Single or multiple dwelling with stores or offices
1086 DEKALB AVENUE
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3043294
💬 Discuss this project
1931Year Built
4Stories
S9Building Class
R6AZoning
4,800 sfGross Floor Area
6Units
Rent Stabilized10 Open Violations 9 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: HL DEKALB PROPERTIES LLC. · 1,600 sf lot · 3 FAR built · Flood zone X
Locations of Work
Electrical
Floor 31p · 1 filing · 7 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HL DEKALB PROPERTIES LLC.103/22/2026
1086 DEKALB CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2025$2.1M—Private party → HL DEKALB PROPERTIES LLC.$438/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HALO ARCHITECTURE PLLC201/22/2026
CHK PLUS INC201/13/2026
CLIP ARCHITECTS501/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREEN CITY BOX TRANS INCGeneral Contractor504/09/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HALO ARCHITECTURE PLLC8021201/22/2026
CHK PLUS INC.9667201/13/2026
GREAT WALL CONSULTANT P.E5633501/08/2026
Building Lifecycle
All (95)Filed (9)Permit Issued (4)Signed Off (4)Violation (47)Inspection (7)Special Inspection (24)
05/05/2026
Violation issued (HPD, open)
A
03/24/2026
Signed off — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-S1
02/20/2026
Signed off — Alteration
Propose interior renovation at 3rd FL of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275860-I1
02/20/2026
Signed off — Alteration
Propose to interior renovation at 2nd FL of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01311973-I1
02/20/2026
Signed off — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-I1
02/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
01/26/2026
Special inspection requirement — Interior lighting power
Hanli Liu
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
01/22/2026
Filed — Alteration
Propose to interior renovation at 2nd FL of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01311973-P1
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Yang Xu
01/21/2026
Special inspection requirement — Interior lighting power
Yang Xu
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yang Xu
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Yang Xu
01/13/2026
Filed — Alteration
Propose interior renovation at 3rd FL of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275860-P1
01/09/2026
Special inspection requirement — Interior lighting power
Yang Xu
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Yang Xu
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Yang Xu
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
01/09/2026
Special inspection requirement — Interior lighting power
Hanli Liu
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jaeyoung Jang
01/09/2026
Special inspection requirement — Interior lighting power
Jaeyoung Jang
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yang Xu
01/08/2026
Filed — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-P1
01/08/2026
Filed — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-P3
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/10/2025
Permit issued — General Construction
B01311973-I1-GC
11/03/2025
Filed — Alteration
Propose to interior renovation at 2nd FL of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01311973-I1
10/21/2025
Permit issued — General Construction
B01275860-I1-GC
10/10/2025
Filed — Alteration
Propose interior renovation at 3rd FL of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275860-I1
10/10/2025
Filed — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-P2
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
09/16/2025
Permit issued — Plumbing
B01275816-S1-PL
09/12/2025
Permit issued — General Construction
B01275816-I1-GC
09/09/2025
Filed — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-S1
09/09/2025
Filed — Alteration
Propose to interior renovation of existing mixed use building with partition work and finish work as per plan. No change in use, egress, or occupancy.
B01275816-I1
06/10/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, closed)
I
04/11/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, closed)
I
03/24/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, open)
A
10/31/2019
Violation issued (HPD, closed)
I
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGREEN CITY BOX TRANS INC11/10/2025
DOB NOWGeneral ConstructionSigned-offGREEN CITY BOX TRANS INC10/21/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/16/2025
DOB NOWGeneral ConstructionSigned-offGREEN CITY BOX TRANS INC09/12/2025
BISOTISSUEDNEW YORK PLANNING & DESIGN INC08/12/2004
BIS—RE-ISSUEDKING'S ASSOCIATES11/18/2003
BISPLISSUEDK & BH PLUMBING & HTG INC05/23/2001
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM05/07/2001
BISOTISSUEDKING'S ASSOCIATES INC02/06/2001
1 project · most recent 01/06/2026
General Wiring
FiledStatusContractorScope
01/06/2026CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/04/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
11/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/26/2026Fire-Resistance Rated ConstructionHanli Liuprogress
01/26/2026Interior lighting powerHanli Liuenergy_progress
01/26/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
01/26/2026Energy Code Compliance InspectionsHanli Liuprogress
01/21/2026Energy Code Compliance InspectionsYang Xuprogress
01/21/2026Interior lighting powerYang Xuenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsYang Xuspecial
01/21/2026Fire-Resistance Rated ConstructionYang Xuprogress
01/09/2026Interior lighting powerYang Xuenergy_progress
01/09/2026Energy Code Compliance InspectionsYang Xuprogress
01/09/2026Fire-Resistance Rated ConstructionYang Xuprogress
01/09/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
01/09/2026Energy Code Compliance InspectionsHanli Liuprogress
01/09/2026Fire-Resistance Rated ConstructionHanli Liuprogress
01/09/2026Interior lighting powerHanli Liuenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
01/09/2026Energy Code Compliance InspectionsJaeyoung Jangprogress
01/09/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
01/09/2026Energy Code Compliance InspectionsJaeyoung Jangprogress
01/09/2026Fire-Resistance Rated ConstructionJaeyoung Jangprogress
01/09/2026Interior lighting powerJaeyoung Jangenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsYang Xuspecial
10/01/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
10/01/2025Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01311973-P1Request digital key ↗
08/20/2026B01311973-I1Request digital key ↗
08/19/2026B01275816-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B01275860-I1Open ↗
09/01/2026B01275860-I1Open ↗
08/30/2026B01275816-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01311973-P1Open ↗
08/20/2026B01311973-I1Open ↗
08/19/2026B01275816-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B01275860-I1Open ↗
08/30/2026B01275816-I1Open ↗
08/28/2026B01311973-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026B01311973-I1Open ↗
08/20/2026B01311973-P1Open ↗
08/19/2026B01275816-P2Open ↗
Showing 3 of 7 on file for this type