Elevator apt, semi-fireproof without stores
1085 ANDERSON AVENUE
BRONX · BIN 2003149
💬 Discuss this project
1936Year Built
7Stories
D1Building Class
R7-1Zoning
52,110 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: HIGHBRIDGE OWNER, LLC · 15,905 sf lot · 3.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 3 filings · 20 docs
Cellar4p · 1 filing · 13 docs
Basement2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSR CONTRACTOR209/13/2026
KRAUS MANAGEMENT707/08/2026
RENNON CONSTRUCTION407/08/2026
PARADISE CONSTRCTION204/09/2026
NEW YORK CITY HOUSING AUTHORITY203/22/2026
NYC HOUSING AUTH103/22/2026
N Y C HOUSING AUTHORITY403/22/2026
NYCHA 99403/22/2026
NYCHA603/21/2026
ELZEE CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC107/27/2026
MUMTAZ ENTERPRISES103/14/2026
PACE ENGINEERING P.C.104/24/2025
ASHRAF CORP111/21/2022
OCV ARCHITECTS208/04/2021
KNF SERVICES CORP104/08/2021
GURVINDER SINGH111/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS203/21/2026
DANICO SERVICES403/21/2026
SHEIKH EXPEDITING203/21/2026
PS ENGINEERS203/21/2026
RENNON CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RENNON CONSTRUCTION CORPGeneral Contractor707/08/2026
APEX BUILDING COMPANY INCGeneral Contractor603/21/2026
SAHARA CONTRACTING CORPGeneral Contractor307/08/2026
SALVATORE MIRANDAElectrical103/21/2026
LEE, ASTLEYElectrical103/21/2026
GSR CONTRACTOR INCGeneral Contractor107/29/2026
GREGORY, OWENElectrical103/21/2026
ANTHONY LUCIANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899104/24/2025
PACE ENGINEERING P.C.1679104/24/2025
Building Lifecycle
All (145)Filed (10)Permit Issued (16)Signed Off (5)Facade (FISP) (16)Violation (60)Objection (12)Special Inspection (26)
08/12/2026
Violation issued (HPD, open)
C
08/12/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
07/28/2026
Permit issued — Sidewalk Shed
X01428507-I1-SH
07/27/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01428507-I1
06/16/2026
Permit issued — General Construction
X01191763-I1-GC
04/08/2026
Permit issued — General Construction
X01191763-I1-GC
03/23/2026
Permit issued — Protection and Mechanical Methods
X01368851-I1-PMM
03/23/2026
Permit issued — Suspended Scaffold
X01191763-S1-SC
03/14/2026
Filed — Alteration
APPLICATION FILE TO 1NSTALLATION OF DEBRIS CHUTE AT FRONT ELEVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01368851-I1
03/06/2026
Filed — Alteration
X01191763-S1
05/09/2025
Signed off — Alteration
X01090309-I1
05/08/2025
Permit issued — Suspended Scaffold
X01090309-I1-SC
04/24/2025
Filed — Alteration
X01191763-I1
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Baris Acar
04/22/2025
Special inspection requirement — Final
Baris Acar
04/22/2025
Special inspection requirement — Masonry
Baris Acar
04/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Baris Acar
04/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
11/06/2024
Violation issued (HPD, closed)
B
11/06/2024
Violation issued (HPD, closed)
C
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
C
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
A
11/06/2024
Violation issued (HPD, closed)
A
08/31/2024
Violation issued (HPD, closed)
C
08/31/2024
Violation issued (HPD, closed)
B
08/31/2024
Violation issued (HPD, closed)
B
08/19/2024
Permit issued — Suspended Scaffold
X01090309-I1-SC
08/08/2024
Filed — Alteration
X01090309-I1
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2024
Violation issued (ECB, closed)
Construction
04/29/2024
Violation issued (ECB, closed)
Construction
11/15/2023
Violation issued (HPD, closed)
I
09/15/2023
Cycle 9 facade report signed — SAFE
09/12/2023
Cycle 9 facade report submitted
07/26/2023
Cycle 9 facade inspection completed
06/20/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING, REPLACEMENT OF KITCHEN FIXTURES AND APPLIANCES, REPLACEMENT OF D.U LIGHT FIXTURES, NEW MAILBOXES AND NEW FINISHES. ROOF REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00483831-I1
06/07/2023
Signed off — Alteration
X08041752-I1
06/07/2023
Signed off — Alteration
INSTALLATION OF HEAVYDUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
X00492238-I1
04/26/2023
Permit issued — Sidewalk Shed
X00492238-I1-SH
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2023
Permit issued — General Construction
X00483831-I1-GC
12/02/2022
Violation issued (ECB, closed)
Local Law
11/22/2022
Permit issued — Supported Scaffold
X08041752-I1-SF
11/21/2022
Filed — Alteration
X08041752-I1
04/22/2022
Permit issued — Sidewalk Shed
X00492238-I1-SH
03/25/2022
Permit issued — General Construction
X00483831-I1-GC
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2022
Violation issued (HPD, closed)
A
02/02/2022
Special inspection requirement — Air barrier - visual inspection
Richard Vitto
02/02/2022
Special inspection requirement — Fenestration air leakage
Richard Vitto
02/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Vitto
02/02/2022
Special inspection requirement — Lighting controls
Richard Vitto
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC07/28/2026
DOB NOWGeneral ConstructionPermit IssuedSAHARA CONTRACTING CORP06/16/2026
DOB NOWGeneral ConstructionPermit IssuedSAHARA CONTRACTING CORP04/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAHARA CONTRACTING CORP03/23/2026
DOB NOWSuspended ScaffoldPermit IssuedSAHARA CONTRACTING CORP03/23/2026
DOB NOWSuspended ScaffoldPermit IssuedHONEYBEE SERVICES INC05/08/2025
DOB NOWSuspended ScaffoldPermit IssuedHONEYBEE SERVICES INC08/19/2024
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP04/26/2023
DOB NOWGeneral ConstructionSigned-offAPEX BUILDING COMPANY INC03/27/2023
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP11/22/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP04/22/2022
DOB NOWGeneral ConstructionSigned-offAPEX BUILDING COMPANY INC03/25/2022
DOB NOWGeneral ConstructionSigned-offAPEX BUILDING COMPANY INC06/25/2021
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP04/09/2021
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP11/20/2019
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP11/02/2018
BISOTISSUEDAPEX BUILDING COMPANY INC03/28/2023
BISOTISSUEDAPEX BUILDING COMPANY INC12/20/2022
BISOTISSUEDAPEX BUILDING COMPANY INC08/10/2021
BISOTISSUEDAPEX BUILDING COMPANY INC08/01/2019
BISOTISSUEDAPEX BUILDING COMPANY INC04/10/2019
BISPLISSUEDDPH PLUMBING & HTG CORP03/26/2019
BISEQISSUEDMETROPOLITAN ENTERPR INC05/24/2011
BISEQISSUEDMETROPOLITAN ENTERPR INC06/10/2010
BISEQISSUEDMBR CONTRACTING INC11/27/2009
BISOTISSUEDZORIA HOUSING, LLC09/25/2009
BISEQISSUEDM.B.R. CONTRACTING INC07/13/2009
BISOTISSUEDELZEE CONSTRUCTION INC.07/23/1996
BISOTISSUEDELZEE CONSTRUCTION INC.07/23/1996
BIS—ISSUEDELZEE CONST. INC.09/05/1995
BIS—ISSUEDELZEE CONST. INC.09/07/1994
BISPLISSUEDT.M.J. PLUMBING & HEATING06/17/1994
BIS—ISSUEDELZEE CONST. INC.01/10/1994
BISEQISSUEDELZEE CONST. INC.01/10/1994
5 projects · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026Permit IssuedRICHARD NEU—
01/13/2022Permit IssuedDISCOVER ELEC COMPANY INCGeneral Wiring
11/16/2021Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
05/19/2021CompleteJAM ELECTRICAL CORP—
10/27/2018CompleteWCK ELECTRIC CORP.—
1 project · most recent 07/27/2026
Sidewalk Shed
FiledStatusContractorScope
07/27/2026Permit IssuedGSR CONTRACTOR INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/23/2025Energy Code Compliance InspectionsBaris Acarprogress
04/22/2025FinalBaris Acarprogress
04/22/2025MasonryBaris Acarspecial
04/22/2025Structural Stability – Alterations of existing buildingsBaris Acarspecial
04/22/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
02/02/2022Air barrier - visual inspectionRichard Vittoenergy_progress
02/02/2022Fenestration air leakageRichard Vittoenergy_progress
02/02/2022Fenestration and door U-factor and product ratingsRichard Vittoenergy_progress
02/02/2022Lighting controlsRichard Vittoenergy_progress
02/02/2022FinalRichard Vittoprogress
02/02/2022Fire-Resistance Rated ConstructionRichard Vittoprogress
02/02/2022Energy Code Compliance InspectionsRichard Vittoprogress
02/02/2022Fenestration areasRichard Vittoenergy_progress
02/02/2022Lighting in dwelling unitsRichard Vittoenergy_progress
02/02/2022Interior lighting powerRichard Vittoenergy_progress
07/28/2021Lighting in dwelling unitsRichard Vittoenergy_progress
07/28/2021Energy Code Compliance InspectionsRichard Vittoprogress
07/28/2021FinalRichard Vittoprogress
07/28/2021Fire-Resistance Rated ConstructionRichard Vittoprogress
07/28/2021Fenestration air leakageRichard Vittoenergy_progress
07/28/2021Air barrier - visual inspectionRichard Vittoenergy_progress
07/28/2021Fenestration and door U-factor and product ratingsRichard Vittoenergy_progress
07/28/2021Fenestration areasRichard Vittoenergy_progress
07/28/2021Lighting controlsRichard Vittoenergy_progress
07/28/2021Interior lighting powerRichard Vittoenergy_progress
Latest 25 of 26.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026X00091484-I1Request digital key ↗
08/25/2026X00492238-I1Request digital key ↗
08/25/2026X00483831-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION10
08/19/2022240290038Open ↗
10/15/2020240290038Open ↗
08/07/2019240234153Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION9
08/10/2021240290038Open ↗
08/01/2019240241298Open ↗
04/12/2019240234153Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
03/05/2020240234153Open ↗
08/01/2019240241298Open ↗
11/01/2010220017185Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00483831-P1Open ↗
08/25/2026X00483831-I1Open ↗
08/23/2026X08041752-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X01191763-I1Open ↗
08/31/2026X00483831-I1Open ↗
08/31/2026X00483831-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/11/2010220067077Open ↗
07/11/2009220017185Open ↗
07/10/2009220017817Open ↗
▸BISAPPLICANT OWNER SIGNATURE3
10/15/2020240290038Open ↗
11/09/2018240241298Open ↗
09/04/2018240234153Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/11/2010220067077Open ↗
07/11/2009220017185Open ↗
07/10/2009220017817Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X01191763-I1Open ↗
09/01/2026X01191763-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
08/07/2019240234153Open ↗
09/04/2018240234153Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
10/15/2020240290038Open ↗
11/09/2018240241298Open ↗
09/27/2018240234153Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00483831-P1Open ↗
08/17/2026X01191763-I1Open ↗
08/15/2026X00483831-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/11/2010220067077Open ↗
07/10/2009220017817Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/09/2018240241298Open ↗
09/04/2018240234153Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/10/2021240290038Open ↗
▸BISASBESTOS INSPECTION REPORT1
07/11/2009220017185Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/01/2022240290038Open ↗
10/15/2020240290038Open ↗
09/28/2018240234153Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/05/2020240234153Open ↗
08/01/2019240241298Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/05/2020240234153Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/31/2023240290038Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/31/2023240290038Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00483831-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/28/2022240290038Open ↗
10/15/2020240290038Open ↗
11/09/2018240241298Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/31/2023240290038Open ↗
▸BISMASONRY1
08/31/2023240290038Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/31/2023240290038Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/25/2026X00483831-P1Open ↗
08/17/2026X01191763-I1Open ↗
08/17/2026X01191763-S1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/01/2023240290038Open ↗
03/05/2020240234153Open ↗
11/01/2010220017185Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/28/2022240290038Open ↗
07/14/2009220017185Open ↗
07/14/2009220017185Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
06/11/2010220067077Open ↗
07/10/2009220017817Open ↗
07/10/2009220017185Open ↗
▸BISFINAL1
08/31/2023240290038Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
10/15/2020240290038Open ↗
03/05/2020240234153Open ↗
12/05/2018240241298Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/31/2023240290038Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
09/28/2022240290038Open ↗
12/05/2018240241298Open ↗
11/23/2018240241298Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/15/2020240290038Open ↗
11/09/2018240241298Open ↗
09/04/2018240234153Open ↗
▸BISEFILING COVER SHEET2
06/11/2010220067077Open ↗
07/10/2009220017817Open ↗
▸BISBOROUGH INTAKE FORM1
03/05/2020240234153Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/13/2026X01090309-I1Open ↗
08/13/2026X01191763-S1Open ↗
▸DOB NOWCalculations2
08/13/2026X01090309-I1Open ↗
08/13/2026X01191763-S1Open ↗
▸BISSupporting Document: Fee Exempt1
09/28/2022240290038Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/28/2010220017817Open ↗