← Back
Two family brick
1083 BAY RIDGE PARKWAY
BROOKLYN · BIN 3148532
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5BZoning
1,916 sfGross Floor Area
2Units
Two family brick · 1,277 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 23p · 2 filings · 16 docs
Floor 12p · 2 filings · 16 docs
Cellar4p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2025$1.4M—Private party → Private party$715/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI610/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.P. ELECTRIC INCElectrical103/22/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394310/08/2025
Building Lifecycle
All (21)Filed (6)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (6)
11/20/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, AND COMBINED BOILERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246334-I1
10/20/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246330-I1
10/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
10/08/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246330-P2
10/08/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, AND COMBINED BOILERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246334-P2
08/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, AND COMBINED BOILERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246334-P1
08/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246330-P1
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/12/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
08/11/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/01/2025
Permit issued — Plumbing
B01246334-I1-PL
06/26/2025
Permit issued — General Construction
B01246330-I1-GC
06/25/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, AND COMBINED BOILERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246334-I1
06/25/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246330-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC07/01/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC06/26/2025
1 project · most recent 11/06/2025
General Wiring
FiledStatusContractorScope
11/06/2025CompleteI.P. ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/10/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/10/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/10/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
08/12/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/12/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/12/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01246330-I1Request digital key ↗
08/21/2026B01246330-P2Request digital key ↗
08/21/2026B01246330-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01246330-I1Open ↗
08/21/2026B01246330-P2Open ↗
08/21/2026B01246330-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01246330-P1Open ↗
08/25/2026B01246330-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01246330-P1Open ↗
08/25/2026B01246330-I1Open ↗