ECB10/01/2020I OBSERVED IN THE BUILDING NEWLY-INSTALLED GAS PIPING WITH NEW GAS VALVE FOR GAS STOVE ON THE 1ST FLOOR AND HOT WATER HEATER IN THE CELLAR AREA. NO RECORDS AT DOB OF ANY TEST OR INSPECTIONS BEING PERFORMED ON TNothing owed — awaiting certificate of correction
Cape Cod · 3,887 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.