← Back
BuildNYC
Two family brick
1084 MACE AVENUE
BRONX · Pelham Gardens · BIN 2051729
💬 Discuss this project
1965Year Built
2Stories
B1Building Class
R4AZoning
2,337 sfGross Floor Area
2Units
Two family brick · 3,742 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering109/25/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor110/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272109/25/2026
Building Lifecycle
10/02/2026
Permit issued — Solar
X01435367-I1-SL
09/25/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01435367-I1
09/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/25/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
7 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service10/02/2026
1 project · most recent 09/25/2026
FiledStatusContractorScope
09/25/2026Permit IssuedSunrun Solar Electl—
1 project · most recent 09/25/2026
FiledStatusContractorScope
09/25/2026Permit IssuedSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/25/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/25/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/23/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/23/2026FinalWalid Abdullaprogress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account