Public elementary, junior or senior high
Uncommon Kings Cms
1084 LENOX ROAD · BIN 3101840
💬 Discuss this project
1938Year Built
4Stories
W1Building Class
R6Zoning
96,820 sfGross Floor Area
1Units
LL97 Covered9 Active Violations 0 unresolved · 9 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 72,000 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofI.S. 252-BrooklynUnder Construction5p · 1 filing · 5 docs
Floor 1I.S. 252-BrooklynUnder Construction28p · 2 filings · 20 docs
CellarI.S. 252-Brooklyn1 filing · 12 docs
BasementI.S. 252-BrooklynUnder Construction3p · 1 filing · 20 docs
Sub-BasementI.S. 252-BrooklynUnder Construction36p · 1 filing · 20 docs
Site & exteriorI.S. 252-BrooklynUnder Construction28p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority13210/13/2026
NYC Department of Education1303/22/2026
NYC School203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK Consulting Services409/10/2026
Popli Design Group608/07/2026
Savin Engineers407/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services403/21/2026
JMV Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CM&E ConGeneral Contractor304/09/2026
Elmhurst ElectricElectrical103/21/2026
Aziz AbdulElectrical103/21/2026
S. J. ElectricElectrical103/21/2026
Cole AndreElectrical103/21/2026
R.M.F. ElectricElectrical103/21/2026
Samco ElectricElectrical103/22/2026
CM&E ConScaffold107/08/2026
GT Electrical CompanyElectrical103/21/2026
Varsity Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317909/10/2026
Building Lifecycle
All (127)Filed (14)Permit Issued (5)Violation (60)Objection (18)Special Inspection (30)
09/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AND UNDERPINNING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01264203-P2
09/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Maxim Korngold
09/01/2026
Special inspection requirement — Post-installed Anchors
Maxim Korngold
09/01/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Maxim Korngold
09/01/2026
Special inspection requirement — Concrete - Cast-In-Place
Maxim Korngold
09/01/2026
Special inspection requirement — Underpinning
Maxim Korngold
08/07/2026
Filed — Alteration
P.S. 252-K: Subsequent filing of Structural work type. Removal and reconstruction of vault roofs, areaway wall, ramps and miscellaneous concrete repairs.
B01170490-P3
08/07/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MAXIM KORNGOLD
08/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Walter Kaeck
08/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/24/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S1
07/23/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-I1
07/23/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S3
07/23/2026
Filed — Alteration
Furnish and install 5000 PSI Cast-in place reinforced concrete pad for proposed mechanical equipment, and new steel stairs for areaway.
B01422427-S2
07/22/2026
Special inspection requirement — Structural Steel - Details
07/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/22/2026
Special inspection requirement — Structural Steel - Welding
07/22/2026
Special inspection requirement — Subgrade Inspections
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
07/22/2026
Special inspection requirement — Post-installed Anchors
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/25/2026
Special inspection requirement — Final
06/18/2026
Objection resolved — Addressed
05/26/2026
Special inspection requirement — Lighting controls
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Interior lighting power
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Protection of exposed foundation insulation
MAXIM KORNGOLD
05/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
05/19/2026
Objection resolved — Addressed
05/18/2026
Objection raised — Other
05/18/2026
Objection raised — Other
05/14/2026
Filed — Alteration
P.S. 252-K: Subsequent filing of Structural work type. Removal and reconstruction of vault roofs, areaway wall, ramps and miscellaneous concrete repairs.
B01170490-P2
05/13/2026
Filed — Alteration
P.S. 252-K: Subsequent filing of Structural work type. Removal and reconstruction of vault roofs, areaway wall, ramps and miscellaneous concrete repairs.
B01170490-P1
05/12/2026
Special inspection requirement — Protection of exposed foundation insulation
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Interior lighting power
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Lighting controls
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
05/12/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
04/22/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AND UNDERPINNING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01264203-P1
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
04/14/2026
Violation issued (ECB, open)
Construction
03/09/2026
Violation issued (FDNY_ORDER, closed)
03/09/2026
Violation issued (FDNY_ORDER, closed)
01/28/2026
Permit issued — Plumbing
B01170490-S2-PL
01/16/2026
Permit issued — Structural
B01170490-S1-ST
01/12/2026
Permit issued — General Construction
B01170490-I1-GC
01/06/2026
Permit issued — Support of Excavation
B01264203-I1-SE
12/09/2025
Permit issued — Construction Fence
B01264200-I1-FN
11/29/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating01/28/2026
DOB NOWStructuralPermit IssuedCM&E Con01/16/2026
DOB NOWGeneral ConstructionPermit IssuedCM&E Con01/12/2026
DOB NOWSupport of ExcavationPermit IssuedCM&E Con01/06/2026
DOB NOWConstruction FencePermit IssuedCM&E Con12/09/2025
BISOTISSUEDWhitestone Construction03/06/2025
BISOTISSUEDWhitestone Construction03/06/2025
BISOTISSUEDWhitestone Construction03/06/2025
BISPLISSUEDVarsity Plumbing and Heating09/17/2024
BISOTISSUEDHima Group08/13/2024
BISOTISSUEDRocon04/10/2024
BISOTISSUEDRocon04/10/2024
BISPLISSUEDRocon04/08/2024
BISMHISSUEDRocon04/08/2024
BISOTISSUEDWhitestone Construction12/15/2023
BISOTISSUEDWhitestone Construction12/15/2023
BISOTISSUEDWhitestone Construction12/15/2023
BISPLISSUEDVarsity Plumbing and Heating09/21/2023
BISOTISSUEDHima Group06/12/2023
BISMHISSUEDACS System Associates04/26/2023
BISOTISSUEDRocon03/28/2023
BISOTISSUEDRocon03/28/2023
BISPLISSUEDRocon03/27/2023
BISBLISSUEDRocon03/27/2023
BISFBISSUEDRocon03/27/2023
BISPLISSUEDVarsity Plumbing and Heating09/27/2022
BISMHISSUEDACS System Associates05/09/2022
BISPLISSUEDForsythe P&H04/15/2022
BISMHISSUEDRocon04/13/2022
BISOTISSUEDWhitestone Construction03/31/2022
BISOTISSUEDWhitestone Construction03/31/2022
BISOTISSUEDWhitestone Construction03/31/2022
BISPLISSUEDRocon03/22/2022
BISBLISSUEDRocon03/22/2022
BISFBISSUEDRocon03/22/2022
BISOTISSUEDRocon03/22/2022
BISOTISSUEDRocon03/22/2022
BISPLISSUEDVarsity Plumbing and Heating09/29/2021
BISOTISSUEDWhitestone Construction04/19/2021
BISOTISSUEDWhitestone Construction04/19/2021
+ 15 more permits on file
1 project · most recent 07/24/2026
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026——Refrigeration Systems
Refrigeration
Keeprite KLP207LE 7,607 BTU ×2
Rdt YF10KAE 12,300 BTU · Condensing Unit ×1
2 projects · most recent 08/07/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026Permit IssuedVarsity Plumbing and HeatingStorm
07/24/2026——Water/Sanitary
17 projects · most recent 03/11/2026
General Wiring Lighting
FiledStatusContractorScope
03/11/2026Permit IssuedSelectric Electrical Cont Co I—
02/19/2026Permit IssuedSelectric Electrical Cont Co IGeneral Wiring
10/24/2024CompleteEverest Electric—
01/17/2024CompleteStanco System Electrical Cont—
11/08/2022CompleteCharan Electrical Enterp's—
09/08/2022CompleteCharan Electrical Enterp'sGeneral Wiring
08/24/2021CompleteCharan Electrical Enterp's—
07/16/2021CompleteCharan Electrical Enterp's—
04/21/2021CompleteJ&H Electrical ContGeneral Wiring
08/01/2019CompleteG.S.H. ElectricGeneral Wiring, Lighting
08/01/2019CompleteG.S.H. ElectricGeneral Wiring, Lighting
07/15/2019Permit IssuedR.M.F. ElectricGeneral Wiring
04/09/2019Permit IssuedR.M.F. ElectricGeneral Wiring
03/28/2019Permit IssuedSamco Electric—
11/28/2018CompleteSamco Electric—
3 projects · most recent 09/10/2026
Steel Concrete
FiledStatusContractorScope
09/10/2026Permit IssuedCM&E Con4 scope_items
08/07/2026Permit IssuedVarsity Plumbing and HeatingSteel, Concrete
07/24/2026——Steel, Concrete
1 project · most recent 09/08/2025
Fence
FiledStatusContractorScope
09/08/2025Permit IssuedCM&E ConFence
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/01/2026Structural Stability – Alterations of existing buildingsMaxim Korngoldspecial
09/01/2026Post-installed AnchorsMaxim Korngoldspecial
09/01/2026Excavations - Sheeting, Shoring, and BracingMaxim Korngoldspecial
09/01/2026Concrete - Cast-In-PlaceMaxim Korngoldspecial
09/01/2026UnderpinningMaxim Korngoldspecial
08/07/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMAXIM KORNGOLDspecial
08/07/2026Subsurface Investigations (Borings/Test Pits)Walter Kaeckspecial
08/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
07/22/2026Structural Steel - Details—special
07/22/2026Structural Steel - High Strength Bolting—special
07/22/2026Structural Steel - Welding—special
07/22/2026Subgrade Inspections—special
07/22/2026Concrete - Cast-In-Place—special
07/22/2026Post-installed Anchors—special
07/15/2026Fire-Resistant Penetrations and Joints—special
07/15/2026Fire-Resistance Rated Construction—progress
06/25/2026Final—progress
05/26/2026Lighting controlsMAXIM KORNGOLDenergy_progress
05/26/2026MasonryMAXIM KORNGOLDspecial
05/26/2026Insulation placement and R valuesMAXIM KORNGOLDenergy_progress
05/26/2026Interior lighting powerMAXIM KORNGOLDenergy_progress
05/26/2026Protection of exposed foundation insulationMAXIM KORNGOLDenergy_progress
05/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
05/12/2026Protection of exposed foundation insulationMAXIM KORNGOLDenergy_progress
05/12/2026MasonryMAXIM KORNGOLDspecial
Latest 25 of 42.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 252-BrooklynEducationCellar, Sub-basement, Floor 1
Project B01264200 Alteration · Permit Entire · 09/08/2025
Project B01264203 Alteration · Permit Entire · 09/08/2025
Project B01422427 Alteration · Objections · 07/23/2026
Project B01170490 Alteration · Permit Entire · 01/27/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026B01264200-I1Request digital key ↗
08/17/2026B01264203-P1Request digital key ↗
08/17/2026B01264203-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
08/14/2019340689758Open ↗
02/18/2014340113530Open ↗
01/17/2014340113530Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications55
▸DOB NOWSpecial Inspector Seal & Signature24
10/14/2026B01264203-P2Open ↗
10/14/2026B01264203-P2Open ↗
10/14/2026B01264203-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/14/2026B01264203-P2Open ↗
08/17/2026B01264203-P1Open ↗
08/17/2026B01264203-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/23/2026B01170490-P1Open ↗
08/23/2026B01170490-P1Open ↗
08/23/2026B01170490-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/15/2019340689758Open ↗
11/12/2010320238319Open ↗
11/12/2010320238319Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE3
12/18/2014340113530Open ↗
09/22/2014340113530Open ↗
06/24/2014340113530Open ↗
▸BISSCHEDULE B - PLUMBING2
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸Safety & Tenant Protection2
▸BISDS1-Demolition Submittal Certification Form1
01/21/2014340091992Open ↗
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B01264200-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/12/2010320238319Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/25/2019340689758Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/17/2014340113530Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/23/2019340689758Open ↗
10/15/2019340689758Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/15/2019340689758Open ↗
11/08/2014340113530Open ↗
▸BISNYCECC ANALYSIS2
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸DOB NOWSOIL REPORT2
08/17/2026B01170490-P3Open ↗
08/13/2026B01170490-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01170490-S2Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
10/14/2026B01264203-P2Open ↗
08/17/2026B01170490-P3Open ↗
08/14/2026B01170490-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
10/14/2026B01264203-P2Open ↗
08/17/2026B01170490-P3Open ↗
08/14/2026B01170490-P1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/06/2019340689758Open ↗
11/15/2019340689758Open ↗
10/23/2019340689758Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026B01170490-S2Open ↗
08/13/2026B01264203-I1Open ↗
08/13/2026B01170490-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/21/2014340091992Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/12/2010320238319Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/15/2019340689758Open ↗
07/25/2019340689758Open ↗
11/08/2014340113530Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM4
12/06/2019340689758Open ↗
12/06/2019340689758Open ↗
11/15/2019340689758Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/25/2019340689758Open ↗
01/17/2014340113530Open ↗
10/18/2013340091992Open ↗
▸BISEFILING COVER SHEET1
11/12/2010320238319Open ↗
▸BISADDITIONAL INFORMATION1
10/15/2019340689758Open ↗
▸Other Documents13
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal12
10/14/2026B01264203-P2Open ↗
08/17/2026B01264203-P1Open ↗
08/17/2026B01264203-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01264203-I1Open ↗