROCON CORP03/22/2022
BISFBISSUEDROCON CORP03/22/2022
BISOTISSUEDROCON CORP03/22/2022
BISOTISSUEDROCON CORP03/22/2022
BISPLISSUEDVARSITY PLBG AND HTG INC09/29/2021
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/19/2021
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/19/2021
+ 15 more permits on file
1 project · most recent 07/24/2026
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026——Refrigeration Systems
Refrigeration
Keeprite KLP207LE 7,607 BTU ×2
Rdt YF10KAE 12,300 BTU · Condensing Unit ×1
2 projects · most recent 08/07/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026Permit IssuedVARSITY PLBG AND HTG INCStorm
07/24/2026——Water/Sanitary
17 projects · most recent 03/11/2026
General Wiring Lighting
FiledStatusContractorScope
03/11/2026Permit IssuedSELECTRIC ELECL CONT CO I—
02/19/2026Permit IssuedSELECTRIC ELECL CONT CO IGeneral Wiring
10/24/2024CompleteEVEREST ELECTRIC CORP—
01/17/2024CompleteSTANCO SYSTEM ELEC'L CONT—
11/08/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/08/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
08/24/2021CompleteCHARAN ELEC'L ENTERP'S IN—
07/16/2021CompleteCHARAN ELEC'L ENTERP'S IN—
04/21/2021CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
08/01/2019CompleteG.S.H. ELECTRIC INC.General Wiring, Lighting
08/01/2019CompleteG.S.H. ELECTRIC INC.General Wiring, Lighting
07/15/2019Permit IssuedR.M.F. ELECTRIC INC.General Wiring
04/09/2019Permit IssuedR.M.F. ELECTRIC INC.General Wiring
03/28/2019Permit IssuedSAMCO ELECTRIC CORP.—
11/28/2018CompleteSAMCO ELECTRIC CORP.—
3 projects · most recent 08/07/2026
Steel Concrete
FiledStatusContractorScope
08/07/2026Permit IssuedVARSITY PLBG AND HTG INCSteel, Concrete
07/24/2026——Steel, Concrete
04/22/2026Permit IssuedCM&E CON, INC3 scope_items
1 project · most recent 09/08/2025
Fence
FiledStatusContractorScope
09/08/2025Permit IssuedCM&E CON, INCFence
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
08/07/2026Subsurface Investigations (Borings/Test Pits)Walter Kaeckspecial
08/07/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMAXIM KORNGOLDspecial
07/22/2026Concrete - Cast-In-Place—special
07/22/2026Post-installed Anchors—special
07/22/2026Structural Steel - High Strength Bolting—special
07/22/2026Structural Steel - Details—special
07/22/2026Subgrade Inspections—special
07/22/2026Structural Steel - Welding—special
07/15/2026Fire-Resistance Rated Construction—progress
07/15/2026Fire-Resistant Penetrations and Joints—special
06/25/2026Final—progress
05/26/2026Interior lighting powerMAXIM KORNGOLDenergy_progress
05/26/2026Protection of exposed foundation insulationMAXIM KORNGOLDenergy_progress
05/26/2026MasonryMAXIM KORNGOLDspecial
05/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
05/26/2026Lighting controlsMAXIM KORNGOLDenergy_progress
05/26/2026Insulation placement and R valuesMAXIM KORNGOLDenergy_progress
05/12/2026Protection of exposed foundation insulationMAXIM KORNGOLDenergy_progress
05/12/2026MasonryMAXIM KORNGOLDspecial
05/12/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
05/12/2026Interior lighting powerMAXIM KORNGOLDenergy_progress
05/12/2026Lighting controlsMAXIM KORNGOLDenergy_progress
05/12/2026Insulation placement and R valuesMAXIM KORNGOLDenergy_progress
05/12/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 252-brooklynEducation—
Project B01264203 Alteration · Permit Entire · 09/08/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026B01264200-I1Request digital key ↗
08/17/2026B01264203-I1Request digital key ↗
08/17/2026B01264203-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
08/14/2019340689758Open ↗
02/18/2014340113530Open ↗
01/17/2014340113530Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWSpecial Inspector Seal & Signature19
08/30/2026B01170490-P3Open ↗
08/30/2026B01170490-P3Open ↗
08/30/2026B01170490-P3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/23/2026B01170490-P1Open ↗
08/23/2026B01170490-P1Open ↗
08/23/2026B01170490-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026B01264203-I1Open ↗
08/17/2026B01264203-P1Open ↗
08/17/2026B01170490-P3Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/15/2019340689758Open ↗
11/12/2010320238319Open ↗
11/12/2010320238319Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE3
12/18/2014340113530Open ↗
09/22/2014340113530Open ↗
06/24/2014340113530Open ↗
▸BISSCHEDULE B - PLUMBING2
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸Safety & Tenant Protection2
▸BISDS1-Demolition Submittal Certification Form1
01/21/2014340091992Open ↗
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B01264200-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/12/2010320238319Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/25/2019340689758Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/17/2014340113530Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/23/2019340689758Open ↗
10/15/2019340689758Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/15/2019340689758Open ↗
11/08/2014340113530Open ↗
▸BISNYCECC ANALYSIS2
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸DOB NOWSOIL REPORT2
08/17/2026B01170490-P3Open ↗
08/13/2026B01170490-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01170490-S2Open ↗
▸Approvals, Objections & Sign-offs33
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/17/2026B01170490-P3Open ↗
08/14/2026B01170490-P1Open ↗
08/14/2026B01170490-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/17/2026B01170490-P3Open ↗
08/14/2026B01170490-P1Open ↗
08/14/2026B01170490-P2Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/06/2019340689758Open ↗
11/15/2019340689758Open ↗
10/23/2019340689758Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026B01264203-I1Open ↗
08/13/2026B01170490-I1Open ↗
08/13/2026B01170490-S2Open ↗
Showing 3 of 4 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/21/2014340091992Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/12/2010320238319Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/15/2019340689758Open ↗
07/25/2019340689758Open ↗
11/08/2014340113530Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM4
12/06/2019340689758Open ↗
12/06/2019340689758Open ↗
11/15/2019340689758Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISEFILING COVER SHEET1
11/12/2010320238319Open ↗
▸BISADDITIONAL INFORMATION1
10/15/2019340689758Open ↗
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
08/17/2026B01264203-P1Open ↗
08/17/2026B01264203-I1Open ↗
08/17/2026B01170490-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01264203-I1Open ↗