Jamaica Children's School
109-02 BRINKERHOFF AVENUE · BIN 4263341
💬 Discuss this project
1931Year Built
5Stories
W1Building Class
R5Zoning
109,240 sfGross Floor Area
1Units
LL97 Covered12 Open Violations 1 unresolved · 11 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 174,283 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction45p · 2 filings · 20 docs
Floor 5Under Construction36p · 1 filing · 20 docs
Floor 4Under Construction40p · 2 filings · 20 docs
Floor 3Under Construction35p · 1 filing · 20 docs
Floor 2Under Construction35p · 1 filing · 20 docs
Floor 1Under Construction39p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION1509/01/2026
NYC SCHOOL CONSTRUCTION AUTHORITY2707/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION1303/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE PS 40103/22/2026
DEPT OF EDUCATION P.S.040403/22/2026
DEPT OF EDUCATION PS 40403/22/2026
D.O.E. P.S.040 0403/22/2026
DOE P.S 40 SAMUEL HUNTING203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREENMAN PEDERSEN803/21/2026
CASO ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LITEHOUSE BUILDERS INCGeneral Contractor1407/08/2026
FOURTH AVENUE MERCHANTS IGeneral Contractor407/08/2026
GENUINE PLBG & HTG LLCPlumbing307/08/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
CEDOMIR MARAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS ENGINEERS, P.C.7715604/02/2026
JPC LOGISTICS DBA JPCL EN351112/21/2025
UNIVERSAL TESTING AND INS400407/13/2022
Building Lifecycle
All (127)Filed (19)Permit Issued (15)Signed Off (2)Violation (60)Inspection (1)Special Inspection (30)
08/03/2026
Violation issued (ECB, open)
Unknown
05/26/2026
Violation issued (ECB, open)
Construction
04/10/2026
Special inspection requirement — Post-installed Anchors
LEOVIGILDO FONTANA
04/02/2026
Filed — Alteration
Q01372269-S1
04/02/2026
Filed — Alteration
Q01372269-I1
04/02/2026
Filed — Alteration
Q01372269-S2
03/15/2026
Special inspection requirement — Interior lighting power
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — Maintenance information
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — Lighting controls
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — Mechanical Systems
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — Final
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — Energy Code Compliance Inspections
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
LEOVIGILDO FONTANA
03/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
LEOVIGILDO FONTANA
02/27/2026
Filed — Alteration
Q01350352-S1
02/27/2026
Filed — Alteration
Q01350352-S2
02/27/2026
Permit issued — Plumbing
Q00851436-S1-PL
02/04/2026
Filed — Alteration
Q01350352-I1
01/05/2026
Permit issued — General Construction
Q00851436-I1-GC
12/21/2025
Filed — Alteration
Q01333366-I1
12/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
12/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
12/12/2025
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
12/12/2025
Special inspection requirement — Final
Asma Hashmi
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
12/12/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/12/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
12/11/2025
Permit issued — Sidewalk Shed
Q01115356-I1-SH
12/09/2025
Permit issued — Supported Scaffold
Q01115363-I1-SF
11/21/2025
Permit issued — Construction Fence
Q01115246-I1-FN
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Violation issued (ECB, open)
Construction
10/23/2025
Violation issued (ECB, open)
Construction
10/23/2025
Violation issued (ECB, open)
Construction
02/28/2025
Permit issued — Plumbing
Q00851436-S1-PL
02/19/2025
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD ON GROUND FLOOR, ON TOP OF SIDEWALK SHED AND ON ROOF TO PERFORM CONSTRUCTION WORK
Q01115363-P1
02/17/2025
Special inspection requirement — Post-installed Anchors
Mohamed Shahid
01/22/2025
Signed off — Alteration
Replace the gas-fired domestic water heater including related natural gas piping, domestic water piping, and flue.
Q00576446-I1
01/22/2025
Signed off — Alteration
Replace the gas-fired domestic water heater including related natural gas piping, domestic water piping, and flue.
Q00576446-S1
01/03/2025
Permit issued — General Construction
Q00851436-I1-GC
12/13/2024
Violation issued (FDNY_NOV, closed)
12/12/2024
Permit issued — Supported Scaffold
Q01115363-I1-SF
11/21/2024
Permit issued — Construction Fence
Q01115246-I1-FN
11/21/2024
Permit issued — Sidewalk Shed
Q01115356-I1-SH
10/03/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE DURING CONSTRUCTION TO PROTECT THE PUBLIC
Q01115246-I1
09/23/2024
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD ON GROUND FLOOR, ON TOP OF SIDEWALK SHED AND ON ROOF TO PERFORM CONSTRUCTION WORK
Q01115363-I1
09/23/2024
Filed — Alteration
Q01115356-I1
06/28/2024
Violation issued (ECB, open)
Construction
06/28/2024
Violation issued (ECB, open)
Construction
06/28/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC02/27/2026
DOB NOWGeneral ConstructionPermit IssuedLITEHOUSE BUILDERS INC01/05/2026
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC12/11/2025
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC12/09/2025
DOB NOWConstruction FencePermit IssuedLITEHOUSE BUILDERS INC11/21/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC02/28/2025
DOB NOWGeneral ConstructionPermit IssuedLITEHOUSE BUILDERS INC01/03/2025
DOB NOWSupported ScaffoldPermit IssuedLITEHOUSE BUILDERS INC12/12/2024
DOB NOWConstruction FencePermit IssuedLITEHOUSE BUILDERS INC11/21/2024
DOB NOWSidewalk ShedPermit IssuedLITEHOUSE BUILDERS INC11/21/2024
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC01/12/2024
DOB NOWMechanical SystemsSigned-offFOURTH AVENUE MERCHANTS I08/08/2023
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC03/28/2023
DOB NOWPlumbingSigned-offGENUINE PLBG & HTG LLC07/21/2022
DOB NOWMechanical SystemsSigned-offFOURTH AVENUE MERCHANTS I07/20/2022
BISPLISSUEDFORSYTHE P&H CORP05/01/2025
BISPLISSUEDFORSYTHE P&H CORP06/07/2024
BISOTISSUEDUTB-UNITED TECHNOLOGY INC06/06/2024
BISOTISSUEDUTB-UNITED TECHNOLOGY INC07/18/2023
BISOTISSUEDUTB-UNITED TECHNOLOGY INC06/07/2023
BISOTISSUEDUTB-UNITED TECHNOLOGY INC06/07/2023
BISOTISSUEDUTB-UNITED TECHNOLOGY INC05/30/2023
BISOTISSUEDUTB-UNITED TECHNOLOGY INC03/02/2023
BISOTISSUEDUTB-UNITED TECHNOLOGY INC02/27/2023
BISPLISSUEDFORSYTHE P&H CORP02/24/2023
BISOTISSUEDMSM.EMPIRE CONSTRUCTION11/02/2022
BISOTISSUEDUTB-UNITED TECHNOLOGY INC04/22/2021
BISOTISSUEDUTB-UNITED TECHNOLOGY INC04/22/2021
BISOTISSUEDUTB-UNITED TECHNOLOGY INC07/29/2020
BISPLISSUEDFORSYTHE P&H CORP07/09/2020
BISEQISSUEDUTB-UNITED TECHNOLOGY INC11/22/2019
BISEQISSUEDUTB-UNITED TECHNOLOGY INC10/21/2019
BISEQISSUEDUTB-UNITED TECHNOLOGY INC10/21/2019
BISOTISSUEDUTB-UNITED TECHNOLOGY INC06/03/2019
BISEQISSUEDUTB-UNITED TECHNOLOGY INC10/03/2018
BISEQISSUEDUTB-UNITED TECHNOLOGY INC09/26/2018
BISEQISSUEDUTB-UNITED TECHNOLOGY INC09/26/2018
BISEQISSUEDUTB-UNITED TECHNOLOGY INC09/26/2018
BISOTISSUEDUTB-UNITED TECHNOLOGY INC07/09/2018
BISOTISSUEDUTB-UNITED TECHNOLOGY INC07/09/2018
+ 25 more permits on file
1 project · most recent 05/07/2024
Storm
FiledStatusContractorScope
05/07/2024Permit IssuedVARSITY PLBG AND HTG INCStorm
10 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026CompleteCHARAN ELEC'L ENTERP'S IN—
10/10/2025CompleteCHARAN ELEC'L ENTERP'S IN—
10/08/2025Permit IssuedAUJLA ELECTRIC CORP—
07/09/2025Permit IssuedEVEREST ELECTRIC CORPGeneral Wiring
09/30/2024Permit IssuedWILLDAN ELECTRICAL OF NYGeneral Wiring
04/03/2023CompleteLIU ELECTRIC, LLCGeneral Wiring
09/07/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/15/2021CompleteADVANCE LIGHT & PWR ELECTGeneral Wiring
02/10/2020CompleteTRINCITY ELECTRIC, INCGeneral Wiring
09/09/2019CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 05/07/2024
FiledStatusContractorScope
05/07/2024Permit IssuedVARSITY PLBG AND HTG INC1 scope_items
2 projects · most recent 02/19/2025
Scaffold Fence
FiledStatusContractorScope
02/19/2025Permit IssuedLITEHOUSE BUILDERS INCScaffold
10/03/2024Permit IssuedLITEHOUSE BUILDERS INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
04/10/2026Post-installed AnchorsLEOVIGILDO FONTANAspecial
03/15/2026Interior lighting powerLEOVIGILDO FONTANAenergy_progress
03/15/2026Maintenance informationLEOVIGILDO FONTANAenergy_progress
03/15/2026Lighting controlsLEOVIGILDO FONTANAenergy_progress
03/15/2026Mechanical SystemsLEOVIGILDO FONTANAspecial
03/15/2026Fire-Resistant Penetrations and JointsLEOVIGILDO FONTANAspecial
03/15/2026FinalLEOVIGILDO FONTANAprogress
03/15/2026Energy Code Compliance InspectionsLEOVIGILDO FONTANAprogress
03/15/2026HVAC-R and service water piping design and insulationLEOVIGILDO FONTANAenergy_progress
03/15/2026HVAC-R and service water heating equipmentLEOVIGILDO FONTANAenergy_progress
03/15/2026HVAC-R and service water heating system controlsLEOVIGILDO FONTANAenergy_progress
12/12/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
12/12/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
12/12/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
12/12/2025Duct leakage testing, insulation and designAsma Hashmienergy_progress
12/12/2025FinalAsma Hashmiprogress
12/12/2025Energy Code Compliance InspectionsAsma Hashmiprogress
12/12/2025Post-installed AnchorsAsma Hashmispecial
12/12/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/12/2025Mechanical SystemsAsma Hashmispecial
02/17/2025Post-installed AnchorsMohamed Shahidspecial
05/07/2024Fenestration and door U-factor and product ratingsMohamed Shahidenergy_progress
05/07/2024Fenestration air leakageMohamed Shahidenergy_progress
05/07/2024Insulation placement and R valuesMohamed Shahidenergy_progress
05/07/2024Fenestration areasMohamed Shahidenergy_progress
Latest 25 of 49.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ps 40qEducation—
Project Q01115246 Alteration · Permit Entire · 10/03/2024
P.S. 40 - QueensEducationFloors 1–5, Roof
Project Q00851436 Alteration · Permit Entire · 03/29/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026Q00576446-P1Request digital key ↗
08/27/2026Q00576446-P2Request digital key ↗
08/27/2026Q00576446-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
09/28/2023440592949Open ↗
06/17/2022440592949Open ↗
04/07/2022440592949Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
11/02/2022440592949Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026Q00576446-I1Open ↗
08/27/2026Q00576446-S1Open ↗
08/25/2026Q00851436-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q00576446-I1Open ↗
09/01/2026Q01372269-S1Open ↗
09/01/2026Q01372269-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00576446-I1Open ↗
09/01/2026Q01115363-P1Open ↗
09/01/2026Q01372269-S1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/01/2020440592949Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026Q01115363-P1Open ↗
08/13/2026Q01115363-I1Open ↗
08/13/2026Q01115356-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00576446-S1Open ↗
08/27/2026Q00576446-I1Open ↗
08/13/2026Q00576446-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00576446-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/12/2023440592949Open ↗
05/04/2020440592949Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/30/2023440592949Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
10/13/2023440592949Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/30/2023440592949Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
08/30/2023440592949Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/27/2026Q00576446-I1Open ↗
08/27/2026Q00576446-S1Open ↗
08/25/2026Q00851436-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
08/27/2026Q00576446-S1Open ↗
08/27/2026Q00576446-I1Open ↗
08/17/2026Q01372269-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/17/2026Q01372269-S2Open ↗
08/17/2026Q01372269-I1Open ↗
08/17/2026Q01372269-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/25/2026Q00851436-S1Open ↗
08/25/2026Q00851436-I1Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
10/12/2023440592949Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/23/2020440592949Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/16/2023440592949Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
05/01/2020440592949Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/30/2023440592949Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/23/2020440592949Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
10/10/2023440592949Open ↗
08/02/2022440592949Open ↗
01/11/2021440592949Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2020440592949Open ↗
▸Other Documents19
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
08/27/2026Q00576446-I1Open ↗
08/27/2026Q00576446-S1Open ↗
08/17/2026Q01372269-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00851436-P1Open ↗
08/13/2026Q00851436-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026Q00576446-I1Open ↗
08/13/2026Q00576446-S1Open ↗