← Back
Miscellaneous warehouse
1086 GRAND STREET
BROOKLYN · East Williamsburg · BIN 3415921
💬 Discuss this project
1900Year Built
2Stories
E9Building Class
M3-1Zoning
3,375 sfGross Floor Area
1Units
Miscellaneous warehouse · Owner of record: GRAND METRO AUTO INC · 10,298 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
StructuralGeneral
Filed — no permit issued3p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCUS STRUCTURAL ENGINEERING108/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICROGRID NETWORKS203/21/2026
Building Lifecycle
All (11)Filed (1)Special Inspection (10)
08/19/2025
Filed — Alteration
installation of new ground mounted EV charger Automatic transfer switch equipment.
B01261568-I1
07/25/2025
Special inspection requirement — Concrete - Cast-In-Place
07/25/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/25/2025
Special inspection requirement — Post-installed Anchors
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/25/2025
Special inspection requirement — Subgrade Inspections
07/25/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/25/2025
Special inspection requirement — Lowest Floor Elevation
07/25/2025
Special inspection requirement — Preliminary
07/25/2025
Special inspection requirement — Final
07/25/2025
Special inspection requirement — Footing and Foundation
Nothing on file for this building.
1 project · most recent 08/19/2025
Concrete
FiledStatusContractorScope
08/19/2025——Concrete
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/25/2025Concrete - Cast-In-Place—special
07/25/2025Excavations - Sheeting, Shoring, and Bracing—special
07/25/2025Post-installed Anchors—special
07/25/2025Structural Stability – Alterations of existing buildings—special
07/25/2025Subgrade Inspections—special
07/25/2025Subsurface Conditions – Fill Placement & In-Place Density—special
07/25/2025Lowest Floor Elevation—progress
07/25/2025Preliminary—progress
07/25/2025Final—progress
07/25/2025Footing and Foundation—progress
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01261568-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01261568-I1Open ↗